M60 Clockwise Jct 7 exit slip to CD link lane 1 closure
ActiveM60 Clockwise Jct 7 exit slip to CD link lane 1 closure
- Start time
- Fri, Oct 23, 2026 7:40 PM
- Expected end
- Sat, Oct 24, 2026 5:00 AM
- Duration
- 9 hours 20 minutes
- Road
- M60 – Connector At M60 J6 Clockwise
- Category
- Road Maintenance
- Direction
- Clockwise
- Carriageway
- Distributorlane
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Oct 23, 2026 7:40 PM
- Last updated
- Fri, Oct 23, 2026 10:44 PM
- Cleared
- Sat, Oct 24, 2026 5:00 AM
- Latest update: M60 Clockwise Jct 7 exit slip to CD link lane 1 closure
- Coordinates
- 53.429656, -2.298354
- Latitude span
- 53.429051 – 53.430023
- Longitude span
- -2.299294 – -2.296827
- Bounding box centre
- 53.429537, -2.298061
- Location descriptions
-
- connector at M60 J6 clockwise
- M60 clockwise between J6 and J7
- Feed validity status
- Active
- Overall feed start
- Fri, Oct 23, 2026 7:40 PM
- Overall feed end
- Sat, Oct 24, 2026 5:00 AM
- Feed window length
- 9 hours 20 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- connector at M60 J6 clockwise
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {E5E59B1C-5F06-42B9-A30F-5EBB9FAE9165}
- Linear Element Type
- Other
- From Distance
- 2 m
- To Distance
- 190 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.429051 -2.296827 53.429235 -2.29729 53.429985 -2.29918
Segment 2
2 coordinate pairs- Description
- M60 clockwise between J6 and J7
- Carriageway
- Distributor Lane
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {577BB749-0B67-4173-8654-9C35E5416F23}
- Linear Element Type
- Other
- From Distance
- 0 m
- To Distance
- 8 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.429985 -2.29918 53.430023 -2.299294
- Geometry type
- MultiLineString
- Geometry points
- 5
- First coordinate pair
- -2.296827, 53.429051
- Road section segments
- 1
- Road section points
- 5
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.296827,
53.429051
],
[
-2.29729,
53.429235
],
[
-2.29918,
53.429985
],
[
-2.29918,
53.429985
],
[
-2.299294,
53.430023
]
]
]
}
View road section coordinates
[
[
[
-2.296827,
53.429051
],
[
-2.29729,
53.429235
],
[
-2.29918,
53.429985
],
[
-2.29918,
53.429985
],
[
-2.299294,
53.430023
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 5
- Record created
- Fri, Oct 23, 2026 7:40 PM
- Record versioned
- Fri, Oct 23, 2026 10:44 PM
- Coordinate source
- Geometry
Driving on the M60? See every live closure, roadwork and planned restriction on this road.
M60 live closuresRelated incidents
M60 anticlockwise lane 1 closure (MP 5/8 to 4/3)
Active Roadworks National HighwaysExpected to clear in 6 hours 5 minutes
M60 anticlockwise lane 1 closure (MP 5/8 to 4/3)
M56 Eastbound Jct 6 to 4 hardshoulder closure
Active Roadworks National HighwaysExpected to clear in 2 weeks 4 days
M56 Eastbound Jct 6 to 4 hardshoulder closure
Mobile hardshoulder closure Clockwise and Anticlockwise
Active Roadworks National HighwaysExpected to clear in 5 months 1 week
Mobile hardshoulder closure Clockwise and Anticlockwise
M60 anticlockwise lane 1 closure (MP 5/8 to 4/3)
Planned Roadworks National HighwaysStarts in 4 minutes 3 seconds
M60 anticlockwise lane 1 closure (MP 5/8 to 4/3)
M60 Clockwise lane 1 closure (MP 22/2 - 24/0)
Planned Roadworks National HighwaysStarts in 4 minutes 3 seconds
M60 Clockwise lane 1 closure (MP 22/2 - 24/0)
M60 Clockwise lane 1 closure (MP 49/1 to 52/2)
Planned Roadworks National HighwaysStarts in 4 minutes 3 seconds
M60 Clockwise lane 1 closure (MP 49/1 to 52/2)