M60 Clockwise Jct 18 exit slip road closure
PlannedM60 Clockwise Jct 18 exit slip road closure
- Start time
- Fri, Aug 14, 2026 8:00 PM
- Expected end
- Sat, Aug 15, 2026 5:00 AM
- Duration
- 9 hours
- Road
- M60 – M60 J18 Clockwise Exit
- Category
- Construction Work
- Direction
- Clockwise
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Aug 13, 2026 12:35 AM
- Last updated
- Fri, Aug 14, 2026 5:43 AM
- Cleared
- Sat, Aug 15, 2026 5:00 AM
- Latest update: M60 Clockwise Jct 18 exit slip road closure
- Coordinates
- 53.549111, -2.263415
- Latitude span
- 53.548192 – 53.549747
- Longitude span
- -2.265675 – -2.262127
- Bounding box centre
- 53.548970, -2.263901
- Location descriptions
-
- M60 J18 clockwise exit
- M60 J18 clockwise exit for M62
- Feed validity status
- Planned
- Overall feed start
- Fri, Aug 14, 2026 8:00 PM
- Overall feed end
- Sat, Aug 15, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- M60 J18 clockwise exit
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {E6F8BDB3-6A79-443C-ABE5-9F4B72049E44}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 55 m
- To Distance
- 245 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.548192 -2.265675 53.548231 -2.265584 53.548638 -2.264499 53.548846 -2.263972 53.549054 -2.263446 53.549126 -2.26328
Segment 2
6 coordinate pairs- Description
- M60 J18 clockwise exit for M62
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {CE12261F-1CE4-4830-BDF0-DA48FFFCA087}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 104 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.549126 -2.26328 53.549497 -2.262422 53.549569 -2.262287 53.549596 -2.262257 53.549713 -2.262152 53.549747 -2.262127
- Geometry type
- MultiLineString
- Geometry points
- 12
- First coordinate pair
- -2.265675, 53.548192
- Road section segments
- 1
- Road section points
- 12
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.265675,
53.548192
],
[
-2.265584,
53.548231
],
[
-2.264499,
53.548638
],
[
-2.263972,
53.548846
],
[
-2.263446,
53.549054
],
[
-2.26328,
53.549126
],
[
-2.26328,
53.549126
],
[
-2.262422,
53.549497
],
[
-2.262287,
53.549569
],
[
-2.262257,
53.549596
],
[
-2.262152,
53.549713
],
[
-2.262127,
53.549747
]
]
]
}
View road section coordinates
[
[
[
-2.265675,
53.548192
],
[
-2.265584,
53.548231
],
[
-2.264499,
53.548638
],
[
-2.263972,
53.548846
],
[
-2.263446,
53.549054
],
[
-2.26328,
53.549126
],
[
-2.26328,
53.549126
],
[
-2.262422,
53.549497
],
[
-2.262287,
53.549569
],
[
-2.262257,
53.549596
],
[
-2.262152,
53.549713
],
[
-2.262127,
53.549747
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Aug 13, 2026 12:35 AM
- Record versioned
- Fri, Aug 14, 2026 5:43 AM
- Coordinate source
- Geometry
Driving on the M60? See every live closure, roadwork and planned restriction on this road.
M60 live closuresRelated incidents
M60 Anticlockwise Jct 25 entry slip road hardshoulder closure
Active Roadworks National HighwaysExpected to clear in 3 months 2 weeks
M60 Anticlockwise Jct 25 entry slip road hardshoulder closure
M66 Mobile hardshoulder closure North & Southbound
Active Roadworks National HighwaysExpected to clear in 7 months 2 weeks
M66 Mobile hardshoulder closure North & Southbound
M66 southbound jct 2 entry slip road closure
Planned Roadworks National HighwaysStarts in 13 hours 29 minutes
M66 southbound jct 2 entry slip road closure
M60 anticlockwise lane 1 closure (MP 5/8 to 4/3)
Planned Roadworks National HighwaysStarts in 13 hours 29 minutes
M60 anticlockwise lane 1 closure (MP 5/8 to 4/3)
M60 Anticlockwise Lanes 2 and 3 closure (MP 1/3 to 53/7)
Planned Roadworks National HighwaysStarts in 13 hours 29 minutes
M60 Anticlockwise Lanes 2 and 3 closure (MP 1/3 to 53/7)
M60 Anticlockwise Jct 11 exit slip road closure
Planned Roadworks National HighwaysStarts in 13 hours 29 minutes
M60 Anticlockwise Jct 11 exit slip road closure