M60 Clockwise hardshoulder closure (MP 51/0 to 51/7)
ActiveM60 Clockwise hardshoulder closure (MP 51/0 to 51/7)
- Start time
- Thu, Oct 15, 2026 9:00 AM
- Expected end
- Thu, Oct 15, 2026 4:00 PM
- Duration
- 7 hours
- Road
- M60 – M60 Clockwise Between J24 And J25
- Category
- Road Maintenance
- Direction
- Clockwise
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Oct 15, 2026 9:00 AM
- Last updated
- Thu, Oct 15, 2026 11:17 AM
- Cleared
- Thu, Oct 15, 2026 4:00 PM
- Latest update: M60 Clockwise hardshoulder closure (MP 51/0 to 51/7)
- Coordinates
- 53.438293, -2.129931
- Latitude span
- 53.435251 – 53.441758
- Longitude span
- -2.131836 – -2.128280
- Bounding box centre
- 53.438505, -2.130058
- Location descriptions
-
- M60 clockwise between J24 and J25
- Feed validity status
- Active
- Overall feed start
- Thu, Oct 15, 2026 9:00 AM
- Overall feed end
- Thu, Oct 15, 2026 4:00 PM
- Feed window length
- 7 hours
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
14 coordinate pairs- Description
- M60 clockwise between J24 and J25
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {BECCC200-C4F8-4CE6-9255-20F5F1D95B2B}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 494 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.439473 -2.130612 53.439417 -2.13058 53.43882 -2.13024 53.438334 -2.129963 53.438222 -2.129899 53.438213 -2.129884 53.437423 -2.129415 53.436713 -2.128991 53.435987 -2.12862 53.435977 -2.128615 53.435914 -2.128583 53.435671 -2.128461 53.435428 -2.128355 53.435251 -2.12828
Segment 2
6 coordinate pairs- Description
- M60 clockwise between J24 and J25
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {38B257AD-1849-4C48-8352-2991CF434E0C}
- Linear Element Type
- A Carriageway
- From Distance
- 144 m
- To Distance
- 411 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.441758 -2.131836 53.441462 -2.131685 53.441402 -2.131655 53.440648 -2.131258 53.440279 -2.131065 53.439473 -2.130612
- Geometry type
- MultiLineString
- Geometry points
- 20
- First coordinate pair
- -2.130612, 53.439473
- Road section segments
- 1
- Road section points
- 20
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.130612,
53.439473
],
[
-2.13058,
53.439417
],
[
-2.13024,
53.43882
],
[
-2.129963,
53.438334
],
[
-2.129899,
53.438222
],
[
-2.129884,
53.438213
],
[
-2.129415,
53.437423
],
[
-2.128991,
53.436713
],
[
-2.12862,
53.435987
],
[
-2.128615,
53.435977
],
[
-2.128583,
53.435914
],
[
-2.128461,
53.435671
],
[
-2.128355,
53.435428
],
[
-2.12828,
53.435251
],
[
-2.131836,
53.441758
],
[
-2.131685,
53.441462
],
[
-2.131655,
53.441402
],
[
-2.131258,
53.440648
],
[
-2.131065,
53.440279
],
[
-2.130612,
53.439473
]
]
]
}
View road section coordinates
[
[
[
-2.130612,
53.439473
],
[
-2.13058,
53.439417
],
[
-2.13024,
53.43882
],
[
-2.129963,
53.438334
],
[
-2.129899,
53.438222
],
[
-2.129884,
53.438213
],
[
-2.129415,
53.437423
],
[
-2.128991,
53.436713
],
[
-2.12862,
53.435987
],
[
-2.128615,
53.435977
],
[
-2.128583,
53.435914
],
[
-2.128461,
53.435671
],
[
-2.128355,
53.435428
],
[
-2.12828,
53.435251
],
[
-2.131836,
53.441758
],
[
-2.131685,
53.441462
],
[
-2.131655,
53.441402
],
[
-2.131258,
53.440648
],
[
-2.131065,
53.440279
],
[
-2.130612,
53.439473
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Oct 15, 2026 9:00 AM
- Record versioned
- Thu, Oct 15, 2026 11:17 AM
- Coordinate source
- Geometry
Driving on the M60? See every live closure, roadwork and planned restriction on this road.
M60 live closuresRelated incidents
M60 Anticlockwise Jct 25 entry slip road hardshoulder closure
Active Roadworks National HighwaysExpected to clear in 1 month 2 weeks
M60 Anticlockwise Jct 25 entry slip road hardshoulder closure
M60 Clockwise Jct 19 entry slip road closure
Planned Roadworks National HighwaysStarts in 8 hours 16 minutes
M60 Clockwise Jct 19 entry slip road closure
M6 Northbound Lanes 2 and 3 closure with hardshoulder running at 20/9 (MP 19/7 to 25/0)
Planned Roadworks National HighwaysStarts in 7 hours 16 minutes
M6 Northbound Lanes 2 and 3 closure with hardshoulder running at 20/9 (MP 19/7 to 25/0)
A663 Eastbound Broadgate carriageway closure
Planned Roadworks National HighwaysStarts in 7 hours 16 minutes
A663 Eastbound Broadgate carriageway closure
A663 Northbound Stott Lane to Broadgate lane 1 closure
Planned Roadworks National HighwaysStarts in 7 hours 16 minutes
A663 Northbound Stott Lane to Broadgate lane 1 closure
M60 Clockwise hardshoulder closure (MP 51/0 to 51/7)
Cleared Roadworks National HighwaysCleared 3 hours 43 minutes ago
M60 Clockwise hardshoulder closure (MP 51/0 to 51/7)