M60 clockwise hard shoulder closure (MP 40/6 to 40/9)
ClearedM60 clockwise hard shoulder closure (MP 40/6 to 40/9)
- Start time
- Wed, Mar 18, 2026 9:00 AM
- Expected end
- Wed, Mar 18, 2026 5:00 PM
- Duration
- 8 hours
- Road
- M60 – M60 Clockwise Within J22
- Category
- Road Maintenance
- Direction
- Clockwise
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Mar 18, 2026 8:50 AM
- Last updated
- Wed, Mar 18, 2026 1:17 PM
- Cleared
- Wed, Mar 18, 2026 5:00 PM
- Latest update: M60 clockwise hard shoulder closure (MP 40/6 to 40/9)
- Coordinates
- 53.521987, -2.149261
- Latitude span
- 53.521510 – 53.522588
- Longitude span
- -2.151577 – -2.147477
- Bounding box centre
- 53.522049, -2.149527
- Location descriptions
-
- M60 clockwise within J22
- M60 clockwise between J21 and J22
- Feed validity status
- Planned
- Overall feed start
- Wed, Mar 18, 2026 9:00 AM
- Overall feed end
- Wed, Mar 18, 2026 5:00 PM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M60 clockwise within J22
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {C63791E6-664A-44D8-9BFD-F4CE7D962663}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 122 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.521972 -2.14916 53.521793 -2.148481 53.521542 -2.14759 53.52151 -2.147477
Segment 2
3 coordinate pairs- Description
- M60 clockwise between J21 and J22
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {AB7B56BB-CB0D-490C-82E4-1947E264CF66}
- Linear Element Type
- A Carriageway
- From Distance
- 441 m
- To Distance
- 615 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.522588 -2.151577 53.522535 -2.151379 53.521972 -2.14916
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- -2.149160, 53.521972
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.14916,
53.521972
],
[
-2.148481,
53.521793
],
[
-2.14759,
53.521542
],
[
-2.147477,
53.52151
],
[
-2.151577,
53.522588
],
[
-2.151379,
53.522535
],
[
-2.14916,
53.521972
]
]
]
}
View road section coordinates
[
[
[
-2.14916,
53.521972
],
[
-2.148481,
53.521793
],
[
-2.14759,
53.521542
],
[
-2.147477,
53.52151
],
[
-2.151577,
53.522588
],
[
-2.151379,
53.522535
],
[
-2.14916,
53.521972
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Mar 18, 2026 8:50 AM
- Record versioned
- Wed, Mar 18, 2026 1:17 PM
- Coordinate source
- Geometry
Driving on the M60? See every live closure, roadwork and planned restriction on this road.
M60 live closuresRelated incidents
Mobile hardshoulder closure Clockwise and Anticlockwise
Active Roadworks National HighwaysExpected to clear in 9 months 2 weeks
Mobile hardshoulder closure Clockwise and Anticlockwise
M67 Eastbound Lane 3 closures /narrow lanes closure 1/4 to 2/4
Active Roadworks National HighwaysExpected to clear in 2 weeks 15 hours
M67 Eastbound Lane 3 closures /narrow lanes closure 1/4 to 2/4
M60 Clockwise Jct 2 entry slip road Lane 1 closure
Planned Roadworks National HighwaysStarts in 15 hours 16 seconds
M60 Clockwise Jct 2 entry slip road Lane 1 closure
M60 Clockwise Lanes 1 and 2 closure (MP 45/5 to 47/6)
Planned Roadworks National HighwaysStarts in 14 hours 16 seconds
M60 Clockwise Lanes 1 and 2 closure (MP 45/5 to 47/6)
M62 westbound jct 18 exit slip road closure and dedicated lane
Cleared Roadworks National HighwaysCleared 29 minutes 41 seconds ago
M62 westbound jct 18 exit slip road closure and dedicated lane
M60 Clockwise lane 3 closure (MP 38/1 to 41/0)
Cleared Roadworks National HighwaysCleared 1 hour 9 minutes ago
M60 Clockwise lane 3 closure (MP 38/1 to 41/0)