M60 Anticlockwise Jct 9 entry slip road Lane 2 closure
PlannedM60 Anticlockwise Jct 9 entry slip road Lane 2 closure
- Start time
- Wed, Mar 18, 2026 8:00 PM
- Expected end
- Thu, Mar 19, 2026 5:00 AM
- Duration
- 9 hours
- Road
- M60 – M60 J9 Anti-Clockwise Access
- Category
- Road Maintenance
- Direction
- Anticlockwise
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 1 lanes affected, 1 of 3 lanes affected
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Mar 12, 2026 12:18 PM
- Last updated
- Wed, Mar 18, 2026 8:42 PM
- Cleared
- Thu, Mar 19, 2026 5:00 AM
- Latest update: M60 Anticlockwise Jct 9 entry slip road Lane 2 closure
- Coordinates
- 53.455735, -2.338576
- Latitude span
- 53.452825 – 53.457678
- Longitude span
- -2.339344 – -2.338277
- Bounding box centre
- 53.455252, -2.338811
- Location descriptions
-
- M60 J9 anti-clockwise access
- M60 anti-clockwise between J9 and J8
- Feed validity status
- Planned
- Overall feed start
- Wed, Mar 18, 2026 8:00 PM
- Overall feed end
- Thu, Mar 19, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- M60 J9 anti-clockwise access
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {05ACB093-0F19-405B-A0ED-52B37A1B51EB}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 22 m
- To Distance
- 234 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.457678 -2.338367 53.457651 -2.338377 53.457606 -2.338377 53.456914 -2.338296 53.456411 -2.338277 53.456069 -2.338304 53.45579 -2.338408
Segment 2
6 coordinate pairs- Description
- M60 anti-clockwise between J9 and J8
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {51F1C0F1-C909-486D-828D-971A11FBAB6C}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 335 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.45579 -2.338408 53.455619 -2.338466 53.455367 -2.33854 53.453721 -2.339064 53.453109 -2.33926 53.452825 -2.339344
- Geometry type
- MultiLineString
- Geometry points
- 13
- First coordinate pair
- -2.338367, 53.457678
- Road section segments
- 1
- Road section points
- 13
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.338367,
53.457678
],
[
-2.338377,
53.457651
],
[
-2.338377,
53.457606
],
[
-2.338296,
53.456914
],
[
-2.338277,
53.456411
],
[
-2.338304,
53.456069
],
[
-2.338408,
53.45579
],
[
-2.338408,
53.45579
],
[
-2.338466,
53.455619
],
[
-2.33854,
53.455367
],
[
-2.339064,
53.453721
],
[
-2.33926,
53.453109
],
[
-2.339344,
53.452825
]
]
]
}
View road section coordinates
[
[
[
-2.338367,
53.457678
],
[
-2.338377,
53.457651
],
[
-2.338377,
53.457606
],
[
-2.338296,
53.456914
],
[
-2.338277,
53.456411
],
[
-2.338304,
53.456069
],
[
-2.338408,
53.45579
],
[
-2.338408,
53.45579
],
[
-2.338466,
53.455619
],
[
-2.33854,
53.455367
],
[
-2.339064,
53.453721
],
[
-2.33926,
53.453109
],
[
-2.339344,
53.452825
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Mar 12, 2026 12:18 PM
- Record versioned
- Wed, Mar 18, 2026 8:42 PM
- Coordinate source
- Geometry
Related incidents
M60 anticlockwise lanes 2 and 3 closure (MP 1/3 to 52/3)
Planned National HighwaysM60 anticlockwise lanes 2 and 3 closure (MP 1/3 to 52/3)
M60 Clockwise Jct 22 exit slip road Lane closure
Planned National HighwaysM60 Clockwise Jct 22 exit slip road Lane closure
Mobile hardshoulder closure Clockwise and Anticlockwise
Active National HighwaysMobile hardshoulder closure Clockwise and Anticlockwise
M60 Clockwise Jct 22 exit slip road Lane closure
Planned National HighwaysM60 Clockwise Jct 22 exit slip road Lane closure
M60 anticlockwise lanes 2 and 3 closure (MP 1/3 to 52/3)
Planned National HighwaysM60 anticlockwise lanes 2 and 3 closure (MP 1/3 to 52/3)
M60 anticlockwise lanes 2 and 3 closure (MP 1/3 to 52/3)
Planned National HighwaysM60 anticlockwise lanes 2 and 3 closure (MP 1/3 to 52/3)