M60 Anticlockwise Jct 7 entry slip road lane 1 closure
ClearedM60 Anticlockwise Jct 7 entry slip road lane 1 closure
- Start time
- Fri, Jul 31, 2026 8:00 PM
- Expected end
- Sat, Aug 1, 2026 5:00 AM
- Duration
- 9 hours
- Road
- M60 – M60 J7 Anti-Clockwise Access
- Category
- Road Maintenance
- Direction
- Anticlockwise
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jul 15, 2026 1:15 PM
- Last updated
- Sat, Aug 1, 2026 4:43 AM
- Cleared
- Sat, Aug 1, 2026 5:00 AM
- Latest update: M60 Anticlockwise Jct 7 entry slip road lane 1 closure
- Coordinates
- 53.437545, -2.314120
- Latitude span
- 53.437295 – 53.437723
- Longitude span
- -2.314428 – -2.313748
- Bounding box centre
- 53.437509, -2.314088
- Location descriptions
-
- M60 J7 anti-clockwise access
- Feed validity status
- Planned
- Overall feed start
- Fri, Jul 31, 2026 8:00 PM
- Overall feed end
- Sat, Aug 1, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M60 J7 anti-clockwise access
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {44DA3920-D7AF-436E-9A0D-50A91D4F3474}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 31 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.437511 -2.314055 53.437295 -2.313748
Segment 2
3 coordinate pairs- Description
- M60 J7 anti-clockwise access
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {C0D717A7-9AAF-46DD-B754-8EF2036191DB}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 6 m
- To Distance
- 41 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.437723 -2.314428 53.437687 -2.314316 53.437511 -2.314055
- Geometry type
- MultiLineString
- Geometry points
- 5
- First coordinate pair
- -2.314055, 53.437511
- Road section segments
- 1
- Road section points
- 5
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.314055,
53.437511
],
[
-2.313748,
53.437295
],
[
-2.314428,
53.437723
],
[
-2.314316,
53.437687
],
[
-2.314055,
53.437511
]
]
]
}
View road section coordinates
[
[
[
-2.314055,
53.437511
],
[
-2.313748,
53.437295
],
[
-2.314428,
53.437723
],
[
-2.314316,
53.437687
],
[
-2.314055,
53.437511
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Jul 15, 2026 1:15 PM
- Record versioned
- Sat, Aug 1, 2026 4:43 AM
- Coordinate source
- Geometry
Driving on the M60? See every live closure, roadwork and planned restriction on this road.
M60 live closuresRelated incidents
M60 Anticlockwise Jct 25 entry slip road hardshoulder closure
Active Roadworks National HighwaysExpected to clear in 4 months 16 hours
M60 Anticlockwise Jct 25 entry slip road hardshoulder closure
M60 Anticlockwise Jct 24 entry slip road lane 1 closure
Planned Roadworks National HighwaysStarts in 7 hours 50 minutes
M60 Anticlockwise Jct 24 entry slip road lane 1 closure
M60 anticlockwise lane 1 and 2 closure (MP 51/2 to 46/7)
Planned Roadworks National HighwaysStarts in 7 hours 50 minutes
M60 anticlockwise lane 1 and 2 closure (MP 51/2 to 46/7)
M62 Eastbound lanes 1 and 2 closure (MP 35/0 to 39/5)
Planned Roadworks National HighwaysStarts in 7 hours 50 minutes
M62 Eastbound lanes 1 and 2 closure (MP 35/0 to 39/5)
M60 Anticlockwise lanes 2 and 3 closure (MP 21/8 to 20/0)
Cleared Roadworks National HighwaysCleared 14 hours 9 minutes ago
M60 Anticlockwise lanes 2 and 3 closure (MP 21/8 to 20/0)
M60 anticlockwise lane 1 and 2 closure (MP 51/2 to 46/7)
Cleared Roadworks National HighwaysCleared 16 hours 9 minutes ago
M60 anticlockwise lane 1 and 2 closure (MP 51/2 to 46/7)