M60 anticlockwise jct 7 entry slip road closure
PlannedM60 anticlockwise jct 7 entry slip road closure
- Start time
- Fri, Aug 21, 2026 7:00 PM
- Expected end
- Sat, Aug 22, 2026 5:00 AM
- Duration
- 10 hours
- Road
- M60 – M60 J7 Anti-Clockwise Access
- Category
- Road Maintenance
- Direction
- Anticlockwise
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Aug 21, 2026 4:34 AM
- Last updated
- Fri, Aug 21, 2026 3:49 PM
- Cleared
- Sat, Aug 22, 2026 5:00 AM
- Latest update: M60 anticlockwise jct 7 entry slip road closure
- Coordinates
- 53.437545, -2.314120
- Latitude span
- 53.437295 – 53.437723
- Longitude span
- -2.314428 – -2.313748
- Bounding box centre
- 53.437509, -2.314088
- Location descriptions
-
- M60 J7 anti-clockwise access
- Feed validity status
- Planned
- Overall feed start
- Fri, Aug 21, 2026 7:00 PM
- Overall feed end
- Sat, Aug 22, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M60 J7 anti-clockwise access
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {C0D717A7-9AAF-46DD-B754-8EF2036191DB}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 6 m
- To Distance
- 41 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.437723 -2.314428 53.437687 -2.314316 53.437511 -2.314055
Segment 2
2 coordinate pairs- Description
- M60 J7 anti-clockwise access
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {44DA3920-D7AF-436E-9A0D-50A91D4F3474}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 31 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.437511 -2.314055 53.437295 -2.313748
- Geometry type
- MultiLineString
- Geometry points
- 5
- First coordinate pair
- -2.314428, 53.437723
- Road section segments
- 1
- Road section points
- 5
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.314428,
53.437723
],
[
-2.314316,
53.437687
],
[
-2.314055,
53.437511
],
[
-2.314055,
53.437511
],
[
-2.313748,
53.437295
]
]
]
}
View road section coordinates
[
[
[
-2.314428,
53.437723
],
[
-2.314316,
53.437687
],
[
-2.314055,
53.437511
],
[
-2.314055,
53.437511
],
[
-2.313748,
53.437295
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 4
- Record created
- Fri, Aug 21, 2026 4:34 AM
- Record versioned
- Fri, Aug 21, 2026 3:49 PM
- Coordinate source
- Geometry
Driving on the M60? See every live closure, roadwork and planned restriction on this road.
M60 live closuresRelated incidents
M60 Anticlockwise Jct 25 entry slip road hardshoulder closure
Active Roadworks National HighwaysExpected to clear in 3 months 1 week
M60 Anticlockwise Jct 25 entry slip road hardshoulder closure
M60 anticlockwise jct 7 exit slip road closure
Planned Roadworks National HighwaysStarts in 2 hours 35 seconds
M60 anticlockwise jct 7 exit slip road closure
M60 Clockwise lanes 1 and 2 closure (45/5 to 47/6)
Planned Roadworks National HighwaysStarts in 2 hours 35 seconds
M60 Clockwise lanes 1 and 2 closure (45/5 to 47/6)
M60 Anticlockwise lane 1 closure (MP 1/5 to 54/7)
Planned Roadworks National HighwaysStarts in 2 hours 35 seconds
M60 Anticlockwise lane 1 closure (MP 1/5 to 54/7)
M60 Anticlockwise Jct 27 exit slip road closure
Planned Roadworks National HighwaysStarts in 2 hours 35 seconds
M60 Anticlockwise Jct 27 exit slip road closure
M60 anticlockwise lane 1 closure (MP 5/8 to 4/3)
Planned Roadworks National HighwaysStarts in 2 hours 35 seconds
M60 anticlockwise lane 1 closure (MP 5/8 to 4/3)