M60 Anticlockwise Jct 7 entry slip road closure

Cleared

M60 Anticlockwise Jct 7 entry slip road closure

Start time
Mon, Apr 27, 2026 11:50 PM
Expected end
Tue, Apr 28, 2026 5:00 AM
Duration
5 hours 10 minutes
Road
M60 – M60 J7 Anti-Clockwise Access
Category
Road Maintenance
Direction
Anticlockwise
Reason
Tree And Vegetation Cutting Work
Active
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Tue, Apr 28, 2026 3:02 AM
Last updated
Tue, Apr 28, 2026 3:16 AM
Cleared
Tue, Apr 28, 2026 5:00 AM
  • Latest update: M60 Anticlockwise Jct 7 entry slip road closure
Coordinates
53.437545, -2.314120
Latitude span
53.437295 – 53.437723
Longitude span
-2.314428 – -2.313748
Bounding box centre
53.437509, -2.314088
Location descriptions
  • M60 J7 anti-clockwise access
Feed validity status
Active
Overall feed start
Mon, Apr 27, 2026 11:50 PM
Overall feed end
Tue, Apr 28, 2026 5:00 AM
Feed window length
5 hours 10 minutes
Probability code (raw)
certain
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
carriagewayClosures (Carriageway Closures)
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

3 coordinate pairs
Description
M60 J7 anti-clockwise access
Lanes Restricted
2 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
Anticlockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M60
Linear Element Model
The Network Model
Linear Element Id
{C0D717A7-9AAF-46DD-B754-8EF2036191DB}
Linear Element Type
B Carriageway Entry Slip
From Distance
6 m
To Distance
41 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.437723 -2.314428
53.437687 -2.314316
53.437511 -2.314055

Segment 2

2 coordinate pairs
Description
M60 J7 anti-clockwise access
Lanes Restricted
2 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
Anticlockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M60
Linear Element Model
The Network Model
Linear Element Id
{44DA3920-D7AF-436E-9A0D-50A91D4F3474}
Linear Element Type
B Carriageway Entry Slip
From Distance
0 m
To Distance
31 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.437511 -2.314055
53.437295 -2.313748
Geometry type
MultiLineString
Geometry points
5
First coordinate pair
-2.314428, 53.437723
Road section segments
1
Road section points
5
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -2.314428,
                53.437723
            ],
            [
                -2.314316,
                53.437687
            ],
            [
                -2.314055,
                53.437511
            ],
            [
                -2.314055,
                53.437511
            ],
            [
                -2.313748,
                53.437295
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -2.314428,
            53.437723
        ],
        [
            -2.314316,
            53.437687
        ],
        [
            -2.314055,
            53.437511
        ],
        [
            -2.314055,
            53.437511
        ],
        [
            -2.313748,
            53.437295
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Tree And Vegetation Cutting Work
Compliance
Mandatory
Probability
Certain
Validity status
Active
Road management
Carriageway Closures
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Tue, Apr 28, 2026 3:02 AM
Record versioned
Tue, Apr 28, 2026 3:16 AM
Coordinate source
Geometry

Related incidents

M60 anticlockwise lanes 2 and 3 closure (MP 1/3 to 52/3)

Planned National Highways
Stockport M60 · M60 Anti-Clockwise Between J2 And J1
Starts 7 Jun 2026, 20:00 Expected 8 Jun 2026, 05:00

M60 anticlockwise lanes 2 and 3 closure (MP 1/3 to 52/3)

Category: Road Maintenance
View update

M60 Clockwise Jct 22 exit slip road Lane closure

Planned National Highways
Tameside M60 · M60 J22 Clockwise Exit
Starts 7 Jun 2026, 20:00 Expected 8 Jun 2026, 04:00

M60 Clockwise Jct 22 exit slip road Lane closure

Category: Road Maintenance
View update

Mobile hardshoulder closure Clockwise and Anticlockwise

Active National Highways
Stockport M60 · M60 Anti-Clockwise Between J1 And J27
Starts 7 Apr 2026, 08:00 Expected 1 Apr 2027, 22:59

Mobile hardshoulder closure Clockwise and Anticlockwise

Category: Road Maintenance
View update

M60 Clockwise Jct 22 exit slip road Lane closure

Planned National Highways
Tameside M60 · M60 J22 Clockwise Exit
Starts 7 Jun 2026, 20:00 Expected 8 Jun 2026, 04:00

M60 Clockwise Jct 22 exit slip road Lane closure

Category: Road Maintenance
View update

M60 anticlockwise lanes 2 and 3 closure (MP 1/3 to 52/3)

Planned National Highways
Stockport M60 · M60 Anti-Clockwise Between J2 And J1
Starts 7 Jun 2026, 20:00 Expected 8 Jun 2026, 05:00

M60 anticlockwise lanes 2 and 3 closure (MP 1/3 to 52/3)

Category: Road Maintenance
View update

M60 anticlockwise lanes 2 and 3 closure (MP 1/3 to 52/3)

Planned National Highways
Stockport M60 · M60 Anti-Clockwise Between J2 And J1
Starts 7 Jun 2026, 20:00 Expected 8 Jun 2026, 05:00

M60 anticlockwise lanes 2 and 3 closure (MP 1/3 to 52/3)

Category: Road Maintenance
View update