M60 Anticlockwise Jct 7 entry slip road closure
PlannedM60 Anticlockwise Jct 7 entry slip road closure
- Start time
- Mon, Jan 19, 2026 9:00 PM
- Expected end
- Tue, Jan 20, 2026 6:00 AM
- Duration
- 9 hours
- Road
- M60 – M60 J7 Anti-Clockwise Access
- Category
- Road Maintenance
- Direction
- Anticlockwise
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Jul 1, 2025 10:55 AM
- Last updated
- Mon, Jan 19, 2026 4:16 PM
- Cleared
- Tue, Jan 20, 2026 6:00 AM
- Latest update: M60 Anticlockwise Jct 7 entry slip road closure
- Coordinates
- 53.437545, -2.314120
- Latitude span
- 53.437295 – 53.437723
- Longitude span
- -2.314428 – -2.313748
- Bounding box centre
- 53.437509, -2.314088
- Location descriptions
-
- M60 J7 anti-clockwise access
- Feed validity status
- Planned
- Overall feed start
- Mon, Jan 19, 2026 9:00 PM
- Overall feed end
- Tue, Jan 20, 2026 6:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M60 J7 anti-clockwise access
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {44DA3920-D7AF-436E-9A0D-50A91D4F3474}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 31 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.437511 -2.314055 53.437295 -2.313748
Segment 2
3 coordinate pairs- Description
- M60 J7 anti-clockwise access
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {C0D717A7-9AAF-46DD-B754-8EF2036191DB}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 6 m
- To Distance
- 41 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.437723 -2.314428 53.437687 -2.314316 53.437511 -2.314055
- Geometry type
- MultiLineString
- Geometry points
- 5
- First coordinate pair
- -2.314055, 53.437511
- Road section segments
- 1
- Road section points
- 5
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.314055,
53.437511
],
[
-2.313748,
53.437295
],
[
-2.314428,
53.437723
],
[
-2.314316,
53.437687
],
[
-2.314055,
53.437511
]
]
]
}
View road section coordinates
[
[
[
-2.314055,
53.437511
],
[
-2.313748,
53.437295
],
[
-2.314428,
53.437723
],
[
-2.314316,
53.437687
],
[
-2.314055,
53.437511
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Jul 1, 2025 10:55 AM
- Record versioned
- Mon, Jan 19, 2026 4:16 PM
- Coordinate source
- Geometry
Related incidents
M60 Clockwise Lanes 1 and 2 closure (MP 45/5 to 47/6)
Planned National HighwaysM60 Clockwise Lanes 1 and 2 closure (MP 45/5 to 47/6)
Mobile hardshoulder closure Clockwise and Anticlockwise
Active National HighwaysMobile hardshoulder closure Clockwise and Anticlockwise
M60 clockwise jct 19 entry slip road closure
Planned National HighwaysM60 clockwise jct 19 entry slip road closure
M56 Eastbound Lane 1 closure (MP 11/6 to Sharston Carriageway Closure )
Planned National HighwaysM56 Eastbound Lane 1 closure (MP 11/6 to Sharston Carriageway Closure )
M60 Clockwise Jct 27 entry slip road closure
Planned National HighwaysM60 Clockwise Jct 27 entry slip road closure
M60 anticlockwise lanes 2 and 3 closure (MP 1/3 to 52/3)
Cleared National HighwaysM60 anticlockwise lanes 2 and 3 closure (MP 1/3 to 52/3)