M60 Anticlockwise Jct 23 exit slip road closure
ClearedM60 Anticlockwise Jct 23 exit slip road closure
- Start time
- Tue, Nov 17, 2026 11:59 PM
- Expected end
- Wed, Nov 18, 2026 6:00 AM
- Duration
- 6 hours 1 minute
- Road
- M60 – M60 J23 Anti-Clockwise Exit For A6140
- Category
- Road Maintenance
- Direction
- Anticlockwise
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Nov 2, 2026 10:43 AM
- Last updated
- Wed, Nov 18, 2026 5:46 AM
- Cleared
- Wed, Nov 18, 2026 6:00 AM
- Latest update: M60 Anticlockwise Jct 23 exit slip road closure
- Coordinates
- 53.477555, -2.122273
- Latitude span
- 53.476259 – 53.478211
- Longitude span
- -2.124551 – -2.121035
- Bounding box centre
- 53.477235, -2.122793
- Location descriptions
-
- M60 J23 anti-clockwise exit for A6140
- Feed validity status
- Planned
- Overall feed start
- Tue, Nov 17, 2026 11:59 PM
- Overall feed end
- Wed, Nov 18, 2026 6:00 AM
- Feed window length
- 6 hours 1 minute
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M60 J23 anti-clockwise exit for A6140
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {CEECA12A-EB35-4B6E-949A-964F378F7B0F}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 16 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.478171 -2.121268 53.478167 -2.121208 53.478211 -2.121035
Segment 2
7 coordinate pairs- Description
- M60 J23 anti-clockwise exit for A6140
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {1CE9A6AC-C1AE-4548-A310-11DF1AF90ACB}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 130 m
- To Distance
- 434 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.476259 -2.124551 53.476853 -2.123495 53.477099 -2.123058 53.47715 -2.122968 53.477699 -2.122005 53.477771 -2.12187 53.478171 -2.121268
- Geometry type
- MultiLineString
- Geometry points
- 10
- First coordinate pair
- -2.121268, 53.478171
- Road section segments
- 1
- Road section points
- 10
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.121268,
53.478171
],
[
-2.121208,
53.478167
],
[
-2.121035,
53.478211
],
[
-2.124551,
53.476259
],
[
-2.123495,
53.476853
],
[
-2.123058,
53.477099
],
[
-2.122968,
53.47715
],
[
-2.122005,
53.477699
],
[
-2.12187,
53.477771
],
[
-2.121268,
53.478171
]
]
]
}
View road section coordinates
[
[
[
-2.121268,
53.478171
],
[
-2.121208,
53.478167
],
[
-2.121035,
53.478211
],
[
-2.124551,
53.476259
],
[
-2.123495,
53.476853
],
[
-2.123058,
53.477099
],
[
-2.122968,
53.47715
],
[
-2.122005,
53.477699
],
[
-2.12187,
53.477771
],
[
-2.121268,
53.478171
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Nov 2, 2026 10:43 AM
- Record versioned
- Wed, Nov 18, 2026 5:46 AM
- Coordinate source
- Geometry
Driving on the M60? See every live closure, roadwork and planned restriction on this road.
M60 live closuresRelated incidents
M60 Anticlockwise Jct 25 entry slip road hardshoulder closure
Active Roadworks National HighwaysExpected to clear in 6 days 4 hours
M60 Anticlockwise Jct 25 entry slip road hardshoulder closure
Mobile hardshoulder closure Clockwise and Anticlockwise
Active Roadworks National HighwaysExpected to clear in 4 months 3 days
Mobile hardshoulder closure Clockwise and Anticlockwise
M60 Anticlockwise lane 1 closure (MP 8/8 to 7/2)
Cleared Roadworks National HighwaysCleared 3 hours 33 minutes ago
M60 Anticlockwise lane 1 closure (MP 8/8 to 7/2)
M60 Clockwise hardshoulder closure (MP 45/3 to 45/7)
Cleared Roadworks National HighwaysCleared 18 hours 33 minutes ago
M60 Clockwise hardshoulder closure (MP 45/3 to 45/7)
M60 Anticlockwise Lanes 1 and 2 closure (MP 1/3 to 50/5)
Cleared Roadworks National HighwaysCleared 23 hours 48 minutes ago
M60 Anticlockwise Lanes 1 and 2 closure (MP 1/3 to 50/5)
M60 Anticlockwise lanes 2 and 3 closure (MP 50/6 to 46/5)
Cleared Roadworks National HighwaysCleared 1 day 21 hours ago
M60 Anticlockwise lanes 2 and 3 closure (MP 50/6 to 46/5)