M60 Anticlockwise Jct 23 exit slip road closure

Cleared

M60 Anticlockwise Jct 23 exit slip road closure

Start time
Wed, Oct 14, 2026 10:45 PM
Expected end
Thu, Oct 15, 2026 5:00 AM
Duration
6 hours 5 minutes 2 seconds
Road
M60 – M60 J23 Anti-Clockwise Exit For A6140
Category
Road Maintenance
Direction
Anticlockwise
Reason
Tree And Vegetation Cutting Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Thu, Oct 15, 2026 4:03 AM
Last updated
Thu, Oct 15, 2026 4:31 AM
Cleared
Thu, Oct 15, 2026 4:50 AM
  • Latest update: M60 Anticlockwise Jct 23 exit slip road closure
Coordinates
53.477555, -2.122273
Latitude span
53.476259 – 53.478211
Longitude span
-2.124551 – -2.121035
Bounding box centre
53.477235, -2.122793
Location descriptions
  • M60 J23 anti-clockwise exit for A6140
Feed validity status
Planned
Overall feed start
Wed, Oct 14, 2026 10:45 PM
Overall feed end
Thu, Oct 15, 2026 5:00 AM
Feed window length
6 hours 15 minutes
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
carriagewayClosures (Carriageway Closures)
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

3 coordinate pairs
Description
M60 J23 anti-clockwise exit for A6140
Lanes Restricted
3 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
Anticlockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M60
Linear Element Model
The Network Model
Linear Element Id
{CEECA12A-EB35-4B6E-949A-964F378F7B0F}
Linear Element Type
B Carriageway Exit Slip
From Distance
0 m
To Distance
16 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.478171 -2.121268
53.478167 -2.121208
53.478211 -2.121035

Segment 2

7 coordinate pairs
Description
M60 J23 anti-clockwise exit for A6140
Lanes Restricted
3 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
Anticlockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M60
Linear Element Model
The Network Model
Linear Element Id
{1CE9A6AC-C1AE-4548-A310-11DF1AF90ACB}
Linear Element Type
B Carriageway Exit Slip
From Distance
130 m
To Distance
434 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.476259 -2.124551
53.476853 -2.123495
53.477099 -2.123058
53.47715 -2.122968
53.477699 -2.122005
53.477771 -2.12187
53.478171 -2.121268
Geometry type
MultiLineString
Geometry points
10
First coordinate pair
-2.121268, 53.478171
Road section segments
1
Road section points
10
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -2.121268,
                53.478171
            ],
            [
                -2.121208,
                53.478167
            ],
            [
                -2.121035,
                53.478211
            ],
            [
                -2.124551,
                53.476259
            ],
            [
                -2.123495,
                53.476853
            ],
            [
                -2.123058,
                53.477099
            ],
            [
                -2.122968,
                53.47715
            ],
            [
                -2.122005,
                53.477699
            ],
            [
                -2.12187,
                53.477771
            ],
            [
                -2.121268,
                53.478171
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -2.121268,
            53.478171
        ],
        [
            -2.121208,
            53.478167
        ],
        [
            -2.121035,
            53.478211
        ],
        [
            -2.124551,
            53.476259
        ],
        [
            -2.123495,
            53.476853
        ],
        [
            -2.123058,
            53.477099
        ],
        [
            -2.122968,
            53.47715
        ],
        [
            -2.122005,
            53.477699
        ],
        [
            -2.12187,
            53.477771
        ],
        [
            -2.121268,
            53.478171
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Tree And Vegetation Cutting Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Carriageway Closures
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Thu, Oct 15, 2026 4:03 AM
Record versioned
Thu, Oct 15, 2026 4:31 AM
Coordinate source
Geometry

Driving on the M60? See every live closure, roadwork and planned restriction on this road.

M60 live closures

Related incidents

M60 Anticlockwise Jct 25 entry slip road hardshoulder closure

Active Roadworks National Highways
Stockport M60 · M60 J25 Anti-Clockwise Access

Expected to clear in 1 month 2 weeks

Started 24 Jun 2026, 04:00 Expected clear 5 Dec 2026, 05:00

M60 Anticlockwise Jct 25 entry slip road hardshoulder closure

Category: Construction Work
View update

M60 Clockwise Jct 19 entry slip road closure

Planned Roadworks National Highways
Manchester M60 · M60 J19 Clockwise Access

Starts in 14 hours 5 minutes

Starts 15 Oct 2026, 20:00 Expected clear 16 Oct 2026, 05:00

M60 Clockwise Jct 19 entry slip road closure

Category: Road Maintenance
View update

M6 Northbound Lanes 2 and 3 closure with hardshoulder running at 20/9 (MP 19/7 to 25/0)

Planned Roadworks National Highways
Bolton M60 · M60 Clockwise Between J12 And J13

Starts in 13 hours 5 minutes

Starts 15 Oct 2026, 19:00 Expected clear 16 Oct 2026, 04:00

M6 Northbound Lanes 2 and 3 closure with hardshoulder running at 20/9 (MP 19/7 to 25/0)

Category: Road Maintenance
View update

A663 Eastbound Broadgate carriageway closure

Planned Roadworks National Highways
Tameside A663 · M60 J21 Clockwise Exit

Starts in 13 hours 5 minutes

Starts 15 Oct 2026, 19:00 Expected clear 16 Oct 2026, 05:00

A663 Eastbound Broadgate carriageway closure

Category: Road Maintenance
View update

A663 Northbound Stott Lane to Broadgate lane 1 closure

Planned Roadworks National Highways
Tameside A663 · A663 Northbound Within The M60 Junction

Starts in 13 hours 5 minutes

Starts 15 Oct 2026, 19:00 Expected clear 16 Oct 2026, 05:00

A663 Northbound Stott Lane to Broadgate lane 1 closure

Category: Road Maintenance
View update

M60 Clockwise hardshoulder closure (MP 51/0 to 51/7)

Planned Roadworks National Highways
Tameside M60 · M60 Clockwise Between J24 And J25

Starts in 2 hours 5 minutes

Starts 15 Oct 2026, 08:00 Expected clear 15 Oct 2026, 16:00

M60 Clockwise hardshoulder closure (MP 51/0 to 51/7)

Category: Road Maintenance
View update