M60 anticlockwise jct 23 exit slip road closure

Cleared

M60 anticlockwise jct 23 exit slip road closure

Start time
Thu, Jul 2, 2026 9:00 PM
Expected end
Fri, Jul 3, 2026 5:00 AM
Duration
2 hours 35 minutes 1 second
Road
M60 – M60 J23 Anti-Clockwise Exit For A6140
Category
Road Maintenance
Direction
Anticlockwise
Reason
Roadworks
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Fri, May 22, 2026 7:25 AM
Last updated
Thu, Jul 2, 2026 11:10 PM
Cleared
Thu, Jul 2, 2026 11:35 PM
  • Latest update: M60 anticlockwise jct 23 exit slip road closure
Coordinates
53.477555, -2.122273
Latitude span
53.476259 – 53.478211
Longitude span
-2.124551 – -2.121035
Bounding box centre
53.477235, -2.122793
Location descriptions
  • M60 J23 anti-clockwise exit for A6140
Feed validity status
Planned
Overall feed start
Thu, Jul 2, 2026 9:00 PM
Overall feed end
Fri, Jul 3, 2026 5:00 AM
Feed window length
8 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
carriagewayClosures (Carriageway Closures)
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

3 coordinate pairs
Description
M60 J23 anti-clockwise exit for A6140
Lanes Restricted
3 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
Anticlockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M60
Linear Element Model
The Network Model
Linear Element Id
{CEECA12A-EB35-4B6E-949A-964F378F7B0F}
Linear Element Type
B Carriageway Exit Slip
From Distance
0 m
To Distance
16 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.478171 -2.121268
53.478167 -2.121208
53.478211 -2.121035

Segment 2

7 coordinate pairs
Description
M60 J23 anti-clockwise exit for A6140
Lanes Restricted
3 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
Anticlockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M60
Linear Element Model
The Network Model
Linear Element Id
{1CE9A6AC-C1AE-4548-A310-11DF1AF90ACB}
Linear Element Type
B Carriageway Exit Slip
From Distance
130 m
To Distance
434 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.476259 -2.124551
53.476853 -2.123495
53.477099 -2.123058
53.47715 -2.122968
53.477699 -2.122005
53.477771 -2.12187
53.478171 -2.121268
Geometry type
MultiLineString
Geometry points
10
First coordinate pair
-2.121268, 53.478171
Road section segments
1
Road section points
10
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -2.121268,
                53.478171
            ],
            [
                -2.121208,
                53.478167
            ],
            [
                -2.121035,
                53.478211
            ],
            [
                -2.124551,
                53.476259
            ],
            [
                -2.123495,
                53.476853
            ],
            [
                -2.123058,
                53.477099
            ],
            [
                -2.122968,
                53.47715
            ],
            [
                -2.122005,
                53.477699
            ],
            [
                -2.12187,
                53.477771
            ],
            [
                -2.121268,
                53.478171
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -2.121268,
            53.478171
        ],
        [
            -2.121208,
            53.478167
        ],
        [
            -2.121035,
            53.478211
        ],
        [
            -2.124551,
            53.476259
        ],
        [
            -2.123495,
            53.476853
        ],
        [
            -2.123058,
            53.477099
        ],
        [
            -2.122968,
            53.47715
        ],
        [
            -2.122005,
            53.477699
        ],
        [
            -2.12187,
            53.477771
        ],
        [
            -2.121268,
            53.478171
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Roadworks
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Carriageway Closures
Feed provider
National Highways
Data source
Roadworks
Feed version
18
Record created
Fri, May 22, 2026 7:25 AM
Record versioned
Thu, Jul 2, 2026 11:10 PM
Coordinate source
Geometry

Driving on the M60? See every live closure, roadwork and planned restriction on this road.

M60 live closures

Related incidents

M67 Eastbound Lane 1 closure (MP 1/4 to 2/4)

Active Roadworks National Highways
Tameside M67 · M67 Eastbound Between J1 And J1A

Expected to clear in 1 month 2 weeks

Started 19 Jun 2026, 04:00 Expected clear 25 Aug 2026, 20:00

M67 Eastbound Lane 1 closure (MP 1/4 to 2/4)

Category: Construction Work
View update

M67 Eastbound Lane 3/narrow lanes closure 1/4 to 2/4

Planned Roadworks National Highways
Tameside M67 · M67 Eastbound Between J1 And J1A

Expected to clear in 1 month 2 weeks

Started 19 Jun 2026, 04:00 Expected clear 25 Aug 2026, 20:00

M67 Eastbound Lane 3/narrow lanes closure 1/4 to 2/4

Category: Construction Work
View update

M60 Clockwise lanes 3 and 4 closure (MP 43/5 to 45/6)

Planned Roadworks National Highways
Tameside M60 · M60 Clockwise Between J22 And J23

Starts in 6 hours 55 minutes

Starts 7 Jul 2026, 20:00 Expected clear 8 Jul 2026, 05:00

M60 Clockwise lanes 3 and 4 closure (MP 43/5 to 45/6)

Category: Road Maintenance
View update

M67 eastbound jct 3 entry slip road closure

Planned Roadworks National Highways
Tameside M67 · M67 J3 Eastbound Access

Starts in 5 hours 55 minutes

Starts 7 Jul 2026, 19:00 Expected clear 8 Jul 2026, 05:00

M67 eastbound jct 3 entry slip road closure

Category: Construction Work
View update

M67 eastbound jct 3 to 4 carriageway closure

Planned Roadworks National Highways
Tameside M67 · M67 Eastbound Within J3

Starts in 5 hours 55 minutes

Starts 7 Jul 2026, 19:00 Expected clear 8 Jul 2026, 05:00

M67 eastbound jct 3 to 4 carriageway closure

Category: Construction Work
View update

M60 Anticlockwise Jct 27 exit slip road closure

Cleared Roadworks National Highways
Stockport M60 · M60 J27 Anti-Clockwise Exit

Cleared 10 hours 29 minutes ago

Started 6 Jul 2026, 20:00 Ended 7 Jul 2026, 02:35

M60 Anticlockwise Jct 27 exit slip road closure

Category: Road Maintenance
View update