M60 Anticlockwise Jct 23 exit slip road closure

Planned

M60 Anticlockwise Jct 23 exit slip road closure

Start time
Tue, Jun 9, 2026 8:00 PM
Expected end
Wed, Jun 10, 2026 5:00 AM
Duration
9 hours
Road
M60 – M60 J23 Anti-Clockwise Exit For A6140
Category
Road Maintenance
Direction
Anticlockwise
Reason
Roadworks
Active
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Fri, May 22, 2026 7:25 AM
Last updated
Tue, Jun 9, 2026 5:16 AM
Cleared
Wed, Jun 10, 2026 5:00 AM
  • Latest update: M60 Anticlockwise Jct 23 exit slip road closure
Coordinates
53.477555, -2.122273
Latitude span
53.476259 – 53.478211
Longitude span
-2.124551 – -2.121035
Bounding box centre
53.477235, -2.122793
Location descriptions
  • M60 J23 anti-clockwise exit for A6140
Feed validity status
Planned
Overall feed start
Tue, Jun 9, 2026 8:00 PM
Overall feed end
Wed, Jun 10, 2026 5:00 AM
Feed window length
9 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
carriagewayClosures (Carriageway Closures)
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

7 coordinate pairs
Description
M60 J23 anti-clockwise exit for A6140
Lanes Restricted
3 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
Anticlockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M60
Linear Element Model
The Network Model
Linear Element Id
{1CE9A6AC-C1AE-4548-A310-11DF1AF90ACB}
Linear Element Type
B Carriageway Exit Slip
From Distance
130 m
To Distance
434 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.476259 -2.124551
53.476853 -2.123495
53.477099 -2.123058
53.47715 -2.122968
53.477699 -2.122005
53.477771 -2.12187
53.478171 -2.121268

Segment 2

3 coordinate pairs
Description
M60 J23 anti-clockwise exit for A6140
Lanes Restricted
3 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
Anticlockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M60
Linear Element Model
The Network Model
Linear Element Id
{CEECA12A-EB35-4B6E-949A-964F378F7B0F}
Linear Element Type
B Carriageway Exit Slip
From Distance
0 m
To Distance
16 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
53.478171 -2.121268
53.478167 -2.121208
53.478211 -2.121035
Geometry type
MultiLineString
Geometry points
10
First coordinate pair
-2.124551, 53.476259
Road section segments
1
Road section points
10
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -2.124551,
                53.476259
            ],
            [
                -2.123495,
                53.476853
            ],
            [
                -2.123058,
                53.477099
            ],
            [
                -2.122968,
                53.47715
            ],
            [
                -2.122005,
                53.477699
            ],
            [
                -2.12187,
                53.477771
            ],
            [
                -2.121268,
                53.478171
            ],
            [
                -2.121268,
                53.478171
            ],
            [
                -2.121208,
                53.478167
            ],
            [
                -2.121035,
                53.478211
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -2.124551,
            53.476259
        ],
        [
            -2.123495,
            53.476853
        ],
        [
            -2.123058,
            53.477099
        ],
        [
            -2.122968,
            53.47715
        ],
        [
            -2.122005,
            53.477699
        ],
        [
            -2.12187,
            53.477771
        ],
        [
            -2.121268,
            53.478171
        ],
        [
            -2.121268,
            53.478171
        ],
        [
            -2.121208,
            53.478167
        ],
        [
            -2.121035,
            53.478211
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Roadworks
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Carriageway Closures
Feed provider
National Highways
Data source
Roadworks
Feed version
18
Record created
Fri, May 22, 2026 7:25 AM
Record versioned
Tue, Jun 9, 2026 5:16 AM
Coordinate source
Geometry

Related incidents

M60 Clockwise Lanes 1 and 2 closure (MP 45/5 to 47/6)

Planned National Highways
Tameside M60 · M60 Clockwise Within J23
Starts 9 Jun 2026, 19:00 Expected 10 Jun 2026, 05:00

M60 Clockwise Lanes 1 and 2 closure (MP 45/5 to 47/6)

Category: Road Maintenance
View update

Mobile hardshoulder closure Clockwise and Anticlockwise

Active National Highways
Stockport M60 · M60 Anti-Clockwise Between J1 And J27
Starts 7 Apr 2026, 08:00 Expected 1 Apr 2027, 22:59

Mobile hardshoulder closure Clockwise and Anticlockwise

Category: Road Maintenance
View update

M67 Eastbound Lane 3 closures /narrow lanes closure 1/4 to 2/4

Active National Highways
Tameside M67 · M67 Eastbound Between J1 And J1A
Starts 19 Mar 2026, 05:00 Expected 29 Jun 2026, 20:00

M67 Eastbound Lane 3 closures /narrow lanes closure 1/4 to 2/4

Category: Construction Work
View update

M67 Eastbound narrow lanes/Lane 3 closure (MP 1/4 to 2/4)

Active National Highways
Tameside M67 · M67 Eastbound Between J1 And J1A
Starts 17 Mar 2026, 05:00 Expected 13 Jun 2026, 20:00

M67 Eastbound narrow lanes/Lane 3 closure (MP 1/4 to 2/4)

Category: Construction Work
View update

M60 Clockwise lane 1 closure (MP 50/4 to 51/5)

Planned National Highways
Tameside M60 · M60 Clockwise Between J24 And J25
Starts 9 Jun 2026, 21:00 Expected 10 Jun 2026, 05:00

M60 Clockwise lane 1 closure (MP 50/4 to 51/5)

Category: Road Maintenance
View update

M60 Clockwise lane 1 closure (MP 50/4 to 51/5)

Planned National Highways
Tameside M60 · M60 Clockwise Between J24 And J25
Starts 9 Jun 2026, 21:00 Expected 10 Jun 2026, 05:00

M60 Clockwise lane 1 closure (MP 50/4 to 51/5)

Category: Road Maintenance
View update