M60 anticlockwise Jct 13 exit slip road Lane 2 closure
ClearedM60 anticlockwise Jct 13 exit slip road Lane 2 closure
- Start time
- Sun, Oct 19, 2025 8:12 PM
- Expected end
- Mon, Oct 20, 2025 4:00 AM
- Duration
- 7 hours 48 minutes
- Road
- M60 – M60 Anti-Clockwise Between J14 And J13
- Category
- Construction Work
- Direction
- Anticlockwise
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 3 lanes affected, 1 of 2 lanes affected
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Sun, Oct 19, 2025 8:12 PM
- Last updated
- Sun, Oct 19, 2025 11:45 PM
- Cleared
- Mon, Oct 20, 2025 4:00 AM
- Latest update: M60 anticlockwise Jct 13 exit slip road Lane 2 closure
- Coordinates
- 53.502920, -2.380722
- Latitude span
- 53.500627 – 53.506034
- Longitude span
- -2.382741 – -2.377057
- Bounding box centre
- 53.503331, -2.379899
- Location descriptions
-
- M60 anti-clockwise between J14 and J13
- M60 J13 anti-clockwise exit
- Feed validity status
- Active
- Overall feed start
- Sun, Oct 19, 2025 8:12 PM
- Overall feed end
- Mon, Oct 20, 2025 4:00 AM
- Feed window length
- 7 hours 48 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M60 anti-clockwise between J14 and J13
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {16E908D5-C83F-4F4F-BB1A-C6166C8ECAB9}
- Linear Element Type
- B Carriageway
- From Distance
- 332 m
- To Distance
- 423 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.506034 -2.377057 53.505621 -2.377657 53.505423 -2.377957
Segment 2
7 coordinate pairs- Description
- M60 J13 anti-clockwise exit
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {3A9BF5C8-0AAA-4809-8D42-BE6E8D836D50}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 275 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.505423 -2.377957 53.505107 -2.378316 53.505044 -2.378391 53.504593 -2.37896 53.504558 -2.379002 53.504553 -2.379008 53.503427 -2.380402
Segment 3
16 coordinate pairs- Description
- M60 J13 anti-clockwise exit
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {BC221CC0-2563-4DD8-AE1B-4E170FFADDBB}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 355 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.503427 -2.380402 53.503274 -2.380585 53.5024 -2.381564 53.502256 -2.381728 53.502094 -2.381892 53.501931 -2.382042 53.501769 -2.382191 53.501598 -2.382325 53.501382 -2.382474 53.501165 -2.382608 53.500994 -2.382712 53.500904 -2.382741 53.500815 -2.38274 53.500779 -2.38274 53.500716 -2.382694 53.500627 -2.382613
- Geometry type
- MultiLineString
- Geometry points
- 26
- First coordinate pair
- -2.377057, 53.506034
- Road section segments
- 1
- Road section points
- 26
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.377057,
53.506034
],
[
-2.377657,
53.505621
],
[
-2.377957,
53.505423
],
[
-2.377957,
53.505423
],
[
-2.378316,
53.505107
],
[
-2.378391,
53.505044
],
[
-2.37896,
53.504593
],
[
-2.379002,
53.504558
],
[
-2.379008,
53.504553
],
[
-2.380402,
53.503427
],
[
-2.380402,
53.503427
],
[
-2.380585,
53.503274
],
[
-2.381564,
53.5024
],
[
-2.381728,
53.502256
],
[
-2.381892,
53.502094
],
[
-2.382042,
53.501931
],
[
-2.382191,
53.501769
],
[
-2.382325,
53.501598
],
[
-2.382474,
53.501382
],
[
-2.382608,
53.501165
],
[
-2.382712,
53.500994
],
[
-2.382741,
53.500904
],
[
-2.38274,
53.500815
],
[
-2.38274,
53.500779
],
[
-2.382694,
53.500716
],
[
-2.382613,
53.500627
]
]
]
}
View road section coordinates
[
[
[
-2.377057,
53.506034
],
[
-2.377657,
53.505621
],
[
-2.377957,
53.505423
],
[
-2.377957,
53.505423
],
[
-2.378316,
53.505107
],
[
-2.378391,
53.505044
],
[
-2.37896,
53.504593
],
[
-2.379002,
53.504558
],
[
-2.379008,
53.504553
],
[
-2.380402,
53.503427
],
[
-2.380402,
53.503427
],
[
-2.380585,
53.503274
],
[
-2.381564,
53.5024
],
[
-2.381728,
53.502256
],
[
-2.381892,
53.502094
],
[
-2.382042,
53.501931
],
[
-2.382191,
53.501769
],
[
-2.382325,
53.501598
],
[
-2.382474,
53.501382
],
[
-2.382608,
53.501165
],
[
-2.382712,
53.500994
],
[
-2.382741,
53.500904
],
[
-2.38274,
53.500815
],
[
-2.38274,
53.500779
],
[
-2.382694,
53.500716
],
[
-2.382613,
53.500627
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Sun, Oct 19, 2025 8:12 PM
- Record versioned
- Sun, Oct 19, 2025 11:45 PM
- Coordinate source
- Geometry
Related incidents
M60 clockwise jct 19 entry slip road closure
Planned National HighwaysM60 clockwise jct 19 entry slip road closure
M60 Clockwise Lanes 1 and 2 closure (MP 45/5 to 47/6)
Planned National HighwaysM60 Clockwise Lanes 1 and 2 closure (MP 45/5 to 47/6)
M60 Clockwise Jct 22 exit slip road Lane closure
Planned National HighwaysM60 Clockwise Jct 22 exit slip road Lane closure
Mobile hardshoulder closure Clockwise and Anticlockwise
Active National HighwaysMobile hardshoulder closure Clockwise and Anticlockwise
Hardshoulder closure Eastbound (MP 1/5 - 1/9)
Active National HighwaysHardshoulder closure Eastbound (MP 1/5 - 1/9)
M60 anticlockwise lanes 2 and 3 closure (MP 1/3 to 52/3)
Cleared National HighwaysM60 anticlockwise lanes 2 and 3 closure (MP 1/3 to 52/3)