M60 Anticlockwise Jct 1 entry slip road lane 1 closure
ClearedM60 Anticlockwise Jct 1 entry slip road lane 1 closure
- Start time
- Wed, Sep 16, 2026 10:00 PM
- Expected end
- Thu, Sep 17, 2026 5:00 AM
- Duration
- 2 hours 25 minutes 2 seconds
- Road
- M60 – M60 J1 Anti-Clockwise Access
- Category
- Construction Work
- Direction
- Anticlockwise
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected, 1 of 3 lanes affected
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Sep 8, 2026 9:09 AM
- Last updated
- Wed, Sep 16, 2026 11:59 PM
- Cleared
- Thu, Sep 17, 2026 12:25 AM
- Latest update: M60 Anticlockwise Jct 1 entry slip road lane 1 closure
- Coordinates
- 53.410089, -2.169563
- Latitude span
- 53.409539 – 53.410748
- Longitude span
- -2.173448 – -2.166554
- Bounding box centre
- 53.410144, -2.170001
- Location descriptions
-
- M60 J1 anti-clockwise access
- M60 anti-clockwise between J1 and J27
- Feed validity status
- Planned
- Overall feed start
- Wed, Sep 16, 2026 10:00 PM
- Overall feed end
- Thu, Sep 17, 2026 5:00 AM
- Feed window length
- 7 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
9 coordinate pairs- Description
- M60 J1 anti-clockwise access
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {382E25BE-5D35-4F14-9524-42DC2980778E}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 10 m
- To Distance
- 253 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.409559 -2.173448 53.409547 -2.173392 53.409539 -2.173317 53.409539 -2.173226 53.409548 -2.173106 53.409676 -2.171437 53.409776 -2.170459 53.409786 -2.170399 53.409876 -2.169858
Segment 2
6 coordinate pairs- Description
- M60 anti-clockwise between J1 and J27
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {C96E6FE8-5724-4A69-BB2E-99D3271B5414}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 93 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.410382 -2.167814 53.410518 -2.167348 53.410635 -2.166943 53.410686 -2.166766 53.410717 -2.166657 53.410748 -2.166554
Segment 3
2 coordinate pairs- Description
- M60 anti-clockwise between J1 and J27
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {A416F73B-A887-492F-8AE0-0433EA57BD47}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 11 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.410346 -2.167979 53.410382 -2.167814
Segment 4
5 coordinate pairs- Description
- M60 anti-clockwise between J1 and J27
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {2D03A00E-FAA3-4D58-B5FC-B1E99328501A}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 135 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.409876 -2.169858 53.410003 -2.169272 53.410129 -2.168776 53.410346 -2.167983 53.410346 -2.167979
- Geometry type
- MultiLineString
- Geometry points
- 22
- First coordinate pair
- -2.173448, 53.409559
- Road section segments
- 1
- Road section points
- 22
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.173448,
53.409559
],
[
-2.173392,
53.409547
],
[
-2.173317,
53.409539
],
[
-2.173226,
53.409539
],
[
-2.173106,
53.409548
],
[
-2.171437,
53.409676
],
[
-2.170459,
53.409776
],
[
-2.170399,
53.409786
],
[
-2.169858,
53.409876
],
[
-2.167814,
53.410382
],
[
-2.167348,
53.410518
],
[
-2.166943,
53.410635
],
[
-2.166766,
53.410686
],
[
-2.166657,
53.410717
],
[
-2.166554,
53.410748
],
[
-2.167979,
53.410346
],
[
-2.167814,
53.410382
],
[
-2.169858,
53.409876
],
[
-2.169272,
53.410003
],
[
-2.168776,
53.410129
],
[
-2.167983,
53.410346
],
[
-2.167979,
53.410346
]
]
]
}
View road section coordinates
[
[
[
-2.173448,
53.409559
],
[
-2.173392,
53.409547
],
[
-2.173317,
53.409539
],
[
-2.173226,
53.409539
],
[
-2.173106,
53.409548
],
[
-2.171437,
53.409676
],
[
-2.170459,
53.409776
],
[
-2.170399,
53.409786
],
[
-2.169858,
53.409876
],
[
-2.167814,
53.410382
],
[
-2.167348,
53.410518
],
[
-2.166943,
53.410635
],
[
-2.166766,
53.410686
],
[
-2.166657,
53.410717
],
[
-2.166554,
53.410748
],
[
-2.167979,
53.410346
],
[
-2.167814,
53.410382
],
[
-2.169858,
53.409876
],
[
-2.169272,
53.410003
],
[
-2.168776,
53.410129
],
[
-2.167983,
53.410346
],
[
-2.167979,
53.410346
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 7
- Record created
- Tue, Sep 8, 2026 9:09 AM
- Record versioned
- Wed, Sep 16, 2026 11:59 PM
- Coordinate source
- Geometry
Driving on the M60? See every live closure, roadwork and planned restriction on this road.
M60 live closuresRelated incidents
M60 Anticlockwise Jct 25 entry slip road hardshoulder closure
Active Roadworks National HighwaysExpected to clear in 1 month 3 weeks
M60 Anticlockwise Jct 25 entry slip road hardshoulder closure
M60 anticlockwise lane 1 closure (MP 5/8 to 4/3)
Planned Roadworks National HighwaysStarts in 2 hours 24 seconds
M60 anticlockwise lane 1 closure (MP 5/8 to 4/3)
M60 Clockwise lanes 1 and 2 closure (MP 38/1 to 40/3)
Planned Roadworks National HighwaysStarts in 2 hours 24 seconds
M60 Clockwise lanes 1 and 2 closure (MP 38/1 to 40/3)
A580 Eastbound to M60 Clockwise link road closure
Planned Roadworks National HighwaysStarts in 2 hours 24 seconds
A580 Eastbound to M60 Clockwise link road closure
M60 Clockwise lane 1 closure (MP 49/1 to 52/2)
Planned Roadworks National HighwaysStarts in 2 hours 24 seconds
M60 Clockwise lane 1 closure (MP 49/1 to 52/2)
M60 Anticlockwise Lanes 1 and 2 closure (MP 1/3 to 50/5)
Cleared Roadworks National HighwaysExpected to clear in 11 hours 24 seconds
M60 Anticlockwise Lanes 1 and 2 closure (MP 1/3 to 50/5)