M60 Anticlockwise hardshoulder closure (MP 6/7 to 5/8)
ClearedM60 Anticlockwise hardshoulder closure (MP 6/7 to 5/8)
- Start time
- Sat, Nov 29, 2025 6:00 AM
- Expected end
- Sat, Mar 7, 2026 6:00 AM
- Duration
- 3 months 6 days
- Road
- M60 – M60 Anti-Clockwise Within J5
- Category
- Road Maintenance
- Direction
- Anticlockwise
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Dec 8, 2025 11:22 AM
- Last updated
- Thu, Mar 5, 2026 12:28 PM
- Cleared
- Sat, Mar 7, 2026 6:00 AM
- Latest update: M60 Anticlockwise hardshoulder closure (MP 6/7 to 5/8)
- Coordinates
- 53.411707, -2.254980
- Latitude span
- 53.408736 – 53.413757
- Longitude span
- -2.260561 – -2.250752
- Bounding box centre
- 53.411247, -2.255657
- Location descriptions
-
- M60 anti-clockwise within J5
- M60 anti-clockwise between J5 and J4
- Feed validity status
- Active
- Overall feed start
- Sat, Nov 29, 2025 6:00 AM
- Overall feed end
- Sat, Mar 7, 2026 6:00 AM
- Feed window length
- 3 months 6 days
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M60 anti-clockwise within J5
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {4E2633F9-59B3-4AAC-8ABB-F816B2242C24}
- Linear Element Type
- B Carriageway
- From Distance
- 95 m
- To Distance
- 201 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.413757 -2.260561 53.413713 -2.260221 53.413481 -2.259025
Segment 2
12 coordinate pairs- Description
- M60 anti-clockwise between J5 and J4
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {84C67C62-5403-423B-80BF-3285CC30478E}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 432 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.411864 -2.254535 53.411858 -2.254523 53.411461 -2.253811 53.411238 -2.253448 53.411219 -2.253418 53.411058 -2.253176 53.410664 -2.252662 53.410511 -2.252481 53.410072 -2.251982 53.409812 -2.251725 53.408861 -2.250862 53.408736 -2.250752
Segment 3
8 coordinate pairs- Description
- M60 anti-clockwise between J5 and J4
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M60
- Linear Element Model
- The Network Model
- Linear Element Id
- {B130383E-772C-454B-BADB-BB3B2A1B412E}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 350 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.413481 -2.259025 53.413253 -2.258133 53.413061 -2.257464 53.41271 -2.256475 53.412464 -2.255847 53.412133 -2.255093 53.411989 -2.254776 53.411864 -2.254535
- Geometry type
- MultiLineString
- Geometry points
- 23
- First coordinate pair
- -2.260561, 53.413757
- Road section segments
- 1
- Road section points
- 23
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.260561,
53.413757
],
[
-2.260221,
53.413713
],
[
-2.259025,
53.413481
],
[
-2.254535,
53.411864
],
[
-2.254523,
53.411858
],
[
-2.253811,
53.411461
],
[
-2.253448,
53.411238
],
[
-2.253418,
53.411219
],
[
-2.253176,
53.411058
],
[
-2.252662,
53.410664
],
[
-2.252481,
53.410511
],
[
-2.251982,
53.410072
],
[
-2.251725,
53.409812
],
[
-2.250862,
53.408861
],
[
-2.250752,
53.408736
],
[
-2.259025,
53.413481
],
[
-2.258133,
53.413253
],
[
-2.257464,
53.413061
],
[
-2.256475,
53.41271
],
[
-2.255847,
53.412464
],
[
-2.255093,
53.412133
],
[
-2.254776,
53.411989
],
[
-2.254535,
53.411864
]
]
]
}
View road section coordinates
[
[
[
-2.260561,
53.413757
],
[
-2.260221,
53.413713
],
[
-2.259025,
53.413481
],
[
-2.254535,
53.411864
],
[
-2.254523,
53.411858
],
[
-2.253811,
53.411461
],
[
-2.253448,
53.411238
],
[
-2.253418,
53.411219
],
[
-2.253176,
53.411058
],
[
-2.252662,
53.410664
],
[
-2.252481,
53.410511
],
[
-2.251982,
53.410072
],
[
-2.251725,
53.409812
],
[
-2.250862,
53.408861
],
[
-2.250752,
53.408736
],
[
-2.259025,
53.413481
],
[
-2.258133,
53.413253
],
[
-2.257464,
53.413061
],
[
-2.256475,
53.41271
],
[
-2.255847,
53.412464
],
[
-2.255093,
53.412133
],
[
-2.254776,
53.411989
],
[
-2.254535,
53.411864
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Mon, Dec 8, 2025 11:22 AM
- Record versioned
- Thu, Mar 5, 2026 12:28 PM
- Coordinate source
- Geometry
Related incidents
M60 clockwise jct 19 entry slip road closure
Planned National HighwaysM60 clockwise jct 19 entry slip road closure
M60 Clockwise Lanes 1 and 2 closure (MP 45/5 to 47/6)
Planned National HighwaysM60 Clockwise Lanes 1 and 2 closure (MP 45/5 to 47/6)
M60 Clockwise Jct 22 exit slip road Lane closure
Planned National HighwaysM60 Clockwise Jct 22 exit slip road Lane closure
Mobile hardshoulder closure Clockwise and Anticlockwise
Active National HighwaysMobile hardshoulder closure Clockwise and Anticlockwise
M60 anticlockwise lanes 2 and 3 closure (MP 1/3 to 52/3)
Cleared National HighwaysM60 anticlockwise lanes 2 and 3 closure (MP 1/3 to 52/3)
M60 Clockwise Jct 22 exit slip road Lane closure
Planned National HighwaysM60 Clockwise Jct 22 exit slip road Lane closure