M6 Southbound closure of Lancaster services (Mp 374/9 - 374/1)
ClearedM6 Southbound closure of Lancaster services (Mp 374/9 - 374/1)
- Start time
- Fri, Apr 24, 2026 7:00 PM
- Expected end
- Sat, Apr 25, 2026 5:00 AM
- Duration
- 10 hours
- Road
- M6 – M6 Southbound Between J33 And J32
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Apr 24, 2026 3:34 AM
- Last updated
- Fri, Apr 24, 2026 6:38 AM
- Cleared
- Sat, Apr 25, 2026 5:00 AM
- Latest update: M6 Southbound closure of Lancaster services (Mp 374/9 - 374/1)
- Coordinates
- 53.961888, -2.759310
- Latitude span
- 53.959054 – 53.965204
- Longitude span
- -2.763452 – -2.755379
- Bounding box centre
- 53.962129, -2.759416
- Location descriptions
-
- M6 southbound between J33 and J32
- M6 southbound at the Lancaster Services between J33 and J32
- Feed validity status
- Planned
- Overall feed start
- Fri, Apr 24, 2026 7:00 PM
- Overall feed end
- Sat, Apr 25, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M6 southbound between J33 and J32
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M6
- Linear Element Model
- The Network Model
- Linear Element Id
- {8EC931F1-83B3-4086-8223-053091034B38}
- Linear Element Type
- B Carriageway
- From Distance
- 383 m
- To Distance
- 402 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.965204 -2.763452 53.96505 -2.76331
Segment 2
13 coordinate pairs- Description
- M6 southbound at the Lancaster Services between J33 and J32
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M6
- Linear Element Model
- The Network Model
- Linear Element Id
- {112579B6-13DA-4010-BE89-DA6242B8E7B3}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 836 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.96505 -2.76331 53.964539 -2.762755 53.963759 -2.761893 53.963464 -2.76155 53.962967 -2.760949 53.962429 -2.760313 53.961694 -2.759318 53.961069 -2.758422 53.960902 -2.758185 53.95975 -2.756463 53.959466 -2.756015 53.959444 -2.755981 53.959127 -2.75549
Segment 3
2 coordinate pairs- Description
- M6 southbound between J33 and J32
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M6
- Linear Element Model
- The Network Model
- Linear Element Id
- {96F9FF00-4AFC-4378-88F3-C2AE8F3C02F4}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 10 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.959127 -2.75549 53.959054 -2.755379
- Geometry type
- MultiLineString
- Geometry points
- 17
- First coordinate pair
- -2.763452, 53.965204
- Road section segments
- 1
- Road section points
- 17
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.763452,
53.965204
],
[
-2.76331,
53.96505
],
[
-2.76331,
53.96505
],
[
-2.762755,
53.964539
],
[
-2.761893,
53.963759
],
[
-2.76155,
53.963464
],
[
-2.760949,
53.962967
],
[
-2.760313,
53.962429
],
[
-2.759318,
53.961694
],
[
-2.758422,
53.961069
],
[
-2.758185,
53.960902
],
[
-2.756463,
53.95975
],
[
-2.756015,
53.959466
],
[
-2.755981,
53.959444
],
[
-2.75549,
53.959127
],
[
-2.75549,
53.959127
],
[
-2.755379,
53.959054
]
]
]
}
View road section coordinates
[
[
[
-2.763452,
53.965204
],
[
-2.76331,
53.96505
],
[
-2.76331,
53.96505
],
[
-2.762755,
53.964539
],
[
-2.761893,
53.963759
],
[
-2.76155,
53.963464
],
[
-2.760949,
53.962967
],
[
-2.760313,
53.962429
],
[
-2.759318,
53.961694
],
[
-2.758422,
53.961069
],
[
-2.758185,
53.960902
],
[
-2.756463,
53.95975
],
[
-2.756015,
53.959466
],
[
-2.755981,
53.959444
],
[
-2.75549,
53.959127
],
[
-2.75549,
53.959127
],
[
-2.755379,
53.959054
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 3
- Record created
- Fri, Apr 24, 2026 3:34 AM
- Record versioned
- Fri, Apr 24, 2026 6:38 AM
- Coordinate source
- Geometry
Driving on the M6? See every live closure, roadwork and planned restriction on this road.
M6 live closuresRelated incidents
Lane 3 and 4 closure southbound
Active Roadworks National HighwaysExpected to clear in 5 hours 25 minutes
Lane 3 and 4 closure southbound
M6 Southbound hardshoulder and lane 1 closure (MP 306/8 to 306/1)
Planned Roadworks National HighwaysExpected to clear in 4 hours 25 minutes
M6 Southbound hardshoulder and lane 1 closure (MP 306/8 to 306/1)
M6 Southbound Jct 31 to 30 Lane 1 closure (350/0B to 348/6B)
Active Roadworks National HighwaysExpected to clear in 4 hours 25 minutes
M6 Southbound Jct 31 to 30 Lane 1 closure (350/0B to 348/6B)
M6 Southbound Jct 35 to 34 Hardshoulder closure (Mp 390/5 - 390/1)
Planned Roadworks National HighwaysExpected to clear in 3 weeks 6 days
M6 Southbound Jct 35 to 34 Hardshoulder closure (Mp 390/5 - 390/1)
M6 northbound J16 to J17 - lane closure for structure - maintenance on behalf of National Highways
Planned Roadworks National HighwaysExpected to clear in 3 months 2 weeks
M6 northbound J16 to J17 - lane closure for structure - maintenance on behalf of National Highways
M6 Northbound and Southbound mobile hardshoulder closure (MP 290/5 - 346/6)
Active Roadworks National HighwaysExpected to clear in 1 year 9 months
M6 Northbound and Southbound mobile hardshoulder closure (MP 290/5 - 346/6)