M58 Eastbound lanes 2 and 3 closure (MP 15/4 to 16/4)
ClearedM58 Eastbound lanes 2 and 3 closure (MP 15/4 to 16/4)
- Start time
- Sat, Jan 3, 2026 9:00 AM
- Expected end
- Sat, Jan 3, 2026 2:30 PM
- Duration
- 5 hours 30 minutes
- Road
- M58 – M58 Eastbound Between J1 And J3
- Category
- Construction Work
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- 2 of 2 lanes affected
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Dec 22, 2025 11:22 AM
- Last updated
- Sat, Jan 3, 2026 8:41 AM
- Cleared
- Sat, Jan 3, 2026 2:30 PM
- Latest update: M58 Eastbound lanes 2 and 3 closure (MP 15/4 to 16/4)
- Coordinates
- 53.522206, -2.877849
- Latitude span
- 53.519803 – 53.524149
- Longitude span
- -2.886873 – -2.872531
- Bounding box centre
- 53.521976, -2.879702
- Location descriptions
-
- M58 eastbound between J1 and J3
- Feed validity status
- Planned
- Overall feed start
- Sat, Jan 3, 2026 9:00 AM
- Overall feed end
- Sat, Jan 3, 2026 2:30 PM
- Feed window length
- 5 hours 30 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M58 eastbound between J1 and J3
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M58
- Linear Element Model
- The Network Model
- Linear Element Id
- {81562A65-0BF4-42BD-879B-8A85C0BFC565}
- Linear Element Type
- A Carriageway
- From Distance
- 220 m
- To Distance
- 458 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.519803 -2.886873 53.520404 -2.88435 53.520601 -2.883544
Segment 2
11 coordinate pairs- Description
- M58 eastbound between J1 and J3
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M58
- Linear Element Model
- The Network Model
- Linear Element Id
- {F3305CBE-D525-4B3A-BB14-13340481BC5D}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 491 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.520601 -2.883544 53.521059 -2.881668 53.521217 -2.881023 53.521441 -2.880047 53.521531 -2.879656 53.521718 -2.878952 53.521851 -2.878423 53.522081 -2.877657 53.522171 -2.877347 53.522234 -2.877128 53.522367 -2.876757
Segment 3
11 coordinate pairs- Description
- M58 eastbound between J1 and J3
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M58
- Linear Element Model
- The Network Model
- Linear Element Id
- {88CD6CE7-089B-481C-B9ED-0DBE0C37FB40}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 343 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.522367 -2.876757 53.522528 -2.876292 53.52271 -2.875784 53.522721 -2.875757 53.52291 -2.875276 53.523262 -2.874392 53.523565 -2.873736 53.523851 -2.873129 53.523935 -2.872933 53.524073 -2.872673 53.524149 -2.872531
- Geometry type
- MultiLineString
- Geometry points
- 25
- First coordinate pair
- -2.886873, 53.519803
- Road section segments
- 1
- Road section points
- 25
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.886873,
53.519803
],
[
-2.88435,
53.520404
],
[
-2.883544,
53.520601
],
[
-2.883544,
53.520601
],
[
-2.881668,
53.521059
],
[
-2.881023,
53.521217
],
[
-2.880047,
53.521441
],
[
-2.879656,
53.521531
],
[
-2.878952,
53.521718
],
[
-2.878423,
53.521851
],
[
-2.877657,
53.522081
],
[
-2.877347,
53.522171
],
[
-2.877128,
53.522234
],
[
-2.876757,
53.522367
],
[
-2.876757,
53.522367
],
[
-2.876292,
53.522528
],
[
-2.875784,
53.52271
],
[
-2.875757,
53.522721
],
[
-2.875276,
53.52291
],
[
-2.874392,
53.523262
],
[
-2.873736,
53.523565
],
[
-2.873129,
53.523851
],
[
-2.872933,
53.523935
],
[
-2.872673,
53.524073
],
[
-2.872531,
53.524149
]
]
]
}
View road section coordinates
[
[
[
-2.886873,
53.519803
],
[
-2.88435,
53.520404
],
[
-2.883544,
53.520601
],
[
-2.883544,
53.520601
],
[
-2.881668,
53.521059
],
[
-2.881023,
53.521217
],
[
-2.880047,
53.521441
],
[
-2.879656,
53.521531
],
[
-2.878952,
53.521718
],
[
-2.878423,
53.521851
],
[
-2.877657,
53.522081
],
[
-2.877347,
53.522171
],
[
-2.877128,
53.522234
],
[
-2.876757,
53.522367
],
[
-2.876757,
53.522367
],
[
-2.876292,
53.522528
],
[
-2.875784,
53.52271
],
[
-2.875757,
53.522721
],
[
-2.875276,
53.52291
],
[
-2.874392,
53.523262
],
[
-2.873736,
53.523565
],
[
-2.873129,
53.523851
],
[
-2.872933,
53.523935
],
[
-2.872673,
53.524073
],
[
-2.872531,
53.524149
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Dec 22, 2025 11:22 AM
- Record versioned
- Sat, Jan 3, 2026 8:41 AM
- Coordinate source
- Geometry
Driving on the M58? See every live closure, roadwork and planned restriction on this road.
M58 live closuresRelated incidents
Mobile Hardshoulder closure East & Westbound from Switch Island - M6
Active Roadworks National HighwaysExpected to clear in 9 months 2 weeks
Mobile Hardshoulder closure East & Westbound from Switch Island - M6
M58 Eastbound hardshoulder closure (Switch Island to Junction 1)
Cleared Roadworks National HighwaysCleared 3 hours 49 minutes ago
M58 Eastbound hardshoulder closure (Switch Island to Junction 1)
M58 Eastbound hardshoulder closure (Switch Island to Junction 1)
Cleared Roadworks National HighwaysCleared 6 hours 4 minutes ago
M58 Eastbound hardshoulder closure (Switch Island to Junction 1)
M58 Eastbound lane 3 closure (MP 19/9 to 18/6)
Cleared Roadworks National HighwaysCleared 2 days 18 hours ago
M58 Eastbound lane 3 closure (MP 19/9 to 18/6)
M58 Eastbound lane 3 closure (MP 19/9 to 18/6)
Cleared Roadworks National HighwaysCleared 2 days 13 hours ago
M58 Eastbound lane 3 closure (MP 19/9 to 18/6)
A59 Southbound Lane 2 closure
Cleared Roadworks National HighwaysCleared 5 days 10 hours ago
A59 Southbound Lane 2 closure