M57 Southbound to M62 Eastbound lane 1 closure
PlannedM57 Southbound to M62 Eastbound lane 1 closure
- Start time
- Sat, Jun 13, 2026 8:00 PM
- Expected end
- Sun, Jun 14, 2026 4:00 AM
- Duration
- 8 hours
- Road
- M62 – M62 Eastbound Between J6 And J7
- Category
- Construction Work
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 3 lanes affected, 1 of 2 lanes affected, 1 of 1 lanes affected
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, May 26, 2026 12:48 PM
- Last updated
- Sat, Jun 13, 2026 11:04 PM
- Cleared
- Sun, Jun 14, 2026 4:00 AM
- Latest update: M57 Southbound to M62 Eastbound lane 1 closure
- Coordinates
- 53.401691, -2.802900
- Latitude span
- 53.400131 – 53.405515
- Longitude span
- -2.813186 – -2.787014
- Bounding box centre
- 53.402823, -2.800100
- Location descriptions
-
- M62 eastbound between J6 and J7
- M57 J1 southbound exit
- fast slip from M57 to M62 J6 eastbound
- M57 southbound between J2 and J1
- Feed validity status
- Planned
- Overall feed start
- Sat, Jun 13, 2026 8:00 PM
- Overall feed end
- Sun, Jun 14, 2026 4:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
10 coordinate pairs- Description
- M62 eastbound between J6 and J7
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {77BAD9EE-1863-426C-A388-42B8439B0329}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 560 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.401262 -2.795413 53.40128 -2.795234 53.401416 -2.793672 53.401475 -2.792936 53.401557 -2.791433 53.40158 -2.790697 53.401617 -2.789058 53.401625 -2.78796 53.401618 -2.787584 53.401607 -2.787014
Segment 2
12 coordinate pairs- Description
- M57 J1 southbound exit
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M57
- Linear Element Model
- The Network Model
- Linear Element Id
- {007052EC-DC1E-482C-8D65-574A5FE0AF1F}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 660 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.404969 -2.812979 53.404059 -2.812326 53.403301 -2.811825 53.402644 -2.811395 53.402153 -2.810984 53.40175 -2.810544 53.401457 -2.810153 53.401128 -2.809583 53.400901 -2.809115 53.400606 -2.808322 53.400435 -2.807693 53.400353 -2.80736
Segment 3
14 coordinate pairs- Description
- fast slip from M57 to M62 J6 eastbound
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M62
- Linear Element Model
- The Network Model
- Linear Element Id
- {9CD7EADE-E10E-4732-8E68-09955B1E7C3C}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 811 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.400353 -2.80736 53.400296 -2.807126 53.400235 -2.806631 53.400131 -2.805594 53.400157 -2.804506 53.400211 -2.803897 53.400238 -2.803713 53.400342 -2.802972 53.400578 -2.801494 53.400838 -2.799877 53.401023 -2.79846 53.40117 -2.79718 53.401232 -2.796209 53.401262 -2.795413
Segment 4
4 coordinate pairs- Description
- M57 southbound between J2 and J1
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M57
- Linear Element Model
- The Network Model
- Linear Element Id
- {B0760C64-573D-4754-A21C-CF2EF699EA65}
- Linear Element Type
- B Carriageway
- From Distance
- 60 m
- To Distance
- 122 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.405515 -2.813186 53.405222 -2.813087 53.405086 -2.813029 53.404969 -2.812979
- Geometry type
- MultiLineString
- Geometry points
- 40
- First coordinate pair
- -2.795413, 53.401262
- Road section segments
- 1
- Road section points
- 40
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.795413,
53.401262
],
[
-2.795234,
53.40128
],
[
-2.793672,
53.401416
],
[
-2.792936,
53.401475
],
[
-2.791433,
53.401557
],
[
-2.790697,
53.40158
],
[
-2.789058,
53.401617
],
[
-2.78796,
53.401625
],
[
-2.787584,
53.401618
],
[
-2.787014,
53.401607
],
[
-2.812979,
53.404969
],
[
-2.812326,
53.404059
],
[
-2.811825,
53.403301
],
[
-2.811395,
53.402644
],
[
-2.810984,
53.402153
],
[
-2.810544,
53.40175
],
[
-2.810153,
53.401457
],
[
-2.809583,
53.401128
],
[
-2.809115,
53.400901
],
[
-2.808322,
53.400606
],
[
-2.807693,
53.400435
],
[
-2.80736,
53.400353
],
[
-2.80736,
53.400353
],
[
-2.807126,
53.400296
],
[
-2.806631,
53.400235
],
[
-2.805594,
53.400131
],
[
-2.804506,
53.400157
],
[
-2.803897,
53.400211
],
[
-2.803713,
53.400238
],
[
-2.802972,
53.400342
],
[
-2.801494,
53.400578
],
[
-2.799877,
53.400838
],
[
-2.79846,
53.401023
],
[
-2.79718,
53.40117
],
[
-2.796209,
53.401232
],
[
-2.795413,
53.401262
],
[
-2.813186,
53.405515
],
[
-2.813087,
53.405222
],
[
-2.813029,
53.405086
],
[
-2.812979,
53.404969
]
]
]
}
View road section coordinates
[
[
[
-2.795413,
53.401262
],
[
-2.795234,
53.40128
],
[
-2.793672,
53.401416
],
[
-2.792936,
53.401475
],
[
-2.791433,
53.401557
],
[
-2.790697,
53.40158
],
[
-2.789058,
53.401617
],
[
-2.78796,
53.401625
],
[
-2.787584,
53.401618
],
[
-2.787014,
53.401607
],
[
-2.812979,
53.404969
],
[
-2.812326,
53.404059
],
[
-2.811825,
53.403301
],
[
-2.811395,
53.402644
],
[
-2.810984,
53.402153
],
[
-2.810544,
53.40175
],
[
-2.810153,
53.401457
],
[
-2.809583,
53.401128
],
[
-2.809115,
53.400901
],
[
-2.808322,
53.400606
],
[
-2.807693,
53.400435
],
[
-2.80736,
53.400353
],
[
-2.80736,
53.400353
],
[
-2.807126,
53.400296
],
[
-2.806631,
53.400235
],
[
-2.805594,
53.400131
],
[
-2.804506,
53.400157
],
[
-2.803897,
53.400211
],
[
-2.803713,
53.400238
],
[
-2.802972,
53.400342
],
[
-2.801494,
53.400578
],
[
-2.799877,
53.400838
],
[
-2.79846,
53.401023
],
[
-2.79718,
53.40117
],
[
-2.796209,
53.401232
],
[
-2.795413,
53.401262
],
[
-2.813186,
53.405515
],
[
-2.813087,
53.405222
],
[
-2.813029,
53.405086
],
[
-2.812979,
53.404969
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, May 26, 2026 12:48 PM
- Record versioned
- Sat, Jun 13, 2026 11:04 PM
- Coordinate source
- Geometry
Driving on the M62? See every live closure, roadwork and planned restriction on this road.
M62 live closuresRelated incidents
M62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
Planned Roadworks National HighwaysExpected to clear in 5 hours 50 minutes
M62 eastbound Jct 25 to Jct 26 lane 1 and 2 closure ( 94/0 96/4)
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
Active Roadworks National HighwaysExpected to clear in 1 year 9 months
M62 Eastbound and Westbound mobile hardshoulder closure (MP 12/0 - 28/2)
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
Active Roadworks National HighwaysExpected to clear in 3 months 3 weeks
M62 eastbound hard shoulder running lane 3 closure (MP 65/9 to 67/0)
M62 Eastbound lanes 1 and 2 closure (MP 64/5 to 66/0)
Cleared Roadworks National HighwaysCleared 3 hours 9 minutes ago
M62 Eastbound lanes 1 and 2 closure (MP 64/5 to 66/0)
M62 eastbound Jct 22 to Jct 23 lane 3 closure (81/1 82/5)
Cleared Roadworks National HighwaysCleared 18 hours 9 minutes ago
M62 eastbound Jct 22 to Jct 23 lane 3 closure (81/1 82/5)
M62 eastbound Jct 22 to Jct 23 lane 3 closure (81/1 82/5)
Cleared Roadworks National HighwaysCleared 19 hours 9 minutes ago
M62 eastbound Jct 22 to Jct 23 lane 3 closure (81/1 82/5)