M56 Eastbound lane 1 closure (MP 58/0 to 57/3)
ClearedM56 Eastbound lane 1 closure (MP 58/0 to 57/3)
- Start time
- Fri, Dec 19, 2025 11:00 PM
- Expected end
- Sat, Dec 20, 2025 6:00 AM
- Duration
- 7 hours
- Road
- M56 – M56 Eastbound Between A494 And J15
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 2 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Nov 24, 2025 10:44 AM
- Last updated
- Fri, Dec 19, 2025 8:30 PM
- Cleared
- Sat, Dec 20, 2025 6:00 AM
- Latest update: M56 Eastbound lane 1 closure (MP 58/0 to 57/3)
- Coordinates
- 53.251478, -2.887385
- Latitude span
- 53.251211 – 53.251592
- Longitude span
- -2.892597 – -2.881831
- Bounding box centre
- 53.251402, -2.887214
- Location descriptions
-
- M56 eastbound between A494 and J15
- Feed validity status
- Planned
- Overall feed start
- Fri, Dec 19, 2025 11:00 PM
- Overall feed end
- Sat, Dec 20, 2025 6:00 AM
- Feed window length
- 7 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
8 coordinate pairs- Description
- M56 eastbound between A494 and J15
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M56
- Linear Element Model
- The Network Model
- Linear Element Id
- {CA12D19A-6CBA-4F96-815A-57D4FC7830AB}
- Linear Element Type
- B Carriageway
- From Distance
- 369 m
- To Distance
- 601 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.251211 -2.892597 53.251282 -2.891759 53.251322 -2.89122 53.251342 -2.890951 53.251362 -2.890607 53.251382 -2.890397 53.251442 -2.889529 53.251454 -2.889155
Segment 2
13 coordinate pairs- Description
- M56 eastbound between A494 and J15
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M56
- Linear Element Model
- The Network Model
- Linear Element Id
- {CC448A88-6E2D-43C4-98C6-6E25323CD38C}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 489 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.251454 -2.889155 53.251474 -2.888825 53.251538 -2.887493 53.251575 -2.886115 53.251578 -2.88574 53.251578 -2.885725 53.251579 -2.88559 53.251586 -2.884721 53.251587 -2.884601 53.251592 -2.883912 53.251588 -2.883177 53.251561 -2.881993 53.251555 -2.881831
- Geometry type
- MultiLineString
- Geometry points
- 21
- First coordinate pair
- -2.892597, 53.251211
- Road section segments
- 1
- Road section points
- 21
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.892597,
53.251211
],
[
-2.891759,
53.251282
],
[
-2.89122,
53.251322
],
[
-2.890951,
53.251342
],
[
-2.890607,
53.251362
],
[
-2.890397,
53.251382
],
[
-2.889529,
53.251442
],
[
-2.889155,
53.251454
],
[
-2.889155,
53.251454
],
[
-2.888825,
53.251474
],
[
-2.887493,
53.251538
],
[
-2.886115,
53.251575
],
[
-2.88574,
53.251578
],
[
-2.885725,
53.251578
],
[
-2.88559,
53.251579
],
[
-2.884721,
53.251586
],
[
-2.884601,
53.251587
],
[
-2.883912,
53.251592
],
[
-2.883177,
53.251588
],
[
-2.881993,
53.251561
],
[
-2.881831,
53.251555
]
]
]
}
View road section coordinates
[
[
[
-2.892597,
53.251211
],
[
-2.891759,
53.251282
],
[
-2.89122,
53.251322
],
[
-2.890951,
53.251342
],
[
-2.890607,
53.251362
],
[
-2.890397,
53.251382
],
[
-2.889529,
53.251442
],
[
-2.889155,
53.251454
],
[
-2.889155,
53.251454
],
[
-2.888825,
53.251474
],
[
-2.887493,
53.251538
],
[
-2.886115,
53.251575
],
[
-2.88574,
53.251578
],
[
-2.885725,
53.251578
],
[
-2.88559,
53.251579
],
[
-2.884721,
53.251586
],
[
-2.884601,
53.251587
],
[
-2.883912,
53.251592
],
[
-2.883177,
53.251588
],
[
-2.881993,
53.251561
],
[
-2.881831,
53.251555
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Nov 24, 2025 10:44 AM
- Record versioned
- Fri, Dec 19, 2025 8:30 PM
- Coordinate source
- Geometry
Driving on the M56? See every live closure, roadwork and planned restriction on this road.
M56 live closuresRelated incidents
M56 eastbound jct 12 - 11 lanes one and two closure (MP 44/5 - 39/9)
Active Roadworks National HighwaysExpected to clear in 1 hour 33 minutes
M56 eastbound jct 12 - 11 lanes one and two closure (MP 44/5 - 39/9)
A483 : Southbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 08/06/26-19/06/26 1900-0600 :
Active Roadworks Traffic WalesDescription: A483 : Southbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 08/06/26-19/06/26 1900-0600 :, Start time: 08/06/2026 19:00 , End Date: 19/06/2026 6:00, Severity: Road closure, Source: Welsh Government, Last updated: 12/06/2026 13:46
A483 : Northbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 15/06/26-19/06/26 1900-0600 :
Active Roadworks Traffic WalesDescription: A483 : Northbound : Rhostyllen : Resurfacing work : Exit slip road closed : Diversions in place : 15/06/26-19/06/26 1900-0600 :, Start time: 15/06/2026 19:00 , End Date: 19/06/2026 6:00, Severity: Road closure, Source: Welsh Government, Last updated: 12/06/2026 13:48
M53 Southbound lane 2 closure (MP 27/0 to 31/8)
Planned Roadworks National HighwaysStarts in 17 hours 33 minutes
M53 Southbound lane 2 closure (MP 27/0 to 31/8)
A55 Westbound Jct 38 entry slip road Lane 1 closure
Planned Roadworks National HighwaysStarts in 16 hours 33 minutes
A55 Westbound Jct 38 entry slip road Lane 1 closure
M56 eastbound jct 12 - 11 lanes one and two closure (MP 44/5 - 39/9)
Planned Roadworks National HighwaysStarts in 16 hours 33 minutes
M56 eastbound jct 12 - 11 lanes one and two closure (MP 44/5 - 39/9)