M55 Eastbound Jct 4 to 3 Lane 1 closure (Mp 11/2 - 12/6)
PlannedM55 Eastbound Jct 4 to 3 Lane 1 closure (Mp 11/2 - 12/6)
- Start time
- Fri, Oct 30, 2026 8:00 PM
- Expected end
- Sat, Oct 31, 2026 5:00 AM
- Duration
- 9 hours
- Road
- M55 – M55 Eastbound Within J3
- Category
- Construction Work
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 3 lanes affected
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Oct 7, 2026 9:52 AM
- Last updated
- Fri, Oct 30, 2026 8:10 AM
- Cleared
- Sat, Oct 31, 2026 5:00 AM
- Latest update: M55 Eastbound Jct 4 to 3 Lane 1 closure (Mp 11/2 - 12/6)
- Coordinates
- 53.806520, -2.903101
- Latitude span
- 53.805543 – 53.807086
- Longitude span
- -2.912605 – -2.892463
- Bounding box centre
- 53.806315, -2.902534
- Location descriptions
-
- M55 eastbound within J3
- M55 eastbound between J4 and J3
- Feed validity status
- Planned
- Overall feed start
- Fri, Oct 30, 2026 8:00 PM
- Overall feed end
- Sat, Oct 31, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M55 eastbound within J3
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M55
- Linear Element Model
- The Network Model
- Linear Element Id
- {47E3CE56-CEC6-4936-BE1E-BFDDAC893365}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 318 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.806992 -2.897291 53.807056 -2.894661 53.807086 -2.892463
Segment 2
5 coordinate pairs- Description
- M55 eastbound between J4 and J3
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M55
- Linear Element Model
- The Network Model
- Linear Element Id
- {386FE316-6657-4BD8-BE03-89759A5C6FBE}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 170 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.806869 -2.899864 53.806869 -2.899859 53.80691 -2.899312 53.806966 -2.898118 53.806992 -2.897291
Segment 3
13 coordinate pairs- Description
- M55 eastbound between J4 and J3
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M55
- Linear Element Model
- The Network Model
- Linear Element Id
- {4ED96DF3-3EDF-48F5-9E73-B5AFDAA68610}
- Linear Element Type
- A Carriageway
- From Distance
- 11 m
- To Distance
- 864 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.805543 -2.912605 53.805544 -2.912596 53.805715 -2.91136 53.805858 -2.910276 53.806015 -2.909088 53.806218 -2.90748 53.80631 -2.90666 53.806396 -2.90576 53.806568 -2.904011 53.806645 -2.903128 53.806723 -2.902163 53.806781 -2.901277 53.806869 -2.899864
- Geometry type
- MultiLineString
- Geometry points
- 21
- First coordinate pair
- -2.897291, 53.806992
- Road section segments
- 1
- Road section points
- 21
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.897291,
53.806992
],
[
-2.894661,
53.807056
],
[
-2.892463,
53.807086
],
[
-2.899864,
53.806869
],
[
-2.899859,
53.806869
],
[
-2.899312,
53.80691
],
[
-2.898118,
53.806966
],
[
-2.897291,
53.806992
],
[
-2.912605,
53.805543
],
[
-2.912596,
53.805544
],
[
-2.91136,
53.805715
],
[
-2.910276,
53.805858
],
[
-2.909088,
53.806015
],
[
-2.90748,
53.806218
],
[
-2.90666,
53.80631
],
[
-2.90576,
53.806396
],
[
-2.904011,
53.806568
],
[
-2.903128,
53.806645
],
[
-2.902163,
53.806723
],
[
-2.901277,
53.806781
],
[
-2.899864,
53.806869
]
]
]
}
View road section coordinates
[
[
[
-2.897291,
53.806992
],
[
-2.894661,
53.807056
],
[
-2.892463,
53.807086
],
[
-2.899864,
53.806869
],
[
-2.899859,
53.806869
],
[
-2.899312,
53.80691
],
[
-2.898118,
53.806966
],
[
-2.897291,
53.806992
],
[
-2.912605,
53.805543
],
[
-2.912596,
53.805544
],
[
-2.91136,
53.805715
],
[
-2.910276,
53.805858
],
[
-2.909088,
53.806015
],
[
-2.90748,
53.806218
],
[
-2.90666,
53.80631
],
[
-2.90576,
53.806396
],
[
-2.904011,
53.806568
],
[
-2.903128,
53.806645
],
[
-2.902163,
53.806723
],
[
-2.901277,
53.806781
],
[
-2.899864,
53.806869
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Oct 7, 2026 9:52 AM
- Record versioned
- Fri, Oct 30, 2026 8:10 AM
- Coordinate source
- Geometry
Driving on the M55? See every live closure, roadwork and planned restriction on this road.
M55 live closuresRelated incidents
M55 Westbound Jct 2 Lane 3 and 2 closure (21/8B to 19/0B)
Planned Roadworks National HighwaysStarts in 11 hours 27 minutes
M55 Westbound Jct 2 Lane 3 and 2 closure (21/8B to 19/0B)
M55 Eastbound Jct 1 lanes 3 and 2 closure (23/1A to 24/1A)
Cleared Roadworks National HighwaysCleared 8 hours 22 minutes ago
M55 Eastbound Jct 1 lanes 3 and 2 closure (23/1A to 24/1A)
M55 Eastbound Jct 3 to 4 lane 3 closure (6/6A to 9/0A)
Cleared Roadworks National HighwaysCleared 6 hours 32 minutes ago
M55 Eastbound Jct 3 to 4 lane 3 closure (6/6A to 9/0A)
M55 Westbound Jct 2 Lane 3 and 2 closure (21/8B to 19/0B)
Cleared Roadworks National HighwaysCleared 1 day 12 hours ago
M55 Westbound Jct 2 Lane 3 and 2 closure (21/8B to 19/0B)
M55 Westbound Jct 2 Lane 3 and 2 closure (21/8B to 19/0B)
Cleared Roadworks National HighwaysCleared 1 day 8 hours ago
M55 Westbound Jct 2 Lane 3 and 2 closure (21/8B to 19/0B)
M55 Westbound Jct 3 Entry slip Lane 1 closure
Cleared Roadworks National HighwaysCleared 1 day 9 hours ago
M55 Westbound Jct 3 Entry slip Lane 1 closure