M55 Eastbound Jct 4 carriageway closure (traffic to go up and over the slips)
ActiveM55 Eastbound Jct 4 carriageway closure (traffic to go up and over the slips)
- Start time
- Mon, Oct 12, 2026 7:22 PM
- Expected end
- Tue, Oct 13, 2026 5:00 AM
- Duration
- 9 hours 38 minutes
- Road
- M55 – M55 Eastbound Within J4
- Category
- Construction Work
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Oct 12, 2026 7:22 PM
- Last updated
- Mon, Oct 12, 2026 10:29 PM
- Cleared
- Tue, Oct 13, 2026 5:00 AM
- Latest update: M55 Eastbound Jct 4 carriageway closure (traffic to go up and over the slips)
- Coordinates
- 53.794520, -2.970110
- Latitude span
- 53.793967 – 53.795323
- Longitude span
- -2.983177 – -2.960566
- Bounding box centre
- 53.794645, -2.971872
- Location descriptions
-
- M55 eastbound within J4
- M55 eastbound between J4 and J3
- Feed validity status
- Active
- Overall feed start
- Mon, Oct 12, 2026 7:22 PM
- Overall feed end
- Tue, Oct 13, 2026 5:00 AM
- Feed window length
- 9 hours 38 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M55 eastbound within J4
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M55
- Linear Element Model
- The Network Model
- Linear Element Id
- {4A21F575-4E0F-4F77-A878-94E15374716F}
- Linear Element Type
- A Carriageway
- From Distance
- 8 m
- To Distance
- 317 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.793967 -2.983177 53.793979 -2.982676 53.794107 -2.978528 53.794117 -2.978498
Segment 2
18 coordinate pairs- Description
- M55 eastbound between J4 and J3
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M55
- Linear Element Model
- The Network Model
- Linear Element Id
- {C07DD5FA-A55E-421B-8EEF-839F56261CDE}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 1,192 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.794117 -2.978498 53.794161 -2.976284 53.794187 -2.975398 53.794245 -2.973027 53.794304 -2.97086 53.794325 -2.970186 53.794363 -2.96955 53.794398 -2.968958 53.79442 -2.968517 53.79453 -2.967018 53.794678 -2.965428 53.794823 -2.964125 53.794845 -2.963944 53.79494 -2.963157 53.795148 -2.961673 53.79515 -2.961659 53.795301 -2.960691 53.795323 -2.960566
- Geometry type
- MultiLineString
- Geometry points
- 22
- First coordinate pair
- -2.983177, 53.793967
- Road section segments
- 1
- Road section points
- 22
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.983177,
53.793967
],
[
-2.982676,
53.793979
],
[
-2.978528,
53.794107
],
[
-2.978498,
53.794117
],
[
-2.978498,
53.794117
],
[
-2.976284,
53.794161
],
[
-2.975398,
53.794187
],
[
-2.973027,
53.794245
],
[
-2.97086,
53.794304
],
[
-2.970186,
53.794325
],
[
-2.96955,
53.794363
],
[
-2.968958,
53.794398
],
[
-2.968517,
53.79442
],
[
-2.967018,
53.79453
],
[
-2.965428,
53.794678
],
[
-2.964125,
53.794823
],
[
-2.963944,
53.794845
],
[
-2.963157,
53.79494
],
[
-2.961673,
53.795148
],
[
-2.961659,
53.79515
],
[
-2.960691,
53.795301
],
[
-2.960566,
53.795323
]
]
]
}
View road section coordinates
[
[
[
-2.983177,
53.793967
],
[
-2.982676,
53.793979
],
[
-2.978528,
53.794107
],
[
-2.978498,
53.794117
],
[
-2.978498,
53.794117
],
[
-2.976284,
53.794161
],
[
-2.975398,
53.794187
],
[
-2.973027,
53.794245
],
[
-2.97086,
53.794304
],
[
-2.970186,
53.794325
],
[
-2.96955,
53.794363
],
[
-2.968958,
53.794398
],
[
-2.968517,
53.79442
],
[
-2.967018,
53.79453
],
[
-2.965428,
53.794678
],
[
-2.964125,
53.794823
],
[
-2.963944,
53.794845
],
[
-2.963157,
53.79494
],
[
-2.961673,
53.795148
],
[
-2.961659,
53.79515
],
[
-2.960691,
53.795301
],
[
-2.960566,
53.795323
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Oct 12, 2026 7:22 PM
- Record versioned
- Mon, Oct 12, 2026 10:29 PM
- Coordinate source
- Geometry
Driving on the M55? See every live closure, roadwork and planned restriction on this road.
M55 live closuresRelated incidents
A585 Southbound Skippool lane 1 closure switching to lane 2
Cleared Roadworks National HighwaysCleared 50 minutes 28 seconds ago
A585 Southbound Skippool lane 1 closure switching to lane 2
M55 Eastbound Jct Lane 1 closure becoming Lane 1,2 and 3 closure after Jct 1 Entry Slip (24/3A to 26/3A) (Splitter at M6 NB Link becoming Lane 1 Closure on M6 SB Link)
Cleared Roadworks National HighwaysCleared 3 hours 55 minutes ago
M55 Eastbound Jct Lane 1 closure becoming Lane 1,2 and 3 closure after Jct 1 Entry Slip (24/3A to 26/3A) (Splitter at M6 NB Link becoming Lane 1 Closure on M6 SB Link)
A585 Southbound Skippool lane 1 closure switching to lane 2
Cleared Roadworks National HighwaysCleared 3 hours 20 minutes ago
A585 Southbound Skippool lane 1 closure switching to lane 2
M55 Eastbound Jct 4 carriageway closure (traffic to go up and over the slips)
Cleared Roadworks National HighwaysCleared 3 hours 28 seconds ago
M55 Eastbound Jct 4 carriageway closure (traffic to go up and over the slips)
M55 Eastbound Jct 1 lanes 3 and 2 closure (23/1A to 24/1A)
Cleared Roadworks National HighwaysCleared 2 days 2 hours ago
M55 Eastbound Jct 1 lanes 3 and 2 closure (23/1A to 24/1A)
M55 eastbound Jct 4 to 2 lane 1 and 2 closure (12/7A to 15/2A)
Cleared Roadworks National HighwaysCleared 5 days 3 hours ago
M55 eastbound Jct 4 to 2 lane 1 and 2 closure (12/7A to 15/2A)