M55 Eastbound Jct 2 to 1 Lane 3/2 closure leading to carriageway closure Mp 23/1 - 24/0)
ClearedM55 Eastbound Jct 2 to 1 Lane 3/2 closure leading to carriageway closure Mp 23/1 - 24/0)
- Start time
- Sat, Jul 4, 2026 8:45 PM
- Expected end
- Sun, Jul 5, 2026 2:00 AM
- Duration
- 5 hours 1 second
- Road
- M55 – M55 Eastbound Within J1
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Sat, Jul 4, 2026 8:45 PM
- Last updated
- Sun, Jul 5, 2026 1:29 AM
- Cleared
- Sun, Jul 5, 2026 1:45 AM
- Latest update: M55 Eastbound Jct 2 to 1 Lane 3/2 closure leading to carriageway closure Mp 23/1 - 24/0)
- Coordinates
- 53.799488, -2.727598
- Latitude span
- 53.798720 – 53.800205
- Longitude span
- -2.733626 – -2.722052
- Bounding box centre
- 53.799463, -2.727839
- Location descriptions
-
- M55 eastbound within J1
- M55 eastbound between J2 and J1
- Feed validity status
- Active
- Overall feed start
- Sat, Jul 4, 2026 8:45 PM
- Overall feed end
- Sun, Jul 5, 2026 2:00 AM
- Feed window length
- 5 hours 15 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M55 eastbound within J1
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M55
- Linear Element Model
- The Network Model
- Linear Element Id
- {D079BB2C-03BA-4900-93E2-083825C6FF56}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 15 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.800175 -2.722277 53.800205 -2.722052
Segment 2
2 coordinate pairs- Description
- M55 eastbound between J2 and J1
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M55
- Linear Element Model
- The Network Model
- Linear Element Id
- {455A1EC6-2872-489A-A276-1AC389D1984F}
- Linear Element Type
- A Carriageway
- From Distance
- 1,666 m
- To Distance
- 1,684 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.79872 -2.733626 53.79875 -2.73335
Segment 3
11 coordinate pairs- Description
- M55 eastbound between J2 and J1
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M55
- Linear Element Model
- The Network Model
- Linear Element Id
- {32E88269-FAB3-487A-AF31-682CD19AD010}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 746 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.79875 -2.73335 53.798836 -2.732623 53.799005 -2.73129 53.79914 -2.73023 53.799262 -2.729275 53.799308 -2.728912 53.799825 -2.72511 53.800014 -2.723549 53.800024 -2.723489 53.800137 -2.722564 53.800175 -2.722277
- Geometry type
- MultiLineString
- Geometry points
- 15
- First coordinate pair
- -2.722277, 53.800175
- Road section segments
- 1
- Road section points
- 15
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.722277,
53.800175
],
[
-2.722052,
53.800205
],
[
-2.733626,
53.79872
],
[
-2.73335,
53.79875
],
[
-2.73335,
53.79875
],
[
-2.732623,
53.798836
],
[
-2.73129,
53.799005
],
[
-2.73023,
53.79914
],
[
-2.729275,
53.799262
],
[
-2.728912,
53.799308
],
[
-2.72511,
53.799825
],
[
-2.723549,
53.800014
],
[
-2.723489,
53.800024
],
[
-2.722564,
53.800137
],
[
-2.722277,
53.800175
]
]
]
}
View road section coordinates
[
[
[
-2.722277,
53.800175
],
[
-2.722052,
53.800205
],
[
-2.733626,
53.79872
],
[
-2.73335,
53.79875
],
[
-2.73335,
53.79875
],
[
-2.732623,
53.798836
],
[
-2.73129,
53.799005
],
[
-2.73023,
53.79914
],
[
-2.729275,
53.799262
],
[
-2.728912,
53.799308
],
[
-2.72511,
53.799825
],
[
-2.723549,
53.800014
],
[
-2.723489,
53.800024
],
[
-2.722564,
53.800137
],
[
-2.722277,
53.800175
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Sat, Jul 4, 2026 8:45 PM
- Record versioned
- Sun, Jul 5, 2026 1:29 AM
- Coordinate source
- Geometry
Driving on the M55? See every live closure, roadwork and planned restriction on this road.
M55 live closuresRelated incidents
M55 Eastbound Jct 1 Hardshoulder closure with TVRS and 50mph speed restriction (Mp 24/3 - 24/4)
Planned Roadworks National HighwaysExpected to clear in 5 days 4 hours
M55 Eastbound Jct 1 Hardshoulder closure with TVRS and 50mph speed restriction (Mp 24/3 - 24/4)
M55 Eastbound Jct 1 Lane 1 closure (23/3A to 24/3A)
Planned Roadworks National HighwaysStarts in 4 hours 46 minutes
M55 Eastbound Jct 1 Lane 1 closure (23/3A to 24/3A)
M55 Eastbound Jct 1 Lane 3/2 closure (Mp 23/1 - 24/9)
Cleared Roadworks National HighwaysCleared 10 hours 33 minutes ago
M55 Eastbound Jct 1 Lane 3/2 closure (Mp 23/1 - 24/9)
M6 northbound Jct 4/3/2 closure push to Jct 31 exit slip road closure (Mp 348/0 - 349/4)
Cleared Roadworks National HighwaysCleared 10 hours 13 minutes ago
M6 northbound Jct 4/3/2 closure push to Jct 31 exit slip road closure (Mp 348/0 - 349/4)
M55 Eastbound Jct 2 to 1 Lane 3/2 closure leading to carriageway closure Mp 23/1 - 24/0)
Cleared Roadworks National HighwaysCleared 2 days 16 hours ago
M55 Eastbound Jct 2 to 1 Lane 3/2 closure leading to carriageway closure Mp 23/1 - 24/0)
M55 eastbound Jct 3 to 1 Lane 3/2 closure (Mp 12/6 - 19/5)
Cleared Roadworks National HighwaysCleared 5 days 10 hours ago
M55 eastbound Jct 3 to 1 Lane 3/2 closure (Mp 12/6 - 19/5)