M55 eastbound Jct 2 to 1 hard shoulder closure (22/9A to 23/2A)
ClearedM55 eastbound Jct 2 to 1 hard shoulder closure (22/9A to 23/2A)
- Start time
- Sun, Jul 26, 2026 10:02 PM
- Expected end
- Tue, Jul 28, 2026 4:00 AM
- Duration
- 18 hours 43 minutes 2 seconds
- Road
- M55 – M55 Eastbound Between J2 And J1
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Sun, Jul 26, 2026 10:02 PM
- Last updated
- Mon, Jul 27, 2026 4:21 PM
- Cleared
- Mon, Jul 27, 2026 4:45 PM
- Latest update: M55 eastbound Jct 2 to 1 hard shoulder closure (22/9A to 23/2A)
- Coordinates
- 53.798664, -2.734202
- Latitude span
- 53.798410 – 53.798899
- Longitude span
- -2.736594 – -2.732127
- Bounding box centre
- 53.798655, -2.734361
- Location descriptions
-
- M55 eastbound between J2 and J1
- Feed validity status
- Active
- Overall feed start
- Sun, Jul 26, 2026 10:02 PM
- Overall feed end
- Tue, Jul 28, 2026 4:00 AM
- Feed window length
- 1 day 5 hours 58 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M55 eastbound between J2 and J1
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M55
- Linear Element Model
- The Network Model
- Linear Element Id
- {455A1EC6-2872-489A-A276-1AC389D1984F}
- Linear Element Type
- A Carriageway
- From Distance
- 1,467 m
- To Distance
- 1,684 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.79841 -2.736594 53.79844 -2.73629 53.79856 -2.735078 53.79875 -2.73335
Segment 2
3 coordinate pairs- Description
- M55 eastbound between J2 and J1
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M55
- Linear Element Model
- The Network Model
- Linear Element Id
- {32E88269-FAB3-487A-AF31-682CD19AD010}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 82 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.79875 -2.73335 53.798836 -2.732623 53.798899 -2.732127
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- -2.736594, 53.798410
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.736594,
53.79841
],
[
-2.73629,
53.79844
],
[
-2.735078,
53.79856
],
[
-2.73335,
53.79875
],
[
-2.73335,
53.79875
],
[
-2.732623,
53.798836
],
[
-2.732127,
53.798899
]
]
]
}
View road section coordinates
[
[
[
-2.736594,
53.79841
],
[
-2.73629,
53.79844
],
[
-2.735078,
53.79856
],
[
-2.73335,
53.79875
],
[
-2.73335,
53.79875
],
[
-2.732623,
53.798836
],
[
-2.732127,
53.798899
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Sun, Jul 26, 2026 10:02 PM
- Record versioned
- Mon, Jul 27, 2026 4:21 PM
- Coordinate source
- Geometry
Driving on the M55? See every live closure, roadwork and planned restriction on this road.
M55 live closuresRelated incidents
M6 Southbound Jct 32 Hardshoulder closure 357/1B to 24/7B M route)
Planned Roadworks National HighwaysExpected to clear in 1 week 2 days
M6 Southbound Jct 32 Hardshoulder closure 357/1B to 24/7B M route)
M6 Southbound Jct 32 to 31 Lane 3 closure (357/3B to 354/2B)
Cleared Roadworks National HighwaysCleared 1 hour 6 minutes ago
M6 Southbound Jct 32 to 31 Lane 3 closure (357/3B to 354/2B)
M55 Eastbound Jct 1 Lane 1/2 closure (MP 24/9)
Cleared Roadworks National HighwaysCleared 1 hour 6 minutes ago
M55 Eastbound Jct 1 Lane 1/2 closure (MP 24/9)
M55 Eastbound Jct 2 to 3 Lane 3/2 closure (Mp 16/5 - 18/3)
Cleared Roadworks National HighwaysCleared 2 hours 6 minutes ago
M55 Eastbound Jct 2 to 3 Lane 3/2 closure (Mp 16/5 - 18/3)
M55 eastbound J3 to J2 lane 3 and 2 closure (11/6A to 13/1A)
Cleared Roadworks National HighwaysExpected to clear in 7 hours 23 minutes
M55 eastbound J3 to J2 lane 3 and 2 closure (11/6A to 13/1A)
M6 Southbound Jct 32 to 31 Lane 3 closure (357/3B to 354/2B)
Cleared Roadworks National HighwaysCleared 21 hours 36 minutes ago
M6 Southbound Jct 32 to 31 Lane 3 closure (357/3B to 354/2B)