M55 Eastbound Jct 1 Hardshoulder closure with TVRS and 50mph speed restriction (Mp 24/3 - 24/4)
PlannedM55 Eastbound Jct 1 Hardshoulder closure with TVRS and 50mph speed restriction (Mp 24/3 - 24/4)
- Start time
- Mon, Jun 15, 2026 7:00 PM
- Expected end
- Mon, Jul 6, 2026 5:00 AM
- Duration
- 2 weeks 6 days 10 hours
- Road
- M55 – M55 Eastbound Within J1
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Sun, Jun 14, 2026 11:13 PM
- Last updated
- Mon, Jun 15, 2026 12:22 AM
- Cleared
- Mon, Jul 6, 2026 5:00 AM
- Latest update: M55 Eastbound Jct 1 Hardshoulder closure with TVRS and 50mph speed restriction (Mp 24/3 - 24/4)
- Coordinates
- 53.801074, -2.715774
- Latitude span
- 53.800895 – 53.801219
- Longitude span
- -2.716856 – -2.714932
- Bounding box centre
- 53.801057, -2.715894
- Location descriptions
-
- M55 eastbound within J1
- Feed validity status
- Planned
- Overall feed start
- Mon, Jun 15, 2026 7:00 PM
- Overall feed end
- Mon, Jul 6, 2026 5:00 AM
- Feed window length
- 2 weeks 6 days 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M55 eastbound within J1
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M55
- Linear Element Model
- The Network Model
- Linear Element Id
- {C21CEF21-9E32-42B4-862E-2A79ED5AC657}
- Linear Element Type
- A Carriageway
- From Distance
- 33 m
- To Distance
- 83 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.800895 -2.716856 53.800909 -2.716748 53.801011 -2.716127
Segment 2
5 coordinate pairs- Description
- M55 eastbound within J1
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M55
- Linear Element Model
- The Network Model
- Linear Element Id
- {00A69240-EBA9-4458-8744-B95DA3BB25E7}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 82 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
53.801011 -2.716127 53.801142 -2.715385 53.801188 -2.715082 53.801218 -2.714938 53.801219 -2.714932
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -2.716856, 53.800895
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.716856,
53.800895
],
[
-2.716748,
53.800909
],
[
-2.716127,
53.801011
],
[
-2.716127,
53.801011
],
[
-2.715385,
53.801142
],
[
-2.715082,
53.801188
],
[
-2.714938,
53.801218
],
[
-2.714932,
53.801219
]
]
]
}
View road section coordinates
[
[
[
-2.716856,
53.800895
],
[
-2.716748,
53.800909
],
[
-2.716127,
53.801011
],
[
-2.716127,
53.801011
],
[
-2.715385,
53.801142
],
[
-2.715082,
53.801188
],
[
-2.714938,
53.801218
],
[
-2.714932,
53.801219
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 4
- Record created
- Sun, Jun 14, 2026 11:13 PM
- Record versioned
- Mon, Jun 15, 2026 12:22 AM
- Coordinate source
- Geometry
Driving on the M55? See every live closure, roadwork and planned restriction on this road.
M55 live closuresRelated incidents
M55 Eastbound Jct 3 to 4 Lane 3 closure (7/0 to 11/5)
Cleared Roadworks National HighwaysCleared 1 hour 21 minutes ago
M55 Eastbound Jct 3 to 4 Lane 3 closure (7/0 to 11/5)
M55 Eastbound Jct 3 to 4 Lane 3 closure (7/0 to 11/5)
Cleared Roadworks National HighwaysCleared 3 hours 41 minutes ago
M55 Eastbound Jct 3 to 4 Lane 3 closure (7/0 to 11/5)
M6 Southbound Jct 31 to 30 Lane 1 closure (350/0B to 348/6B)
Cleared Roadworks National HighwaysCleared 1 day 6 hours ago
M6 Southbound Jct 31 to 30 Lane 1 closure (350/0B to 348/6B)
M6 Southbound Jct 31 to 30 Lane 1 closure (350/0B to 348/6B)
Cleared Roadworks National HighwaysCleared 1 day 56 minutes ago
M6 Southbound Jct 31 to 30 Lane 1 closure (350/0B to 348/6B)
M6 Southbound Junction 31A Entry slip road closure
Cleared Roadworks National HighwaysCleared 1 day 22 hours ago
M6 Southbound Junction 31A Entry slip road closure
M6 Southbound Junction 31A Entry slip road closure
Cleared Roadworks National HighwaysCleared 2 days 5 hours ago
M6 Southbound Junction 31A Entry slip road closure