M5 southbound Strensham services exit and entry slip road closure

Cleared

M5 southbound Strensham services exit and entry slip road closure

Start time
Fri, Oct 30, 2026 9:00 PM
Expected end
Sat, Oct 31, 2026 6:00 AM
Duration
2 seconds
Road
M5 – M5 Southbound At The Strensham Services Slip Road Between J7 And J8
Category
Construction Work
Direction
Southbound
Reason
Construction Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Fri, Oct 30, 2026 3:25 PM
Last updated
Fri, Oct 30, 2026 5:36 PM
Cleared
Fri, Oct 30, 2026 9:00 PM
  • Latest update: M5 southbound Strensham services exit and entry slip road closure
Coordinates
52.058882, -2.144291
Latitude span
52.058416 – 52.059747
Longitude span
-2.145922 – -2.143378
Bounding box centre
52.059082, -2.144650
Location descriptions
  • M5 southbound at the Strensham services slip road between J7 and J8
Feed validity status
Planned
Overall feed start
Fri, Oct 30, 2026 9:00 PM
Overall feed end
Sat, Oct 31, 2026 6:00 AM
Feed window length
9 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
carriagewayClosures (Carriageway Closures)
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

5 coordinate pairs
Description
M5 southbound at the Strensham services slip road between J7 and J8
Lanes Restricted
1 lane restricted
Operational Lanes
0 operational lanes
Direction On Section
South Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M5
Linear Element Model
The Network Model
Linear Element Id
{3A99F4FB-BF29-434C-8672-F5173BC32891}
Linear Element Type
A Carriageway Exit Slip
From Distance
0 m
To Distance
73 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
52.058833 -2.144209
52.058663 -2.143917
52.058546 -2.143698
52.058483 -2.143552
52.058416 -2.143378

Segment 2

4 coordinate pairs
Description
M5 southbound at the Strensham services slip road between J7 and J8
Lanes Restricted
1 lane restricted
Operational Lanes
0 operational lanes
Direction On Section
South Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M5
Linear Element Model
The Network Model
Linear Element Id
{1C88B48A-ECAA-4CB7-8FE2-C5E401C90B5E}
Linear Element Type
A Carriageway Exit Slip
From Distance
0 m
To Distance
155 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
52.059747 -2.145922
52.059433 -2.145276
52.058986 -2.144458
52.058833 -2.144209
Geometry type
MultiLineString
Geometry points
9
First coordinate pair
-2.144209, 52.058833
Road section segments
1
Road section points
9
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -2.144209,
                52.058833
            ],
            [
                -2.143917,
                52.058663
            ],
            [
                -2.143698,
                52.058546
            ],
            [
                -2.143552,
                52.058483
            ],
            [
                -2.143378,
                52.058416
            ],
            [
                -2.145922,
                52.059747
            ],
            [
                -2.145276,
                52.059433
            ],
            [
                -2.144458,
                52.058986
            ],
            [
                -2.144209,
                52.058833
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -2.144209,
            52.058833
        ],
        [
            -2.143917,
            52.058663
        ],
        [
            -2.143698,
            52.058546
        ],
        [
            -2.143552,
            52.058483
        ],
        [
            -2.143378,
            52.058416
        ],
        [
            -2.145922,
            52.059747
        ],
        [
            -2.145276,
            52.059433
        ],
        [
            -2.144458,
            52.058986
        ],
        [
            -2.144209,
            52.058833
        ]
    ]
]
Cause type
Construction Work
Detailed cause
Construction Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Carriageway Closures
Feed provider
National Highways
Data source
Roadworks
Feed version
12
Record created
Fri, Oct 30, 2026 3:25 PM
Record versioned
Fri, Oct 30, 2026 5:36 PM
Coordinate source
Geometry

Driving on the M5? See every live closure, roadwork and planned restriction on this road.

M5 live closures

Related incidents

A417 northbound from Burford Road to Air Balloon Roundabout Carriageway Closure (24/7)

Active Roadworks National Highways
Cotswolds A417 · A417 Northbound Between A419/A429 And A436

Expected to clear in 1 day 22 hours

Started 30 Oct 2026, 23:26 Expected clear 2 Nov 2026, 06:00

A417 northbound from Burford Road to Air Balloon Roundabout Carriageway Closure (24/7)

Category: Construction Work
View update

A417 southbound from Air Balloon Roundabout to Elkstone Carriageway Closure (24/7)

Active Roadworks National Highways
Cotswolds A417 · A417 Southbound At A Minor Junction Between A436 And A419/A429

Expected to clear in 1 day 22 hours

Started 30 Oct 2026, 23:24 Expected clear 2 Nov 2026, 06:00

A417 southbound from Air Balloon Roundabout to Elkstone Carriageway Closure (24/7)

Category: Construction Work
View update

M4 westbound Jct 20 exit slip road to M5 northbound Jct 15 - carriageway closed

Active Roadworks National Highways
South Gloucestershire M5 · Link Road From M4 Westbound J20 To M5 J15 Northbound

Expected to clear in 1 month 3 days

Started 11 Oct 2026, 21:41 Expected clear 5 Dec 2026, 06:00

M4 westbound Jct 20 exit slip road to M5 northbound Jct 15 - carriageway closed

Category: Road Maintenance
View update

M5 northbound lane 2/3 closure

Planned Roadworks National Highways
Bridgwater M5 · M5 Northbound Between J25 And J24

Starts in 12 hours 57 minutes

Starts 31 Oct 2026, 20:00 Expected clear 1 Nov 2026, 06:00

M5 northbound lane 2/3 closure

Category: Construction Work
View update

A417 southbound from Air Balloon Roundabout to Elkstone Carriageway Closure (24/7)

Cleared Roadworks National Highways
Cotswolds A417 · A417 Southbound At A Minor Junction Between A436 And A419/A429

Cleared 7 hours 37 minutes ago

Started 30 Oct 2026, 23:00 Ended 30 Oct 2026, 23:25

A417 southbound from Air Balloon Roundabout to Elkstone Carriageway Closure (24/7)

Category: Construction Work
View update

A417 northbound from Burford Road to Air Balloon Roundabout Carriageway Closure (24/7)

Cleared Roadworks National Highways
Cotswolds A417 · A417 Northbound Between A419/A429 And A436

Cleared 7 hours 2 minutes ago

Started 30 Oct 2026, 23:00 Ended 31 Oct 2026, 00:00

A417 northbound from Burford Road to Air Balloon Roundabout Carriageway Closure (24/7)

Category: Construction Work
View update