M5 southbound Jct 3 to Jct 4a carriageway closure
PlannedM5 southbound Jct 3 to Jct 4a carriageway closure
- Start time
- Fri, Oct 30, 2026 9:00 PM
- Expected end
- Sat, Oct 31, 2026 6:00 AM
- Duration
- 9 hours
- Road
- M5 – M5 Southbound At The Frankley Services Between J3 And J4 Exit
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Oct 22, 2026 11:44 AM
- Last updated
- Fri, Oct 30, 2026 4:08 AM
- Cleared
- Sat, Oct 31, 2026 6:00 AM
- Latest update: M5 southbound Jct 3 to Jct 4a carriageway closure
- Coordinates
- 52.431291, -2.017323
- Latitude span
- 52.430456 – 52.432790
- Longitude span
- -2.017422 – -2.017258
- Bounding box centre
- 52.431623, -2.017340
- Location descriptions
-
- M5 southbound at the Frankley services between J3 and J4 exit
- M5 southbound between J3 and J4
- Feed validity status
- Planned
- Overall feed start
- Fri, Oct 30, 2026 9:00 PM
- Overall feed end
- Sat, Oct 31, 2026 6:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M5 southbound at the Frankley services between J3 and J4 exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {D0568229-BD18-15EB-5710-AEF3A74B938D}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 35 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.430772 -2.017289 52.430743 -2.017287 52.430613 -2.017279 52.430492 -2.017264 52.430456 -2.017258
Segment 2
5 coordinate pairs- Description
- M5 southbound between J3 and J4
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {082D27CD-C8FA-4695-ADC8-9020FEC1F0AD}
- Linear Element Type
- A Carriageway
- From Distance
- 3 m
- To Distance
- 140 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.43279 -2.017354 52.432392 -2.01736 52.432131 -2.017364 52.431879 -2.017393 52.431564 -2.017422
Segment 3
6 coordinate pairs- Description
- M5 southbound at the Frankley services between J3 and J4 exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {18A7B7B9-B5EE-B20A-BD0D-8685EB269B46}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 92 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.431564 -2.017422 52.431499 -2.017297 52.431155 -2.017299 52.430988 -2.017295 52.430838 -2.017293 52.430772 -2.017289
- Geometry type
- MultiLineString
- Geometry points
- 16
- First coordinate pair
- -2.017289, 52.430772
- Road section segments
- 1
- Road section points
- 16
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.017289,
52.430772
],
[
-2.017287,
52.430743
],
[
-2.017279,
52.430613
],
[
-2.017264,
52.430492
],
[
-2.017258,
52.430456
],
[
-2.017354,
52.43279
],
[
-2.01736,
52.432392
],
[
-2.017364,
52.432131
],
[
-2.017393,
52.431879
],
[
-2.017422,
52.431564
],
[
-2.017422,
52.431564
],
[
-2.017297,
52.431499
],
[
-2.017299,
52.431155
],
[
-2.017295,
52.430988
],
[
-2.017293,
52.430838
],
[
-2.017289,
52.430772
]
]
]
}
View road section coordinates
[
[
[
-2.017289,
52.430772
],
[
-2.017287,
52.430743
],
[
-2.017279,
52.430613
],
[
-2.017264,
52.430492
],
[
-2.017258,
52.430456
],
[
-2.017354,
52.43279
],
[
-2.01736,
52.432392
],
[
-2.017364,
52.432131
],
[
-2.017393,
52.431879
],
[
-2.017422,
52.431564
],
[
-2.017422,
52.431564
],
[
-2.017297,
52.431499
],
[
-2.017299,
52.431155
],
[
-2.017295,
52.430988
],
[
-2.017293,
52.430838
],
[
-2.017289,
52.430772
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 3
- Record created
- Thu, Oct 22, 2026 11:44 AM
- Record versioned
- Fri, Oct 30, 2026 4:08 AM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
M5 northbound Jct 10 to 9 - hardshoulder closure (78/2 to 77/3)
Planned Roadworks National HighwaysExpected to clear in 1 month 2 weeks
M5 northbound Jct 10 to 9 - hardshoulder closure (78/2 to 77/3)
M5 southbound Jct 4a to M42 northbound link carriageway closure
Planned Roadworks National HighwaysStarts in 14 hours 3 minutes
M5 southbound Jct 4a to M42 northbound link carriageway closure
M5 northbound Western Arm northbound to M6 link road closure
Planned Roadworks National HighwaysStarts in 14 hours 3 minutes
M5 northbound Western Arm northbound to M6 link road closure
M5 southbound Jct 8 exit slip road closure
Planned Roadworks National HighwaysStarts in 14 hours 3 minutes
M5 southbound Jct 8 exit slip road closure
M5 northbound Jct 31 to Jct 30 carriageway closure
Planned Roadworks National HighwaysStarts in 13 hours 33 minutes
M5 northbound Jct 31 to Jct 30 carriageway closure
M5 Both Directions Jct 9 to Jct 15 mobile lane closures
Planned Roadworks National HighwaysStarts in 13 hours 3 minutes
M5 Both Directions Jct 9 to Jct 15 mobile lane closures