M5 southbound Jct 3 to Jct 4a carriageway closure
PlannedM5 southbound Jct 3 to Jct 4a carriageway closure
- Start time
- Mon, Oct 19, 2026 8:00 PM
- Expected end
- Tue, Oct 20, 2026 5:00 AM
- Duration
- 9 hours
- Road
- M5 – M5 Southbound Between J3 And J4
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Sat, Oct 17, 2026 2:13 AM
- Last updated
- Mon, Oct 19, 2026 3:58 AM
- Cleared
- Tue, Oct 20, 2026 5:00 AM
- Latest update: M5 southbound Jct 3 to Jct 4a carriageway closure
- Coordinates
- 52.431291, -2.017323
- Latitude span
- 52.430456 – 52.432790
- Longitude span
- -2.017422 – -2.017258
- Bounding box centre
- 52.431623, -2.017340
- Location descriptions
-
- M5 southbound between J3 and J4
- M5 southbound at the Frankley services between J3 and J4 exit
- Feed validity status
- Planned
- Overall feed start
- Mon, Oct 19, 2026 8:00 PM
- Overall feed end
- Tue, Oct 20, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M5 southbound between J3 and J4
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {082D27CD-C8FA-4695-ADC8-9020FEC1F0AD}
- Linear Element Type
- A Carriageway
- From Distance
- 3 m
- To Distance
- 140 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.43279 -2.017354 52.432392 -2.01736 52.432131 -2.017364 52.431879 -2.017393 52.431564 -2.017422
Segment 2
6 coordinate pairs- Description
- M5 southbound at the Frankley services between J3 and J4 exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {18A7B7B9-B5EE-B20A-BD0D-8685EB269B46}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 92 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.431564 -2.017422 52.431499 -2.017297 52.431155 -2.017299 52.430988 -2.017295 52.430838 -2.017293 52.430772 -2.017289
Segment 3
5 coordinate pairs- Description
- M5 southbound at the Frankley services between J3 and J4 exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {D0568229-BD18-15EB-5710-AEF3A74B938D}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 35 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.430772 -2.017289 52.430743 -2.017287 52.430613 -2.017279 52.430492 -2.017264 52.430456 -2.017258
- Geometry type
- MultiLineString
- Geometry points
- 16
- First coordinate pair
- -2.017354, 52.432790
- Road section segments
- 1
- Road section points
- 16
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.017354,
52.43279
],
[
-2.01736,
52.432392
],
[
-2.017364,
52.432131
],
[
-2.017393,
52.431879
],
[
-2.017422,
52.431564
],
[
-2.017422,
52.431564
],
[
-2.017297,
52.431499
],
[
-2.017299,
52.431155
],
[
-2.017295,
52.430988
],
[
-2.017293,
52.430838
],
[
-2.017289,
52.430772
],
[
-2.017289,
52.430772
],
[
-2.017287,
52.430743
],
[
-2.017279,
52.430613
],
[
-2.017264,
52.430492
],
[
-2.017258,
52.430456
]
]
]
}
View road section coordinates
[
[
[
-2.017354,
52.43279
],
[
-2.01736,
52.432392
],
[
-2.017364,
52.432131
],
[
-2.017393,
52.431879
],
[
-2.017422,
52.431564
],
[
-2.017422,
52.431564
],
[
-2.017297,
52.431499
],
[
-2.017299,
52.431155
],
[
-2.017295,
52.430988
],
[
-2.017293,
52.430838
],
[
-2.017289,
52.430772
],
[
-2.017289,
52.430772
],
[
-2.017287,
52.430743
],
[
-2.017279,
52.430613
],
[
-2.017264,
52.430492
],
[
-2.017258,
52.430456
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 3
- Record created
- Sat, Oct 17, 2026 2:13 AM
- Record versioned
- Mon, Oct 19, 2026 3:58 AM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
A417 both directions Brockworth roundabout - lane closure
Active Roadworks National HighwaysExpected to clear in 4 days 22 hours
A417 both directions Brockworth roundabout - lane closure
M4 westbound Jct 20 exit slip road to M5 northbound Jct 15 - carriageway closed
Active Roadworks National HighwaysExpected to clear in 1 month 2 weeks
M4 westbound Jct 20 exit slip road to M5 northbound Jct 15 - carriageway closed
M5 northbound Jct 10 to 9 - hardshoulder closure (78/2 to 76/6)
Active Roadworks National HighwaysExpected to clear in 1 month 4 weeks
M5 northbound Jct 10 to 9 - hardshoulder closure (78/2 to 76/6)
M5 northbound Jct 22 to Jct 21 narrow lanes (166/3 to 161/9)
Planned Roadworks National HighwaysExpected to clear in 3 years 2 weeks
M5 northbound Jct 22 to Jct 21 narrow lanes (166/3 to 161/9)
M5 northbound Jct 10 entry slip road closed
Planned Roadworks National HighwaysStarts in 13 hours 54 minutes
M5 northbound Jct 10 entry slip road closed
M5 northbound Western Arm northbound to M6 link road closure
Planned Roadworks National HighwaysStarts in 13 hours 54 minutes
M5 northbound Western Arm northbound to M6 link road closure