M5 southbound jct 21 to 22 hard shoulder closure
ClearedM5 southbound jct 21 to 22 hard shoulder closure
- Start time
- Tue, Aug 4, 2026 8:00 AM
- Expected end
- Tue, Aug 4, 2026 2:00 PM
- Duration
- 6 hours
- Road
- M5 – M5 Southbound Between J21 And J22
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jul 29, 2026 6:53 AM
- Last updated
- Tue, Aug 4, 2026 1:34 PM
- Cleared
- Tue, Aug 4, 2026 2:00 PM
- Latest update: M5 southbound jct 21 to 22 hard shoulder closure
- Coordinates
- 51.262457, -2.921575
- Latitude span
- 51.258818 – 51.265539
- Longitude span
- -2.922069 – -2.920668
- Bounding box centre
- 51.262179, -2.921369
- Location descriptions
-
- M5 southbound between J21 and J22
- Feed validity status
- Planned
- Overall feed start
- Tue, Aug 4, 2026 8:00 AM
- Overall feed end
- Tue, Aug 4, 2026 2:00 PM
- Feed window length
- 6 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- M5 southbound between J21 and J22
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {29DB5FE3-8A6C-4B23-9081-9889F06A62E3}
- Linear Element Type
- A Carriageway
- From Distance
- 104 m
- To Distance
- 364 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.265539 -2.922045 51.265387 -2.92206 51.265091 -2.922069 51.26456 -2.922058 51.264237 -2.922037 51.263518 -2.921937 51.263213 -2.921872
Segment 2
10 coordinate pairs- Description
- M5 southbound between J21 and J22
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {10999514-07C7-4ACE-B771-63BC526CCD8B}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 496 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.263213 -2.921872 51.262997 -2.921826 51.26289 -2.921797 51.261768 -2.921486 51.261275 -2.921342 51.260772 -2.921194 51.259929 -2.920955 51.259525 -2.92084 51.259031 -2.920715 51.258818 -2.920668
- Geometry type
- MultiLineString
- Geometry points
- 17
- First coordinate pair
- -2.922045, 51.265539
- Road section segments
- 1
- Road section points
- 17
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.922045,
51.265539
],
[
-2.92206,
51.265387
],
[
-2.922069,
51.265091
],
[
-2.922058,
51.26456
],
[
-2.922037,
51.264237
],
[
-2.921937,
51.263518
],
[
-2.921872,
51.263213
],
[
-2.921872,
51.263213
],
[
-2.921826,
51.262997
],
[
-2.921797,
51.26289
],
[
-2.921486,
51.261768
],
[
-2.921342,
51.261275
],
[
-2.921194,
51.260772
],
[
-2.920955,
51.259929
],
[
-2.92084,
51.259525
],
[
-2.920715,
51.259031
],
[
-2.920668,
51.258818
]
]
]
}
View road section coordinates
[
[
[
-2.922045,
51.265539
],
[
-2.92206,
51.265387
],
[
-2.922069,
51.265091
],
[
-2.922058,
51.26456
],
[
-2.922037,
51.264237
],
[
-2.921937,
51.263518
],
[
-2.921872,
51.263213
],
[
-2.921872,
51.263213
],
[
-2.921826,
51.262997
],
[
-2.921797,
51.26289
],
[
-2.921486,
51.261768
],
[
-2.921342,
51.261275
],
[
-2.921194,
51.260772
],
[
-2.920955,
51.259929
],
[
-2.92084,
51.259525
],
[
-2.920715,
51.259031
],
[
-2.920668,
51.258818
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Jul 29, 2026 6:53 AM
- Record versioned
- Tue, Aug 4, 2026 1:34 PM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
M5 northbound Jct 12 to Jct 11a hard shoulder closure 91/9-90/8
Planned Roadworks National HighwaysExpected to clear in 41 minutes 16 seconds
M5 northbound Jct 12 to Jct 11a hard shoulder closure 91/9-90/8
M5 northbound Jct 24 to 23 carriageway closure
Planned Roadworks National HighwaysStarts in 4 hours 41 minutes
M5 northbound Jct 24 to 23 carriageway closure
Lane closures 197/9B to 196/4B
Planned Roadworks National HighwaysStarts in 3 hours 41 minutes
lane closures 197/9B to 196/4B
M5 Jct 18a lane closure on slip road to M49
Planned Roadworks National HighwaysStarts in 3 hours 41 minutes
M5 Jct 18a lane closure on slip road to M49
Lane 3/2 closure
Planned Roadworks National HighwaysStarts in 3 hours 41 minutes
lane 3/2 closure
Lanes 2 and 3 closure northbound
Planned Roadworks National HighwaysStarts in 3 hours 41 minutes
Lanes 2 and 3 closure northbound