M5 northbound Jct 8 exit slip road closure
PlannedM5 northbound Jct 8 exit slip road closure
- Start time
- Fri, Aug 21, 2026 8:00 PM
- Expected end
- Sat, Aug 22, 2026 5:00 AM
- Duration
- 9 hours
- Road
- M5 – M5 J8 Northbound Exit
- Category
- Construction Work
- Direction
- Northbound
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Aug 21, 2026 12:29 AM
- Last updated
- Fri, Aug 21, 2026 2:50 AM
- Cleared
- Sat, Aug 22, 2026 5:00 AM
- Latest update: M5 northbound Jct 8 exit slip road closure
- Coordinates
- 52.045636, -2.134848
- Latitude span
- 52.043984 – 52.046821
- Longitude span
- -2.135809 – -2.133503
- Bounding box centre
- 52.045403, -2.134656
- Location descriptions
-
- M5 J8 northbound exit
- Feed validity status
- Planned
- Overall feed start
- Fri, Aug 21, 2026 8:00 PM
- Overall feed end
- Sat, Aug 22, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- M5 J8 northbound exit
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {EBC20CAF-26EC-4C2C-B916-BFEDAE1B997A}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 269 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.043984 -2.133503 52.044155 -2.133781 52.044181 -2.13381 52.045035 -2.13441 52.045457 -2.134732 52.046148 -2.135219
Segment 2
5 coordinate pairs- Description
- M5 J8 northbound exit
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {C399911F-394A-4EF6-889B-9667823AFE91}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 86 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.046148 -2.135219 52.04658 -2.135523 52.046715 -2.135626 52.046769 -2.135699 52.046821 -2.135809
- Geometry type
- MultiLineString
- Geometry points
- 11
- First coordinate pair
- -2.133503, 52.043984
- Road section segments
- 1
- Road section points
- 11
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.133503,
52.043984
],
[
-2.133781,
52.044155
],
[
-2.13381,
52.044181
],
[
-2.13441,
52.045035
],
[
-2.134732,
52.045457
],
[
-2.135219,
52.046148
],
[
-2.135219,
52.046148
],
[
-2.135523,
52.04658
],
[
-2.135626,
52.046715
],
[
-2.135699,
52.046769
],
[
-2.135809,
52.046821
]
]
]
}
View road section coordinates
[
[
[
-2.133503,
52.043984
],
[
-2.133781,
52.044155
],
[
-2.13381,
52.044181
],
[
-2.13441,
52.045035
],
[
-2.134732,
52.045457
],
[
-2.135219,
52.046148
],
[
-2.135219,
52.046148
],
[
-2.135523,
52.04658
],
[
-2.135626,
52.046715
],
[
-2.135699,
52.046769
],
[
-2.135809,
52.046821
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 4
- Record created
- Fri, Aug 21, 2026 12:29 AM
- Record versioned
- Fri, Aug 21, 2026 2:50 AM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
A417 Southbound from A46 Shurdington to Air Balloon Roundabout carriageway closure
Planned Roadworks National HighwaysStarts in 17 hours 18 minutes
A417 Southbound from A46 Shurdington to Air Balloon Roundabout carriageway closure
M5 Northbound Jct 31 to 30 lane 1,2 closure 261/8b - 259/2b
Planned Roadworks National HighwaysStarts in 14 hours 18 minutes
M5 Northbound Jct 31 to 30 lane 1,2 closure 261/8b - 259/2b
M5 Both Directions Jct 9 to Jct 15 mobile lane closures
Planned Roadworks National HighwaysStarts in 14 hours 18 minutes
M5 Both Directions Jct 9 to Jct 15 mobile lane closures
M5 Northbound Jct 31 to 30 - 24hr hardshoulder closure 261/4b - 259/4b
Planned Roadworks National HighwaysStarts in 18 minutes 7 seconds
M5 Northbound Jct 31 to 30 - 24hr hardshoulder closure 261/4b - 259/4b
M5 northbound Jct 21 to Jct 20 carriageway closure
Cleared Roadworks National HighwaysCleared 4 hours 11 minutes ago
M5 northbound Jct 21 to Jct 20 carriageway closure
M5 northbound to M6 northbound link arm closure
Cleared Roadworks National HighwaysCleared 41 minutes 51 seconds ago
M5 northbound to M6 northbound link arm closure