M5 northbound Jct 5 entry slip road closure
PlannedM5 northbound Jct 5 entry slip road closure
- Start time
- Tue, Aug 25, 2026 8:00 PM
- Expected end
- Wed, Aug 26, 2026 5:00 AM
- Duration
- 9 hours
- Road
- M5 – M5 J5 Northbound Access
- Category
- Construction Work
- Direction
- Northbound
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Jul 28, 2026 9:15 AM
- Last updated
- Mon, Aug 24, 2026 11:48 PM
- Cleared
- Wed, Aug 26, 2026 5:00 AM
- Latest update: M5 northbound Jct 5 entry slip road closure
- Coordinates
- 52.288424, -2.122190
- Latitude span
- 52.287096 – 52.290070
- Longitude span
- -2.122744 – -2.121254
- Bounding box centre
- 52.288583, -2.121999
- Location descriptions
-
- M5 J5 northbound access
- Feed validity status
- Planned
- Overall feed start
- Tue, Aug 25, 2026 8:00 PM
- Overall feed end
- Wed, Aug 26, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- M5 J5 northbound access
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {83346D8D-4743-456D-B16F-FF8EA26A9457}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 14 m
- To Distance
- 102 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.287096 -2.122027 52.287237 -2.122184 52.287417 -2.122331 52.287447 -2.122361 52.287659 -2.122567 52.28774 -2.122625 52.287784 -2.122662
Segment 2
19 coordinate pairs- Description
- M5 J5 northbound access
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {6AF9F24F-B19E-4131-3FD6-B798918DD78E}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 286 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.287784 -2.122662 52.287794 -2.12267 52.287875 -2.122699 52.288001 -2.122729 52.288091 -2.122744 52.288235 -2.122715 52.288342 -2.122686 52.288486 -2.122584 52.288639 -2.122437 52.288688 -2.122364 52.288765 -2.122247 52.288973 -2.121867 52.289171 -2.121603 52.289279 -2.121501 52.289432 -2.121399 52.289522 -2.12137 52.289665 -2.121326 52.289836 -2.121312 52.29007 -2.121254
- Geometry type
- MultiLineString
- Geometry points
- 26
- First coordinate pair
- -2.122027, 52.287096
- Road section segments
- 1
- Road section points
- 26
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.122027,
52.287096
],
[
-2.122184,
52.287237
],
[
-2.122331,
52.287417
],
[
-2.122361,
52.287447
],
[
-2.122567,
52.287659
],
[
-2.122625,
52.28774
],
[
-2.122662,
52.287784
],
[
-2.122662,
52.287784
],
[
-2.12267,
52.287794
],
[
-2.122699,
52.287875
],
[
-2.122729,
52.288001
],
[
-2.122744,
52.288091
],
[
-2.122715,
52.288235
],
[
-2.122686,
52.288342
],
[
-2.122584,
52.288486
],
[
-2.122437,
52.288639
],
[
-2.122364,
52.288688
],
[
-2.122247,
52.288765
],
[
-2.121867,
52.288973
],
[
-2.121603,
52.289171
],
[
-2.121501,
52.289279
],
[
-2.121399,
52.289432
],
[
-2.12137,
52.289522
],
[
-2.121326,
52.289665
],
[
-2.121312,
52.289836
],
[
-2.121254,
52.29007
]
]
]
}
View road section coordinates
[
[
[
-2.122027,
52.287096
],
[
-2.122184,
52.287237
],
[
-2.122331,
52.287417
],
[
-2.122361,
52.287447
],
[
-2.122567,
52.287659
],
[
-2.122625,
52.28774
],
[
-2.122662,
52.287784
],
[
-2.122662,
52.287784
],
[
-2.12267,
52.287794
],
[
-2.122699,
52.287875
],
[
-2.122729,
52.288001
],
[
-2.122744,
52.288091
],
[
-2.122715,
52.288235
],
[
-2.122686,
52.288342
],
[
-2.122584,
52.288486
],
[
-2.122437,
52.288639
],
[
-2.122364,
52.288688
],
[
-2.122247,
52.288765
],
[
-2.121867,
52.288973
],
[
-2.121603,
52.289171
],
[
-2.121501,
52.289279
],
[
-2.121399,
52.289432
],
[
-2.12137,
52.289522
],
[
-2.121326,
52.289665
],
[
-2.121312,
52.289836
],
[
-2.121254,
52.29007
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Tue, Jul 28, 2026 9:15 AM
- Record versioned
- Mon, Aug 24, 2026 11:48 PM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
M5 Northbound Jct 20 to 19 lane 1,2 leading to 3 closure
Planned Roadworks National HighwaysStarts in 19 hours 22 seconds
M5 Northbound Jct 20 to 19 lane 1,2 leading to 3 closure
Lanes closure northbound
Planned Roadworks National HighwaysStarts in 18 hours 22 seconds
Lanes closure northbound
Lanes 2 and 3 closure northbound
Planned Roadworks National HighwaysStarts in 18 hours 22 seconds
Lanes 2 and 3 closure northbound
M5 southbound Jct 20 to Jct 21 single lane running (160/4 to 167/4)
Planned Roadworks National HighwaysStarts in 18 hours 22 seconds
M5 southbound Jct 20 to Jct 21 single lane running (160/4 to 167/4)
M5 Both Directions Jct 9 to Jct 15 mobile lane closures
Planned Roadworks National HighwaysStarts in 17 hours 22 seconds
M5 Both Directions Jct 9 to Jct 15 mobile lane closures
Lane 2 and 3 closure northbound
Cleared Roadworks National HighwaysCleared 1 hour 34 minutes ago
Lane 2 and 3 closure northbound