M5 Northbound Jct 31 entry slip road carriageway closure
PlannedM5 Northbound Jct 31 entry slip road carriageway closure
- Start time
- Thu, Aug 20, 2026 7:00 PM
- Expected end
- Fri, Aug 21, 2026 5:00 AM
- Duration
- 10 hours
- Road
- M5 – Link Road From A30 Eastbound To M5 J31 Northbound
- Category
- Construction Work
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Aug 7, 2026 9:28 AM
- Last updated
- Thu, Aug 20, 2026 4:03 AM
- Cleared
- Fri, Aug 21, 2026 5:00 AM
- Latest update: M5 Northbound Jct 31 entry slip road carriageway closure
- Coordinates
- 50.682363, -3.516049
- Latitude span
- 50.680995 – 50.684410
- Longitude span
- -3.521678 – -3.509792
- Bounding box centre
- 50.682703, -3.515735
- Location descriptions
-
- link road from A30 eastbound to M5 J31 northbound
- A30 eastbound between A377 and M5/A38
- M5 northbound between J31 and J30
- Feed validity status
- Planned
- Overall feed start
- Thu, Aug 20, 2026 7:00 PM
- Overall feed end
- Fri, Aug 21, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
21 coordinate pairs- Description
- link road from A30 eastbound to M5 J31 northbound
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {6CBE4E54-01C4-45DC-AFDF-E535A6B7E1CF}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 370 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.682094 -3.518509 50.682067 -3.518452 50.681926 -3.518235 50.681829 -3.518104 50.681749 -3.518017 50.681581 -3.517827 50.681404 -3.517567 50.68129 -3.517365 50.681238 -3.51725 50.681194 -3.51715 50.68109 -3.516821 50.68104 -3.516578 50.681 -3.516167 50.680995 -3.515883 50.680997 -3.515714 50.681017 -3.515544 50.681112 -3.515123 50.681187 -3.514899 50.681206 -3.514843 50.681355 -3.514465 50.681467 -3.514115
Segment 2
13 coordinate pairs- Description
- A30 eastbound between A377 and M5/A38
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {ED756DE4-F92F-4896-BBB9-29489FDDD488}
- Linear Element Type
- B Carriageway
- From Distance
- 630 m
- To Distance
- 972 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.68441 -3.521678 50.684241 -3.52141 50.683977 -3.520991 50.683959 -3.520963 50.68373 -3.520601 50.683536 -3.520325 50.683218 -3.519862 50.683112 -3.519731 50.68257 -3.519036 50.682466 -3.518904 50.682369 -3.518797 50.682333 -3.518758 50.682094 -3.518509
Segment 3
9 coordinate pairs- Description
- M5 northbound between J31 and J30
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {3DC94503-E067-4BDA-A1F0-9867DC4A42E4}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 194 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.682918 -3.51184 50.682991 -3.511729 50.683313 -3.511216 50.683469 -3.510938 50.683626 -3.51066 50.683911 -3.510145 50.683994 -3.509978 50.684068 -3.509825 50.684083 -3.509792
Segment 4
5 coordinate pairs- Description
- M5 northbound between J31 and J30
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {11E9ACD0-FC03-4EA9-9042-F5E706B46913}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 227 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.681467 -3.514115 50.681541 -3.514018 50.681808 -3.513531 50.68245 -3.512553 50.682918 -3.51184
- Geometry type
- MultiLineString
- Geometry points
- 48
- First coordinate pair
- -3.518509, 50.682094
- Road section segments
- 1
- Road section points
- 48
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-3.518509,
50.682094
],
[
-3.518452,
50.682067
],
[
-3.518235,
50.681926
],
[
-3.518104,
50.681829
],
[
-3.518017,
50.681749
],
[
-3.517827,
50.681581
],
[
-3.517567,
50.681404
],
[
-3.517365,
50.68129
],
[
-3.51725,
50.681238
],
[
-3.51715,
50.681194
],
[
-3.516821,
50.68109
],
[
-3.516578,
50.68104
],
[
-3.516167,
50.681
],
[
-3.515883,
50.680995
],
[
-3.515714,
50.680997
],
[
-3.515544,
50.681017
],
[
-3.515123,
50.681112
],
[
-3.514899,
50.681187
],
[
-3.514843,
50.681206
],
[
-3.514465,
50.681355
],
[
-3.514115,
50.681467
],
[
-3.521678,
50.68441
],
[
-3.52141,
50.684241
],
[
-3.520991,
50.683977
],
[
-3.520963,
50.683959
],
[
-3.520601,
50.68373
],
[
-3.520325,
50.683536
],
[
-3.519862,
50.683218
],
[
-3.519731,
50.683112
],
[
-3.519036,
50.68257
],
[
-3.518904,
50.682466
],
[
-3.518797,
50.682369
],
[
-3.518758,
50.682333
],
[
-3.518509,
50.682094
],
[
-3.51184,
50.682918
],
[
-3.511729,
50.682991
],
[
-3.511216,
50.683313
],
[
-3.510938,
50.683469
],
[
-3.51066,
50.683626
],
[
-3.510145,
50.683911
],
[
-3.509978,
50.683994
],
[
-3.509825,
50.684068
],
[
-3.509792,
50.684083
],
[
-3.514115,
50.681467
],
[
-3.514018,
50.681541
],
[
-3.513531,
50.681808
],
[
-3.512553,
50.68245
],
[
-3.51184,
50.682918
]
]
]
}
View road section coordinates
[
[
[
-3.518509,
50.682094
],
[
-3.518452,
50.682067
],
[
-3.518235,
50.681926
],
[
-3.518104,
50.681829
],
[
-3.518017,
50.681749
],
[
-3.517827,
50.681581
],
[
-3.517567,
50.681404
],
[
-3.517365,
50.68129
],
[
-3.51725,
50.681238
],
[
-3.51715,
50.681194
],
[
-3.516821,
50.68109
],
[
-3.516578,
50.68104
],
[
-3.516167,
50.681
],
[
-3.515883,
50.680995
],
[
-3.515714,
50.680997
],
[
-3.515544,
50.681017
],
[
-3.515123,
50.681112
],
[
-3.514899,
50.681187
],
[
-3.514843,
50.681206
],
[
-3.514465,
50.681355
],
[
-3.514115,
50.681467
],
[
-3.521678,
50.68441
],
[
-3.52141,
50.684241
],
[
-3.520991,
50.683977
],
[
-3.520963,
50.683959
],
[
-3.520601,
50.68373
],
[
-3.520325,
50.683536
],
[
-3.519862,
50.683218
],
[
-3.519731,
50.683112
],
[
-3.519036,
50.68257
],
[
-3.518904,
50.682466
],
[
-3.518797,
50.682369
],
[
-3.518758,
50.682333
],
[
-3.518509,
50.682094
],
[
-3.51184,
50.682918
],
[
-3.511729,
50.682991
],
[
-3.511216,
50.683313
],
[
-3.510938,
50.683469
],
[
-3.51066,
50.683626
],
[
-3.510145,
50.683911
],
[
-3.509978,
50.683994
],
[
-3.509825,
50.684068
],
[
-3.509792,
50.684083
],
[
-3.514115,
50.681467
],
[
-3.514018,
50.681541
],
[
-3.513531,
50.681808
],
[
-3.512553,
50.68245
],
[
-3.51184,
50.682918
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Aug 7, 2026 9:28 AM
- Record versioned
- Thu, Aug 20, 2026 4:03 AM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
M5 northbound Jct 21 to Jct 20 single lane running (167/4 to 161/4)
Planned Roadworks National HighwaysExpected to clear in 26 minutes 23 seconds
M5 northbound Jct 21 to Jct 20 single lane running (167/4 to 161/4)
M5 northbound Jct 21 to Jct 20 carriageway closure
Planned Roadworks National HighwaysStarts in 16 hours 26 minutes
M5 northbound Jct 21 to Jct 20 carriageway closure
Lanes 2 and 3 closure northbound
Planned Roadworks National HighwaysStarts in 15 hours 26 minutes
Lanes 2 and 3 closure northbound
M5 northbound Jct 22 to Jct 21 lane 3&2 closure (166/5 to 165/2)
Planned Roadworks National HighwaysStarts in 15 hours 26 minutes
M5 northbound Jct 22 to Jct 21 lane 3&2 closure (166/5 to 165/2)
M5 Both Directions Jct 9 to Jct 15 mobile lane closures
Planned Roadworks National HighwaysStarts in 14 hours 26 minutes
M5 Both Directions Jct 9 to Jct 15 mobile lane closures
M5 Northbound Jct 31 to 30 lane 1,2 closure 261/8b - 259/2b
Planned Roadworks National HighwaysStarts in 14 hours 26 minutes
M5 Northbound Jct 31 to 30 lane 1,2 closure 261/8b - 259/2b