M5 northbound Jct 12 to 11A - hard shoulder closure (91/9 to 90/8)
ClearedM5 northbound Jct 12 to 11A - hard shoulder closure (91/9 to 90/8)
- Start time
- Mon, Oct 5, 2026 7:00 AM
- Expected end
- Mon, Oct 5, 2026 5:00 PM
- Duration
- 1 hour 45 minutes 1 second
- Road
- M5 – M5 Northbound Between J12 And J11A
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Sep 28, 2026 1:32 PM
- Last updated
- Mon, Oct 5, 2026 2:57 AM
- Cleared
- Mon, Oct 5, 2026 8:45 AM
- Latest update: M5 northbound Jct 12 to 11A - hard shoulder closure (91/9 to 90/8)
- Coordinates
- 51.824123, -2.217465
- Latitude span
- 51.821136 – 51.827572
- Longitude span
- -2.223021 – -2.211301
- Bounding box centre
- 51.824354, -2.217161
- Location descriptions
-
- M5 northbound between J12 and J11A
- M5 northbound at the Gloucester services between J12 and J11A
- Feed validity status
- Planned
- Overall feed start
- Mon, Oct 5, 2026 7:00 AM
- Overall feed end
- Mon, Oct 5, 2026 5:00 PM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
10 coordinate pairs- Description
- M5 northbound between J12 and J11A
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {8FE708F6-5E6F-430D-A8CA-89AD02EDF92F}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 737 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.823139 -2.219257 51.823274 -2.21901 51.823797 -2.218012 51.824426 -2.216862 51.825302 -2.215201 51.825915 -2.214086 51.826357 -2.213261 51.826916 -2.212321 51.82725 -2.2118 51.827572 -2.211301
Segment 2
3 coordinate pairs- Description
- M5 northbound between J12 and J11A
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {53E7B0E7-D7CC-44D2-A43E-4E2A212A069F}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 92 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.822597 -2.220284 51.822732 -2.220024 51.823139 -2.219257
Segment 3
4 coordinate pairs- Description
- M5 northbound at the Gloucester services between J12 and J11A
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {294C9BAE-6FD5-475E-A0AA-5D6BF7CB6428}
- Linear Element Type
- B Carriageway
- From Distance
- 753 m
- To Distance
- 1,001 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.821136 -2.223021 51.821586 -2.22218 51.822351 -2.220745 51.822597 -2.220284
- Geometry type
- MultiLineString
- Geometry points
- 17
- First coordinate pair
- -2.219257, 51.823139
- Road section segments
- 1
- Road section points
- 17
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.219257,
51.823139
],
[
-2.21901,
51.823274
],
[
-2.218012,
51.823797
],
[
-2.216862,
51.824426
],
[
-2.215201,
51.825302
],
[
-2.214086,
51.825915
],
[
-2.213261,
51.826357
],
[
-2.212321,
51.826916
],
[
-2.2118,
51.82725
],
[
-2.211301,
51.827572
],
[
-2.220284,
51.822597
],
[
-2.220024,
51.822732
],
[
-2.219257,
51.823139
],
[
-2.223021,
51.821136
],
[
-2.22218,
51.821586
],
[
-2.220745,
51.822351
],
[
-2.220284,
51.822597
]
]
]
}
View road section coordinates
[
[
[
-2.219257,
51.823139
],
[
-2.21901,
51.823274
],
[
-2.218012,
51.823797
],
[
-2.216862,
51.824426
],
[
-2.215201,
51.825302
],
[
-2.214086,
51.825915
],
[
-2.213261,
51.826357
],
[
-2.212321,
51.826916
],
[
-2.2118,
51.82725
],
[
-2.211301,
51.827572
],
[
-2.220284,
51.822597
],
[
-2.220024,
51.822732
],
[
-2.219257,
51.823139
],
[
-2.223021,
51.821136
],
[
-2.22218,
51.821586
],
[
-2.220745,
51.822351
],
[
-2.220284,
51.822597
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Sep 28, 2026 1:32 PM
- Record versioned
- Mon, Oct 5, 2026 2:57 AM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
M5 northbound Western Arm northbound to M6 link road closure
Planned Roadworks National HighwaysExpected to clear in 5 hours 18 minutes
M5 northbound Western Arm northbound to M6 link road closure
M5 both directions Jct 24 to Jct 23 - lane closure for for structure
Planned Roadworks National HighwaysExpected to clear in 5 hours 18 minutes
M5 both directions Jct 24 to Jct 23 - lane closure for for structure
M5 northbound Jct 22 to Jct 21 narrow lanes (166/3 to 161/9)
Planned Roadworks National HighwaysExpected to clear in 3 years 3 weeks
M5 northbound Jct 22 to Jct 21 narrow lanes (166/3 to 161/9)
M5 Northbound Jct 31 to 30 - 24hr hardshoulder closure 258/7b - 257/0b
Planned Roadworks National HighwaysExpected to clear in 1 week 6 days
M5 Northbound Jct 31 to 30 - 24hr hardshoulder closure 258/7b - 257/0b
M5 northbound Jct 10 entry slip road closed
Cleared Roadworks National HighwaysCleared 11 minutes 56 seconds ago
M5 northbound Jct 10 entry slip road closed
M5 northbound Jct 10 entry slip road closed
Cleared Roadworks National HighwaysCleared 3 hours 21 minutes ago
M5 northbound Jct 10 entry slip road closed