M5 northbound Jct 12 entry slip carriageway closure
ClearedM5 northbound Jct 12 entry slip carriageway closure
- Start time
- Fri, Jul 10, 2026 9:00 PM
- Expected end
- Sat, Jul 11, 2026 5:00 AM
- Duration
- 2 seconds
- Road
- M5 – M5 J12 Northbound Access
- Category
- Authority Operation
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Jul 10, 2026 3:39 AM
- Last updated
- Fri, Jul 10, 2026 11:55 AM
- Cleared
- Fri, Jul 10, 2026 9:00 PM
- Latest update: M5 northbound Jct 12 entry slip carriageway closure
- Coordinates
- 51.799837, -2.285923
- Latitude span
- 51.798942 – 51.800804
- Longitude span
- -2.288527 – -2.283099
- Bounding box centre
- 51.799873, -2.285813
- Location descriptions
-
- M5 J12 northbound access
- M5 northbound between J12 and J11A
- Feed validity status
- Planned
- Overall feed start
- Fri, Jul 10, 2026 9:00 PM
- Overall feed end
- Sat, Jul 11, 2026 5:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- M5 J12 northbound access
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {EA63A23B-6582-452F-8FD3-CDA8EFBD5508}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 6 m
- To Distance
- 341 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.798942 -2.288527 51.798959 -2.288455 51.799122 -2.287944 51.799318 -2.287419 51.799702 -2.286365 51.80006 -2.285347 51.800402 -2.284271
Segment 2
3 coordinate pairs- Description
- M5 northbound between J12 and J11A
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {BFC6AEB9-7BCA-4ECC-AEC5-26B66784853B}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 92 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.800402 -2.284271 51.800656 -2.283533 51.800804 -2.283099
- Geometry type
- MultiLineString
- Geometry points
- 10
- First coordinate pair
- -2.288527, 51.798942
- Road section segments
- 1
- Road section points
- 10
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.288527,
51.798942
],
[
-2.288455,
51.798959
],
[
-2.287944,
51.799122
],
[
-2.287419,
51.799318
],
[
-2.286365,
51.799702
],
[
-2.285347,
51.80006
],
[
-2.284271,
51.800402
],
[
-2.284271,
51.800402
],
[
-2.283533,
51.800656
],
[
-2.283099,
51.800804
]
]
]
}
View road section coordinates
[
[
[
-2.288527,
51.798942
],
[
-2.288455,
51.798959
],
[
-2.287944,
51.799122
],
[
-2.287419,
51.799318
],
[
-2.286365,
51.799702
],
[
-2.285347,
51.80006
],
[
-2.284271,
51.800402
],
[
-2.284271,
51.800402
],
[
-2.283533,
51.800656
],
[
-2.283099,
51.800804
]
]
]
- Cause type
- Authority Operation
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Jul 10, 2026 3:39 AM
- Record versioned
- Fri, Jul 10, 2026 11:55 AM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
M5 northbound Jct 17 slip road closed
Active Roadworks National HighwaysExpected to clear in 3 hours 37 minutes
M5 northbound Jct 17 slip road closed
Lane 3/2 closure
Planned Roadworks National HighwaysStarts in 18 hours 37 minutes
lane 3/2 closure
Lanes 2 and 3 closure northbound
Planned Roadworks National HighwaysStarts in 18 hours 37 minutes
Lanes 2 and 3 closure northbound
M5 Northbound lane 3 closure
Planned Roadworks National HighwaysStarts in 17 hours 37 minutes
M5 Northbound lane 3 closure
Lane 1 closure
Planned Roadworks National HighwaysStarts in 17 hours 37 minutes
lane 1 closure
M5 northbound Jct 24 to 23 carriageway closure
Cleared Roadworks National HighwaysCleared 4 hours 22 minutes ago
M5 northbound Jct 24 to 23 carriageway closure