M5 Jct 8 Exit slip road lane 1 closure northbound
ClearedM5 Jct 8 Exit slip road lane 1 closure northbound
- Start time
- Thu, May 14, 2026 8:00 PM
- Expected end
- Fri, May 15, 2026 5:00 AM
- Duration
- 9 hours
- Road
- M5 – M5 J8 Northbound Exit
- Category
- Road Maintenance
- Direction
- Northbound
- Lanes affected
- Lane 1 closed, 1 of 2 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, May 14, 2026 1:36 PM
- Last updated
- Thu, May 14, 2026 5:43 PM
- Cleared
- Fri, May 15, 2026 5:00 AM
- Latest update: M5 Jct 8 Exit slip road lane 1 closure northbound
- Coordinates
- 52.046069, -2.135176
- Latitude span
- 52.044947 – 52.046821
- Longitude span
- -2.135809 – -2.134349
- Bounding box centre
- 52.045884, -2.135079
- Location descriptions
-
- M5 J8 northbound exit
- Feed validity status
- Planned
- Overall feed start
- Thu, May 14, 2026 8:00 PM
- Overall feed end
- Fri, May 15, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M5 J8 northbound exit
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {EBC20CAF-26EC-4C2C-B916-BFEDAE1B997A}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 123 m
- To Distance
- 269 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.044947 -2.134349 52.045035 -2.13441 52.045457 -2.134732 52.046148 -2.135219
Segment 2
5 coordinate pairs- Description
- M5 J8 northbound exit
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M5
- Linear Element Model
- The Network Model
- Linear Element Id
- {C399911F-394A-4EF6-889B-9667823AFE91}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 86 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.046148 -2.135219 52.04658 -2.135523 52.046715 -2.135626 52.046769 -2.135699 52.046821 -2.135809
- Geometry type
- MultiLineString
- Geometry points
- 9
- First coordinate pair
- -2.134349, 52.044947
- Road section segments
- 1
- Road section points
- 9
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-2.134349,
52.044947
],
[
-2.13441,
52.045035
],
[
-2.134732,
52.045457
],
[
-2.135219,
52.046148
],
[
-2.135219,
52.046148
],
[
-2.135523,
52.04658
],
[
-2.135626,
52.046715
],
[
-2.135699,
52.046769
],
[
-2.135809,
52.046821
]
]
]
}
View road section coordinates
[
[
[
-2.134349,
52.044947
],
[
-2.13441,
52.045035
],
[
-2.134732,
52.045457
],
[
-2.135219,
52.046148
],
[
-2.135219,
52.046148
],
[
-2.135523,
52.04658
],
[
-2.135626,
52.046715
],
[
-2.135699,
52.046769
],
[
-2.135809,
52.046821
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 6
- Record created
- Thu, May 14, 2026 1:36 PM
- Record versioned
- Thu, May 14, 2026 5:43 PM
- Coordinate source
- Geometry
Driving on the M5? See every live closure, roadwork and planned restriction on this road.
M5 live closuresRelated incidents
Lane 2 and 3 closure northbound
Planned Roadworks National HighwaysStarts in 3 hours 40 minutes
Lane 2 and 3 closure northbound
Lane 1, 2 and 3 closure northbound
Planned Roadworks National HighwaysStarts in 3 hours 40 minutes
Lane 1, 2 and 3 closure northbound
Lanes 1 and 2 closure northbound
Cleared Roadworks National HighwaysCleared 11 hours 19 minutes ago
Lanes 1 and 2 closure northbound
Lane 2 and 3 closure northbound
Cleared Roadworks National HighwaysCleared 11 hours 19 minutes ago
Lane 2 and 3 closure northbound
M5 northbound Jct 16 exit slip - lane closure
Cleared Roadworks National HighwaysCleared 11 hours 19 minutes ago
M5 northbound Jct 16 exit slip - lane closure
Lanes 2, 3 and 4 closure northbound
Cleared Roadworks National HighwaysCleared 1 day 16 hours ago
Lanes 2, 3 and 4 closure northbound