M42 northbound Jct 2 entry slip road closure
PlannedM42 northbound Jct 2 entry slip road closure
- Start time
- Wed, Oct 21, 2026 8:00 PM
- Expected end
- Thu, Oct 22, 2026 5:00 AM
- Duration
- 9 hours
- Road
- M42 – M42 J2 Northbound Access
- Category
- Road Maintenance
- Direction
- Northbound
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Aug 21, 2026 4:13 PM
- Last updated
- Wed, Oct 21, 2026 4:21 AM
- Cleared
- Thu, Oct 22, 2026 5:00 AM
- Latest update: M42 northbound Jct 2 entry slip road closure
- Coordinates
- 52.362133, -1.946555
- Latitude span
- 52.361843 – 52.362316
- Longitude span
- -1.948137 – -1.943940
- Bounding box centre
- 52.362080, -1.946039
- Location descriptions
-
- M42 J2 northbound access
- Feed validity status
- Planned
- Overall feed start
- Wed, Oct 21, 2026 8:00 PM
- Overall feed end
- Thu, Oct 22, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M42 J2 northbound access
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M42
- Linear Element Model
- The Network Model
- Linear Element Id
- {2FE24A1F-E023-46F6-989D-2C36A1BF7B2A}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 195 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.36215 -1.946759 52.362093 -1.946054 52.362024 -1.945203 52.361988 -1.94495 52.361843 -1.94394
Segment 2
5 coordinate pairs- Description
- M42 J2 northbound access
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M42
- Linear Element Model
- The Network Model
- Linear Element Id
- {30719C9C-87D8-4786-975F-7170049DA17D}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 13 m
- To Distance
- 109 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.362316 -1.948137 52.362286 -1.948066 52.362259 -1.947934 52.362223 -1.947743 52.36215 -1.946759
- Geometry type
- MultiLineString
- Geometry points
- 10
- First coordinate pair
- -1.946759, 52.362150
- Road section segments
- 1
- Road section points
- 10
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.946759,
52.36215
],
[
-1.946054,
52.362093
],
[
-1.945203,
52.362024
],
[
-1.94495,
52.361988
],
[
-1.94394,
52.361843
],
[
-1.948137,
52.362316
],
[
-1.948066,
52.362286
],
[
-1.947934,
52.362259
],
[
-1.947743,
52.362223
],
[
-1.946759,
52.36215
]
]
]
}
View road section coordinates
[
[
[
-1.946759,
52.36215
],
[
-1.946054,
52.362093
],
[
-1.945203,
52.362024
],
[
-1.94495,
52.361988
],
[
-1.94394,
52.361843
],
[
-1.948137,
52.362316
],
[
-1.948066,
52.362286
],
[
-1.947934,
52.362259
],
[
-1.947743,
52.362223
],
[
-1.946759,
52.36215
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Aug 21, 2026 4:13 PM
- Record versioned
- Wed, Oct 21, 2026 4:21 AM
- Coordinate source
- Geometry
Driving on the M42? See every live closure, roadwork and planned restriction on this road.
M42 live closuresRelated incidents
M6 southbound Jct 6 to Jct 5 carriageway closure
Planned Roadworks National HighwaysStarts in 7 hours 42 minutes
M6 southbound Jct 6 to Jct 5 carriageway closure
M5 southbound Jct 3 to Jct 4a carriageway closure
Planned Roadworks National HighwaysStarts in 7 hours 42 minutes
M5 southbound Jct 3 to Jct 4a carriageway closure
M5 southbound Jct 4a to M42 northbound link carriageway closure
Planned Roadworks National HighwaysStarts in 7 hours 42 minutes
M5 southbound Jct 4a to M42 northbound link carriageway closure
M5 southbound Jct 3 to Jct 4a carriageway closure
Cleared Roadworks National HighwaysCleared 12 hours 37 minutes ago
M5 southbound Jct 3 to Jct 4a carriageway closure
M42 northbound Jct 2 entry slip road closure
Cleared Roadworks National HighwaysCleared 16 hours 17 minutes ago
M42 northbound Jct 2 entry slip road closure
M5 southbound Jct 3 to Jct 4a carriageway closure
Cleared Roadworks National HighwaysCleared 15 hours 12 minutes ago
M5 southbound Jct 3 to Jct 4a carriageway closure