M40 Southbound Jct 9 to Jct 8a, hardshoulder closure
PlannedM40 Southbound Jct 9 to Jct 8a, hardshoulder closure
- Start time
- Thu, Apr 16, 2026 6:00 AM
- Expected end
- Thu, Apr 16, 2026 10:59 PM
- Duration
- 16 hours 59 minutes
- Road
- M40 – M40 Southbound Between J9 And J8A
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jan 21, 2026 4:59 PM
- Last updated
- Thu, Apr 16, 2026 12:21 AM
- Cleared
- Thu, Apr 16, 2026 10:59 PM
- Latest update: M40 Southbound Jct 9 to Jct 8a, hardshoulder closure
- Coordinates
- 51.799250, -1.090675
- Latitude span
- 51.798157 – 51.800738
- Longitude span
- -1.091944 – -1.089743
- Bounding box centre
- 51.799448, -1.090844
- Location descriptions
-
- M40 southbound between J9 and J8A
- Feed validity status
- Planned
- Overall feed start
- Thu, Apr 16, 2026 6:00 AM
- Overall feed end
- Thu, Apr 16, 2026 10:59 PM
- Feed window length
- 16 hours 59 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M40 southbound between J9 and J8A
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {069BAF9D-3E86-48F3-905E-504DE543D400}
- Linear Element Type
- B Carriageway
- From Distance
- 1,131 m
- To Distance
- 1,355 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.800738 -1.091944 51.799536 -1.09092 51.799434 -1.090832 51.798964 -1.090431 51.798961 -1.090428
Segment 2
2 coordinate pairs- Description
- M40 southbound between J9 and J8A
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {D55AFE99-A0B4-4777-BC0E-1CC877C9BBEF}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 101 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.798961 -1.090428 51.798157 -1.089743
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- -1.091944, 51.800738
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.091944,
51.800738
],
[
-1.09092,
51.799536
],
[
-1.090832,
51.799434
],
[
-1.090431,
51.798964
],
[
-1.090428,
51.798961
],
[
-1.090428,
51.798961
],
[
-1.089743,
51.798157
]
]
]
}
View road section coordinates
[
[
[
-1.091944,
51.800738
],
[
-1.09092,
51.799536
],
[
-1.090832,
51.799434
],
[
-1.090431,
51.798964
],
[
-1.090428,
51.798961
],
[
-1.090428,
51.798961
],
[
-1.089743,
51.798157
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Jan 21, 2026 4:59 PM
- Record versioned
- Thu, Apr 16, 2026 12:21 AM
- Coordinate source
- Geometry
Related incidents
M40 Northbound Jct 8a to Jct 10 lane 3 closure.
Planned National HighwaysM40 Northbound Jct 8a to Jct 10 lane 3 closure.
M40 southbound, Jct 12 to Jct 10, lane 3 and 2 closure
Planned National HighwaysM40 southbound, Jct 12 to Jct 10, lane 3 and 2 closure
M40 Southbound Jct 7 to Jct 5 lane 3 and lane 2 closures
Planned National HighwaysM40 Southbound Jct 7 to Jct 5 lane 3 and lane 2 closures
M40 southbound, Jct 11 to Jct 10, lane 3 and 2 closure
Planned National HighwaysM40 southbound, Jct 11 to Jct 10, lane 3 and 2 closure
Lanes 2 and 3 closure southbound
Planned National HighwaysLanes 2 and 3 closure southbound
M40 Northbound Jct 4 to Jct 5 hard shoulder closure
Planned National HighwaysM40 Northbound Jct 4 to Jct 5 hard shoulder closure