M40 southbound Jct 8a exit slip road closure
ClearedM40 southbound Jct 8a exit slip road closure
- Start time
- Mon, Jun 8, 2026 9:15 PM
- Expected end
- Tue, Jun 9, 2026 5:00 AM
- Duration
- 7 hours 45 minutes
- Road
- M40 – M40 Southbound Between J9 And J8A
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Jun 8, 2026 8:29 AM
- Last updated
- Tue, Jun 9, 2026 2:34 AM
- Cleared
- Tue, Jun 9, 2026 5:00 AM
- Latest update: M40 southbound Jct 8a exit slip road closure
- Coordinates
- 51.742496, -1.097651
- Latitude span
- 51.740449 – 51.744479
- Longitude span
- -1.099987 – -1.094753
- Bounding box centre
- 51.742464, -1.097370
- Location descriptions
-
- M40 southbound between J9 and J8A
- M40 J8A southbound exit
- Feed validity status
- Planned
- Overall feed start
- Mon, Jun 8, 2026 9:15 PM
- Overall feed end
- Tue, Jun 9, 2026 5:00 AM
- Feed window length
- 7 hours 45 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M40 southbound between J9 and J8A
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {97230C1A-00BF-4E14-8292-1459280F31E6}
- Linear Element Type
- B Carriageway
- From Distance
- 1,104 m
- To Distance
- 1,234 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.744479 -1.099987 51.744416 -1.099932 51.743755 -1.099293 51.743483 -1.099009
Segment 2
8 coordinate pairs- Description
- M40 J8A southbound exit
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {1F5443A2-BDD5-4E0B-B7E9-D8112CB5C7E3}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 449 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.743483 -1.099009 51.743256 -1.098739 51.742058 -1.097328 51.741677 -1.096829 51.741559 -1.096643 51.740831 -1.095429 51.740505 -1.094861 51.740449 -1.094753
- Geometry type
- MultiLineString
- Geometry points
- 12
- First coordinate pair
- -1.099987, 51.744479
- Road section segments
- 1
- Road section points
- 12
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.099987,
51.744479
],
[
-1.099932,
51.744416
],
[
-1.099293,
51.743755
],
[
-1.099009,
51.743483
],
[
-1.099009,
51.743483
],
[
-1.098739,
51.743256
],
[
-1.097328,
51.742058
],
[
-1.096829,
51.741677
],
[
-1.096643,
51.741559
],
[
-1.095429,
51.740831
],
[
-1.094861,
51.740505
],
[
-1.094753,
51.740449
]
]
]
}
View road section coordinates
[
[
[
-1.099987,
51.744479
],
[
-1.099932,
51.744416
],
[
-1.099293,
51.743755
],
[
-1.099009,
51.743483
],
[
-1.099009,
51.743483
],
[
-1.098739,
51.743256
],
[
-1.097328,
51.742058
],
[
-1.096829,
51.741677
],
[
-1.096643,
51.741559
],
[
-1.095429,
51.740831
],
[
-1.094861,
51.740505
],
[
-1.094753,
51.740449
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Mon, Jun 8, 2026 8:29 AM
- Record versioned
- Tue, Jun 9, 2026 2:34 AM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
A404 Northbound entry slip road closure
Planned Roadworks National HighwaysStarts in 5 hours 37 minutes
A404 Northbound entry slip road closure
M40 Southbound Jct 6 to Jct 4 lane 2 and 3 closure
Planned Roadworks National HighwaysStarts in 4 hours 22 minutes
M40 Southbound Jct 6 to Jct 4 lane 2 and 3 closure
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
Planned Roadworks National HighwaysStarts in 4 hours 22 minutes
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
Cleared Roadworks National HighwaysCleared 10 hours 37 minutes ago
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
M40 Southbound Jct 5 to Jct 4 lane 3 and lane 2 closure
Cleared Roadworks National HighwaysCleared 12 hours 7 minutes ago
M40 Southbound Jct 5 to Jct 4 lane 3 and lane 2 closure
M40 Southbound, Jct 12 to Jct 11, lane 3 and 2 closure.
Cleared Roadworks National HighwaysCleared 15 hours 52 minutes ago
M40 Southbound, Jct 12 to Jct 11, lane 3 and 2 closure.