M40 Southbound Jct 8 to Jct 7 hard shoulder closure
ActiveM40 Southbound Jct 8 to Jct 7 hard shoulder closure
- Start time
- Wed, Aug 19, 2026 8:20 AM
- Expected end
- Fri, Aug 21, 2026 10:59 PM
- Duration
- 2 days 14 hours 39 minutes
- Road
- M40 – M40 Southbound Within J8A
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Aug 19, 2026 5:49 PM
- Last updated
- Thu, Aug 20, 2026 7:20 AM
- Cleared
- Fri, Aug 21, 2026 10:59 PM
- Latest update: M40 Southbound Jct 8 to Jct 7 hard shoulder closure
- Coordinates
- 51.744321, -1.099795
- Latitude span
- 51.743172 – 51.746114
- Longitude span
- -1.101380 – -1.098722
- Bounding box centre
- 51.744643, -1.100051
- Location descriptions
-
- M40 southbound within J8A
- M40 southbound between J9 and J8A
- Feed validity status
- Active
- Overall feed start
- Wed, Aug 19, 2026 8:20 AM
- Overall feed end
- Fri, Aug 21, 2026 10:59 PM
- Feed window length
- 2 days 14 hours 39 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M40 southbound within J8A
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {80128F11-2B65-42BA-B292-0393122F38CA}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 39 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.743483 -1.099009 51.743172 -1.098722
Segment 2
6 coordinate pairs- Description
- M40 southbound between J9 and J8A
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {97230C1A-00BF-4E14-8292-1459280F31E6}
- Linear Element Type
- B Carriageway
- From Distance
- 898 m
- To Distance
- 1,234 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.746114 -1.10138 51.745276 -1.100683 51.744871 -1.100329 51.744416 -1.099932 51.743755 -1.099293 51.743483 -1.099009
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -1.099009, 51.743483
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.099009,
51.743483
],
[
-1.098722,
51.743172
],
[
-1.10138,
51.746114
],
[
-1.100683,
51.745276
],
[
-1.100329,
51.744871
],
[
-1.099932,
51.744416
],
[
-1.099293,
51.743755
],
[
-1.099009,
51.743483
]
]
]
}
View road section coordinates
[
[
[
-1.099009,
51.743483
],
[
-1.098722,
51.743172
],
[
-1.10138,
51.746114
],
[
-1.100683,
51.745276
],
[
-1.100329,
51.744871
],
[
-1.099932,
51.744416
],
[
-1.099293,
51.743755
],
[
-1.099009,
51.743483
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Wed, Aug 19, 2026 5:49 PM
- Record versioned
- Thu, Aug 20, 2026 7:20 AM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Southbound Jct 11 to Jct 10 hard shoulder closure
Planned Roadworks National HighwaysExpected to clear in 8 hours 26 minutes
M40 Southbound Jct 11 to Jct 10 hard shoulder closure
M40 southbound Jct 9 exit slip road closure
Planned Roadworks National HighwaysStarts in 13 hours 41 minutes
M40 southbound Jct 9 exit slip road closure
M40 southbound Jct 10 to Jct 9 carriageway closure
Planned Roadworks National HighwaysStarts in 13 hours 41 minutes
M40 southbound Jct 10 to Jct 9 carriageway closure
M40 Southbound, Jct 16 to Jct 15, Lane 3 and 2 closure.
Planned Roadworks National HighwaysStarts in 13 hours 41 minutes
M40 Southbound, Jct 16 to Jct 15, Lane 3 and 2 closure.
M40 Southbound, Jct 9 to Jct 6 lane 3 and 2 closure
Planned Roadworks National HighwaysStarts in 13 hours 41 minutes
M40 Southbound, Jct 9 to Jct 6 lane 3 and 2 closure
M40 Westbound Jct 1a to M25 Clockwise and Anti-Clockwise Jct 16 Link Road Closure
Planned Roadworks National HighwaysStarts in 13 hours 26 minutes
M40 Westbound Jct 1a to M25 Clockwise and Anti-Clockwise Jct 16 Link Road Closure