M40 Southbound, Jct 5 to Jct 4 lane 3 closure
ClearedM40 Southbound, Jct 5 to Jct 4 lane 3 closure
- Start time
- Wed, Jul 29, 2026 9:15 PM
- Expected end
- Thu, Jul 30, 2026 5:00 AM
- Duration
- 7 hours 45 minutes
- Road
- M40 – M40 Southbound Between J5 And J4
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 3 closed, 1 of 3 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Jul 23, 2026 6:42 AM
- Last updated
- Thu, Jul 30, 2026 4:47 AM
- Cleared
- Thu, Jul 30, 2026 5:00 AM
- Latest update: M40 Southbound, Jct 5 to Jct 4 lane 3 closure
- Coordinates
- 51.626950, -0.850116
- Latitude span
- 51.626235 – 51.627233
- Longitude span
- -0.857363 – -0.844161
- Bounding box centre
- 51.626734, -0.850762
- Location descriptions
-
- M40 southbound between J5 and J4
- Feed validity status
- Planned
- Overall feed start
- Wed, Jul 29, 2026 9:15 PM
- Overall feed end
- Thu, Jul 30, 2026 5:00 AM
- Feed window length
- 7 hours 45 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M40 southbound between J5 and J4
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {EFE4E324-A782-4BD5-86BC-63C84A6E324B}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 166 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.626793 -0.846394 51.626633 -0.845661 51.626473 -0.845001 51.62625 -0.844212 51.626235 -0.844161
Segment 2
18 coordinate pairs- Description
- M40 southbound between J5 and J4
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {DF4BBAA7-7456-41C2-8AEF-22C4AA2F3A52}
- Linear Element Type
- B Carriageway
- From Distance
- 118 m
- To Distance
- 884 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.626965 -0.857363 51.626959 -0.856994 51.626959 -0.856055 51.626986 -0.855101 51.627041 -0.854276 51.62712 -0.853234 51.62719 -0.852105 51.627205 -0.851816 51.627221 -0.851541 51.627233 -0.850905 51.627227 -0.850341 51.627225 -0.850139 51.627191 -0.849389 51.627149 -0.848783 51.627099 -0.848279 51.626983 -0.847429 51.626925 -0.847084 51.626793 -0.846394
- Geometry type
- MultiLineString
- Geometry points
- 23
- First coordinate pair
- -0.846394, 51.626793
- Road section segments
- 1
- Road section points
- 23
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.846394,
51.626793
],
[
-0.845661,
51.626633
],
[
-0.845001,
51.626473
],
[
-0.844212,
51.62625
],
[
-0.844161,
51.626235
],
[
-0.857363,
51.626965
],
[
-0.856994,
51.626959
],
[
-0.856055,
51.626959
],
[
-0.855101,
51.626986
],
[
-0.854276,
51.627041
],
[
-0.853234,
51.62712
],
[
-0.852105,
51.62719
],
[
-0.851816,
51.627205
],
[
-0.851541,
51.627221
],
[
-0.850905,
51.627233
],
[
-0.850341,
51.627227
],
[
-0.850139,
51.627225
],
[
-0.849389,
51.627191
],
[
-0.848783,
51.627149
],
[
-0.848279,
51.627099
],
[
-0.847429,
51.626983
],
[
-0.847084,
51.626925
],
[
-0.846394,
51.626793
]
]
]
}
View road section coordinates
[
[
[
-0.846394,
51.626793
],
[
-0.845661,
51.626633
],
[
-0.845001,
51.626473
],
[
-0.844212,
51.62625
],
[
-0.844161,
51.626235
],
[
-0.857363,
51.626965
],
[
-0.856994,
51.626959
],
[
-0.856055,
51.626959
],
[
-0.855101,
51.626986
],
[
-0.854276,
51.627041
],
[
-0.853234,
51.62712
],
[
-0.852105,
51.62719
],
[
-0.851816,
51.627205
],
[
-0.851541,
51.627221
],
[
-0.850905,
51.627233
],
[
-0.850341,
51.627227
],
[
-0.850139,
51.627225
],
[
-0.849389,
51.627191
],
[
-0.848783,
51.627149
],
[
-0.848279,
51.627099
],
[
-0.847429,
51.626983
],
[
-0.847084,
51.626925
],
[
-0.846394,
51.626793
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Thu, Jul 23, 2026 6:42 AM
- Record versioned
- Thu, Jul 30, 2026 4:47 AM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Southbound Jct 14 to Jct 13 hardshoulder closure.
Active Roadworks National HighwaysExpected to clear in 2 days 5 hours
M40 Southbound Jct 14 to Jct 13 hardshoulder closure.
M40 Southbound, Jct 8a exit slip road lane one closure
Planned Roadworks National HighwaysExpected to clear in 36 minutes 20 seconds
M40 Southbound, Jct 8a exit slip road lane one closure
M40 Southbound, Jct 9 to Jct 8a, hard shoulder closure.
Planned Roadworks National HighwaysExpected to clear in 1 day 5 hours
M40 Southbound, Jct 9 to Jct 8a, hard shoulder closure.
M40 Southbound Jct 5 to Jct 4 lane 3 closure
Planned Roadworks National HighwaysStarts in 3 hours 51 minutes
M40 Southbound Jct 5 to Jct 4 lane 3 closure
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
Planned Roadworks National HighwaysStarts in 3 hours 51 minutes
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
M40 northbound, Jct 5 exit slip road closure
Planned Roadworks National HighwaysStarts in 3 hours 51 minutes
M40 northbound, Jct 5 exit slip road closure