M40 Southbound, Jct 5 to Jct 4, hard shoulder closure.

Planned

M40 Southbound, Jct 5 to Jct 4, hard shoulder closure.

Start time
Tue, Aug 25, 2026 6:00 AM
Expected end
Tue, Aug 25, 2026 6:00 PM
Duration
12 hours
Road
M40 – M40 Southbound Between J5 And J4
Category
Road Maintenance
Direction
Southbound
Carriageway
Dual Carriageway
Reason
Tree And Vegetation Cutting Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Thu, Aug 13, 2026 11:41 AM
Last updated
Tue, Aug 25, 2026 2:51 AM
Cleared
Tue, Aug 25, 2026 6:00 PM
  • Latest update: M40 Southbound, Jct 5 to Jct 4, hard shoulder closure.
Coordinates
51.627285, -0.861105
Latitude span
51.627011 – 51.627746
Longitude span
-0.864109 – -0.858748
Bounding box centre
51.627379, -0.861429
Location descriptions
  • M40 southbound between J5 and J4
Feed validity status
Planned
Overall feed start
Tue, Aug 25, 2026 6:00 AM
Overall feed end
Tue, Aug 25, 2026 6:00 PM
Feed window length
12 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

6 coordinate pairs
Description
M40 southbound between J5 and J4
Carriageway
Dual Carriageway
Lane Usage
Lh
Lane Number
0
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
0 lanes restricted
Operational Lanes
4 operational lanes
Direction On Section
South Bound
Direction Relative
Aligned
Height Grade
Start2 End1
Linear Element Road
M40
Linear Element Model
The Network Model
Linear Element Id
{7624A3E8-B2EE-45F0-B73E-A45247075BBC}
Linear Element Type
B Carriageway
From Distance
192 m
To Distance
551 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.627746 -0.864109
51.627729 -0.864039
51.62735 -0.862055
51.627244 -0.861306
51.627146 -0.860456
51.627028 -0.859065

Segment 2

2 coordinate pairs
Description
M40 southbound between J5 and J4
Carriageway
Dual Carriageway
Lane Usage
Lh
Lane Number
0
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
0 lanes restricted
Operational Lanes
4 operational lanes
Direction On Section
South Bound
Direction Relative
Aligned
Height Grade
Start1 End2
Linear Element Road
M40
Linear Element Model
The Network Model
Linear Element Id
{DF4BBAA7-7456-41C2-8AEF-22C4AA2F3A52}
Linear Element Type
B Carriageway
From Distance
0 m
To Distance
22 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.627028 -0.859065
51.627011 -0.858748
Geometry type
MultiLineString
Geometry points
8
First coordinate pair
-0.864109, 51.627746
Road section segments
1
Road section points
8
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -0.864109,
                51.627746
            ],
            [
                -0.864039,
                51.627729
            ],
            [
                -0.862055,
                51.62735
            ],
            [
                -0.861306,
                51.627244
            ],
            [
                -0.860456,
                51.627146
            ],
            [
                -0.859065,
                51.627028
            ],
            [
                -0.859065,
                51.627028
            ],
            [
                -0.858748,
                51.627011
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -0.864109,
            51.627746
        ],
        [
            -0.864039,
            51.627729
        ],
        [
            -0.862055,
            51.62735
        ],
        [
            -0.861306,
            51.627244
        ],
        [
            -0.860456,
            51.627146
        ],
        [
            -0.859065,
            51.627028
        ],
        [
            -0.859065,
            51.627028
        ],
        [
            -0.858748,
            51.627011
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Tree And Vegetation Cutting Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Other
Feed provider
National Highways
Data source
Roadworks
Feed version
2
Record created
Thu, Aug 13, 2026 11:41 AM
Record versioned
Tue, Aug 25, 2026 2:51 AM
Coordinate source
Geometry

Driving on the M40? See every live closure, roadwork and planned restriction on this road.

M40 live closures

Related incidents

M40 Southbound Jct 12 to Jct 11 lane 3 closure

Planned Roadworks National Highways
Stratford-Upon-Avon M40 · M40 Southbound Between J12 And J11

Expected to clear in 1 hour 51 minutes

Started 24 Aug 2026, 20:00 Expected clear 25 Aug 2026, 05:00

M40 Southbound Jct 12 to Jct 11 lane 3 closure

Category: Road Maintenance
View update

M40 Jct 4 roundabout lane 1 closure

Planned Roadworks National Highways
Wycombe A404 · Roundabout At M40 J4/A404

Expected to clear in 1 hour 51 minutes

Started 24 Aug 2026, 20:00 Expected clear 25 Aug 2026, 05:00

M40 Jct 4 roundabout lane 1 closure

Category: Road Maintenance
View update

M40 northbound, Jct 11 entry slip road, lane 1 closure

Planned Roadworks National Highways
Bicester M40 · M40 J11 Northbound Access

Expected to clear in 1 hour 51 minutes

Started 24 Aug 2026, 19:00 Expected clear 25 Aug 2026, 05:00

M40 northbound, Jct 11 entry slip road, lane 1 closure

Category: Road Maintenance
View update

M40 Northbound Jct 8a exit slip road closure

Planned Roadworks National Highways
Benson M40 · M40 J8 Northbound Exit

Starts in 18 hours 6 minutes

Starts 25 Aug 2026, 21:15 Expected clear 26 Aug 2026, 05:00

M40 Northbound Jct 8a exit slip road closure

Category: Road Maintenance
View update

M40 Southbound, Jct 9 to Jct 6 lane 3 and 2 closure

Planned Roadworks National Highways
Bicester M40 · M40 Southbound Within J8A

Starts in 18 hours 6 minutes

Starts 25 Aug 2026, 21:15 Expected clear 26 Aug 2026, 05:00

M40 Southbound, Jct 9 to Jct 6 lane 3 and 2 closure

Category: Construction Work
View update

M40 Eastbound Jct 2 to Jct 1 lane closure

Planned Roadworks National Highways
South Bucks M40 · Link Road From M40 J1A Southbound To M25 J16

Starts in 17 hours 51 minutes

Starts 25 Aug 2026, 21:00 Expected clear 26 Aug 2026, 04:30

M40 Eastbound Jct 2 to Jct 1 lane closure

Category: Road Maintenance
View update