M40 Southbound, Jct 5 lane 1 closure on entry slip road
ClearedM40 Southbound, Jct 5 lane 1 closure on entry slip road
- Start time
- Thu, Aug 13, 2026 8:00 PM
- Expected end
- Fri, Aug 14, 2026 5:00 AM
- Duration
- 5 hours 40 minutes 2 seconds
- Road
- M40 – M40 Southbound Between J5 And J4
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jul 29, 2026 4:10 PM
- Last updated
- Fri, Aug 14, 2026 1:19 AM
- Cleared
- Fri, Aug 14, 2026 1:40 AM
- Latest update: M40 Southbound, Jct 5 lane 1 closure on entry slip road
- Coordinates
- 51.659627, -0.908562
- Latitude span
- 51.658078 – 51.660983
- Longitude span
- -0.912291 – -0.903916
- Bounding box centre
- 51.659531, -0.908104
- Location descriptions
-
- M40 southbound between J5 and J4
- M40 J5 southbound access
- M40 J5 southbound exit
- Feed validity status
- Planned
- Overall feed start
- Thu, Aug 13, 2026 8:00 PM
- Overall feed end
- Fri, Aug 14, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M40 southbound between J5 and J4
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {78BD5207-76B6-4C51-AE59-D59BA8BA8DFB}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 161 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.658737 -0.906002 51.65866 -0.905725 51.658419 -0.904936 51.658299 -0.904534 51.658078 -0.903916
Segment 2
6 coordinate pairs- Description
- M40 J5 southbound access
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {BD5CA716-747C-46D2-B527-F44088858FDD}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 480 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.660779 -0.912122 51.660316 -0.91063 51.660029 -0.909755 51.659788 -0.909057 51.659031 -0.906858 51.658737 -0.906002
Segment 3
4 coordinate pairs- Description
- M40 J5 southbound exit
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {8F80F15B-7CA9-439A-9A58-299663D429E7}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 20 m
- To Distance
- 46 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.660983 -0.912291 51.660915 -0.912263 51.660852 -0.912222 51.660779 -0.912122
- Geometry type
- MultiLineString
- Geometry points
- 15
- First coordinate pair
- -0.906002, 51.658737
- Road section segments
- 1
- Road section points
- 15
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.906002,
51.658737
],
[
-0.905725,
51.65866
],
[
-0.904936,
51.658419
],
[
-0.904534,
51.658299
],
[
-0.903916,
51.658078
],
[
-0.912122,
51.660779
],
[
-0.91063,
51.660316
],
[
-0.909755,
51.660029
],
[
-0.909057,
51.659788
],
[
-0.906858,
51.659031
],
[
-0.906002,
51.658737
],
[
-0.912291,
51.660983
],
[
-0.912263,
51.660915
],
[
-0.912222,
51.660852
],
[
-0.912122,
51.660779
]
]
]
}
View road section coordinates
[
[
[
-0.906002,
51.658737
],
[
-0.905725,
51.65866
],
[
-0.904936,
51.658419
],
[
-0.904534,
51.658299
],
[
-0.903916,
51.658078
],
[
-0.912122,
51.660779
],
[
-0.91063,
51.660316
],
[
-0.909755,
51.660029
],
[
-0.909057,
51.659788
],
[
-0.906858,
51.659031
],
[
-0.906002,
51.658737
],
[
-0.912291,
51.660983
],
[
-0.912263,
51.660915
],
[
-0.912222,
51.660852
],
[
-0.912122,
51.660779
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 4
- Record created
- Wed, Jul 29, 2026 4:10 PM
- Record versioned
- Fri, Aug 14, 2026 1:19 AM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Southbound Jct 5 to Jct 4 hardshoulder closure
Planned Roadworks National HighwaysExpected to clear in 3 days 20 hours
M40 Southbound Jct 5 to Jct 4 hardshoulder closure
M40 Southbound Jct 4 to Jct 2 lane 1 closure
Planned Roadworks National HighwaysStarts in 18 hours 45 minutes
M40 Southbound Jct 4 to Jct 2 lane 1 closure
M40 Northbound Jct 14, entry slip road closure
Planned Roadworks National HighwaysStarts in 18 hours 45 minutes
M40 Northbound Jct 14, entry slip road closure
M40 Southbound, Jct 11 to Jct 10, hard shoulder, lane 1 and 2 closure.
Planned Roadworks National HighwaysStarts in 17 hours 30 minutes
M40 Southbound, Jct 11 to Jct 10, hard shoulder, lane 1 and 2 closure.
M40 Southbound, Jct 7 to Jct 6, lane 1 and 2 closure.
Planned Roadworks National HighwaysStarts in 17 hours 30 minutes
M40 Southbound, Jct 7 to Jct 6, lane 1 and 2 closure.
M40 Southbound, Jct 11 to Jct 12 lane 2 and 3 closure
Planned Roadworks National HighwaysStarts in 17 hours 30 minutes
M40 Southbound, Jct 11 to Jct 12 lane 2 and 3 closure