M40 Southbound, Jct 5 entry slip road closure
ClearedM40 Southbound, Jct 5 entry slip road closure
- Start time
- Fri, Apr 24, 2026 9:15 PM
- Expected end
- Sat, Apr 25, 2026 5:00 AM
- Duration
- 7 hours 45 minutes
- Road
- M40 – M40 J5 Southbound Access
- Category
- Construction Work
- Direction
- Southbound
- Reason
- Road Improvement Or Upgrading
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Apr 3, 2026 3:51 PM
- Last updated
- Sat, Apr 25, 2026 2:34 AM
- Cleared
- Sat, Apr 25, 2026 5:00 AM
- Latest update: M40 Southbound, Jct 5 entry slip road closure
- Coordinates
- 51.660221, -0.910332
- Latitude span
- 51.658737 – 51.660983
- Longitude span
- -0.912291 – -0.906002
- Bounding box centre
- 51.659860, -0.909147
- Location descriptions
-
- M40 J5 southbound access
- M40 J5 southbound exit
- Feed validity status
- Planned
- Overall feed start
- Fri, Apr 24, 2026 9:15 PM
- Overall feed end
- Sat, Apr 25, 2026 5:00 AM
- Feed window length
- 7 hours 45 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- M40 J5 southbound access
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {BD5CA716-747C-46D2-B527-F44088858FDD}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 480 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.660779 -0.912122 51.660316 -0.91063 51.660029 -0.909755 51.659788 -0.909057 51.659031 -0.906858 51.658737 -0.906002
Segment 2
4 coordinate pairs- Description
- M40 J5 southbound exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {8F80F15B-7CA9-439A-9A58-299663D429E7}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 20 m
- To Distance
- 46 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.660983 -0.912291 51.660915 -0.912263 51.660852 -0.912222 51.660779 -0.912122
- Geometry type
- MultiLineString
- Geometry points
- 10
- First coordinate pair
- -0.912122, 51.660779
- Road section segments
- 1
- Road section points
- 10
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.912122,
51.660779
],
[
-0.91063,
51.660316
],
[
-0.909755,
51.660029
],
[
-0.909057,
51.659788
],
[
-0.906858,
51.659031
],
[
-0.906002,
51.658737
],
[
-0.912291,
51.660983
],
[
-0.912263,
51.660915
],
[
-0.912222,
51.660852
],
[
-0.912122,
51.660779
]
]
]
}
View road section coordinates
[
[
[
-0.912122,
51.660779
],
[
-0.91063,
51.660316
],
[
-0.909755,
51.660029
],
[
-0.909057,
51.659788
],
[
-0.906858,
51.659031
],
[
-0.906002,
51.658737
],
[
-0.912291,
51.660983
],
[
-0.912263,
51.660915
],
[
-0.912222,
51.660852
],
[
-0.912122,
51.660779
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Road Improvement Or Upgrading
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Apr 3, 2026 3:51 PM
- Record versioned
- Sat, Apr 25, 2026 2:34 AM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
Active Roadworks National HighwaysExpected to clear in 14 hours 58 minutes
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
M40 northbound Warwick services entry slip road closure
Planned Roadworks National HighwaysStarts in 13 hours 14 minutes
M40 northbound Warwick services entry slip road closure
M40 Southbound Jct 15 to Jct 11 lane 3 closure
Planned Roadworks National HighwaysStarts in 13 hours 14 minutes
M40 Southbound Jct 15 to Jct 11 lane 3 closure
M40 northbound Jct 10 entry slip road closure
Planned Roadworks National HighwaysStarts in 13 hours 14 minutes
M40 northbound Jct 10 entry slip road closure
M40 Southbound Jct 5, lane 3 and lane 2 closures
Planned Roadworks National HighwaysStarts in 13 hours 14 minutes
M40 Southbound Jct 5, lane 3 and lane 2 closures
M40 Southbound Jct 4 to Jct 2 lane 3 closure
Planned Roadworks National HighwaysStarts in 13 hours 14 minutes
M40 Southbound Jct 4 to Jct 2 lane 3 closure