M40 Southbound Jct 4 exit slip road closure
ClearedM40 Southbound Jct 4 exit slip road closure
- Start time
- Sun, Jul 26, 2026 9:15 PM
- Expected end
- Mon, Jul 27, 2026 5:00 AM
- Duration
- 5 hours 50 minutes 2 seconds
- Road
- M40 – M40 J4 Southbound Exit
- Category
- Road Maintenance
- Direction
- Southbound
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Jul 3, 2026 3:40 PM
- Last updated
- Mon, Jul 27, 2026 12:34 AM
- Cleared
- Mon, Jul 27, 2026 3:05 AM
- Latest update: M40 Southbound Jct 4 exit slip road closure
- Coordinates
- 51.612549, -0.769871
- Latitude span
- 51.612422 – 51.612739
- Longitude span
- -0.770119 – -0.769592
- Bounding box centre
- 51.612581, -0.769856
- Location descriptions
-
- M40 J4 southbound exit
- Feed validity status
- Planned
- Overall feed start
- Sun, Jul 26, 2026 9:15 PM
- Overall feed end
- Mon, Jul 27, 2026 5:00 AM
- Feed window length
- 7 hours 45 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M40 J4 southbound exit
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {DCA8F35E-48F2-4A8B-8AAE-2A57CB7C967B}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 44 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.612458 -0.770025 51.612564 -0.769797 51.612654 -0.769665 51.612739 -0.769592
Segment 2
2 coordinate pairs- Description
- M40 J4 southbound exit
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {BF5C6AB8-5941-4E82-BAA5-0172908D626F}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 390 m
- To Distance
- 398 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.612422 -0.770119 51.612458 -0.770025
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- -0.770025, 51.612458
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.770025,
51.612458
],
[
-0.769797,
51.612564
],
[
-0.769665,
51.612654
],
[
-0.769592,
51.612739
],
[
-0.770119,
51.612422
],
[
-0.770025,
51.612458
]
]
]
}
View road section coordinates
[
[
[
-0.770025,
51.612458
],
[
-0.769797,
51.612564
],
[
-0.769665,
51.612654
],
[
-0.769592,
51.612739
],
[
-0.770119,
51.612422
],
[
-0.770025,
51.612458
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 4
- Record created
- Fri, Jul 3, 2026 3:40 PM
- Record versioned
- Mon, Jul 27, 2026 12:34 AM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 southbound, Jct 7 to Jct 6, hard shoulder closure
Active Roadworks National HighwaysExpected to clear in 3 days 12 hours
M40 southbound, Jct 7 to Jct 6, hard shoulder closure
M40 Southbound, Jct 8a exit slip road lane one closure
Planned Roadworks National HighwaysExpected to clear in 7 hours 16 minutes
M40 Southbound, Jct 8a exit slip road lane one closure
M40 Southbound, Jct 11 to Jct 10, lane 1 and 2 closure.
Planned Roadworks National HighwaysStarts in 9 hours 16 minutes
M40 Southbound, Jct 11 to Jct 10, lane 1 and 2 closure.
M40 northbound, Jct 9 to Jct 10, lane 3 and 2 closure
Planned Roadworks National HighwaysStarts in 9 hours 16 minutes
M40 northbound, Jct 9 to Jct 10, lane 3 and 2 closure
M40 Southbound, Jct 11 to Jct 10 lane 2 and 3 closure
Cleared Roadworks National HighwaysExpected to clear in 18 hours 16 minutes
M40 Southbound, Jct 11 to Jct 10 lane 2 and 3 closure
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
Cleared Roadworks National HighwaysExpected to clear in 18 hours 16 minutes
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure