M40 southbound, Jct 2 to Jct 1a, hard shoulder closure
ClearedM40 southbound, Jct 2 to Jct 1a, hard shoulder closure
- Start time
- Fri, May 22, 2026 6:00 AM
- Expected end
- Fri, May 22, 2026 6:00 PM
- Duration
- 12 hours
- Road
- M40 – M40 Southbound Between J2 And J1A
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, May 12, 2026 11:24 AM
- Last updated
- Fri, May 22, 2026 12:52 PM
- Cleared
- Fri, May 22, 2026 6:00 PM
- Latest update: M40 southbound, Jct 2 to Jct 1a, hard shoulder closure
- Coordinates
- 51.590822, -0.615448
- Latitude span
- 51.589440 – 51.591469
- Longitude span
- -0.617622 – -0.610779
- Bounding box centre
- 51.590455, -0.614201
- Location descriptions
-
- M40 southbound between J2 and J1A
- Feed validity status
- Suspended
- Overall feed start
- Fri, May 22, 2026 6:00 AM
- Overall feed end
- Fri, May 22, 2026 6:00 PM
- Feed window length
- 12 hours
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M40 southbound between J2 and J1A
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 5 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {16524750-4191-49F0-81E2-2781BC2BE10D}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 454 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.591191 -0.616699 51.59119 -0.616697 51.590866 -0.615597 51.590019 -0.612734 51.58944 -0.610779
Segment 2
3 coordinate pairs- Description
- M40 southbound between J2 and J1A
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 5 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {875BE831-F8B6-48ED-A93E-E31959A664F3}
- Linear Element Type
- B Carriageway
- From Distance
- 292 m
- To Distance
- 363 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.591469 -0.617622 51.591212 -0.616756 51.591191 -0.616699
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -0.616699, 51.591191
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.616699,
51.591191
],
[
-0.616697,
51.59119
],
[
-0.615597,
51.590866
],
[
-0.612734,
51.590019
],
[
-0.610779,
51.58944
],
[
-0.617622,
51.591469
],
[
-0.616756,
51.591212
],
[
-0.616699,
51.591191
]
]
]
}
View road section coordinates
[
[
[
-0.616699,
51.591191
],
[
-0.616697,
51.59119
],
[
-0.615597,
51.590866
],
[
-0.612734,
51.590019
],
[
-0.610779,
51.58944
],
[
-0.617622,
51.591469
],
[
-0.616756,
51.591212
],
[
-0.616699,
51.591191
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Suspended
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, May 12, 2026 11:24 AM
- Record versioned
- Fri, May 22, 2026 12:52 PM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Northbound Jct 11 exit slip road lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 10 hours 28 minutes
M40 Northbound Jct 11 exit slip road lane 1 closure
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
Active Roadworks National HighwaysExpected to clear in 1 day 4 hours
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
M40 Southbound Jct 6 to Jct 4 lane 2 and 3 closure
Planned Roadworks National HighwaysStarts in 1 hour 28 minutes
M40 Southbound Jct 6 to Jct 4 lane 2 and 3 closure
M40 Southbound Jct 12 to Jct 10 lane 1 and lane 2 closures.
Planned Roadworks National HighwaysStarts in 1 hour 28 minutes
M40 Southbound Jct 12 to Jct 10 lane 1 and lane 2 closures.
M40 Southbound Jct 2 to Jct 1a hard shoulder, lane 1 and 2 closure
Cleared Roadworks National HighwaysExpected to clear in 10 hours 28 minutes
M40 Southbound Jct 2 to Jct 1a hard shoulder, lane 1 and 2 closure
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
Cleared Roadworks National HighwaysCleared 6 hours 31 minutes ago
M40 Northbound Jct 6 to Jct 7 hard shoulder closure