M40 southbound, Jct 2 exit slip road closure
ClearedM40 southbound, Jct 2 exit slip road closure
- Start time
- Fri, May 1, 2026 9:15 PM
- Expected end
- Sat, May 2, 2026 5:00 AM
- Duration
- 7 hours 45 minutes
- Road
- M40 – M40 J2 Southbound Exit
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, May 1, 2026 7:38 AM
- Last updated
- Fri, May 1, 2026 9:24 PM
- Cleared
- Sat, May 2, 2026 5:00 AM
- Latest update: M40 southbound, Jct 2 exit slip road closure
- Coordinates
- 51.595873, -0.631725
- Latitude span
- 51.595143 – 51.597105
- Longitude span
- -0.637263 – -0.627847
- Bounding box centre
- 51.596124, -0.632555
- Location descriptions
-
- M40 J2 southbound exit
- M40 southbound between J3 and J2
- Feed validity status
- Planned
- Overall feed start
- Fri, May 1, 2026 9:15 PM
- Overall feed end
- Sat, May 2, 2026 5:00 AM
- Feed window length
- 7 hours 45 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
8 coordinate pairs- Description
- M40 J2 southbound exit
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {58B3BA59-A87E-4F39-95FA-A33D733A9F0C}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 397 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.596133 -0.633329 51.595764 -0.631445 51.595449 -0.629895 51.595163 -0.628489 51.595144 -0.628389 51.595143 -0.628316 51.595159 -0.628143 51.595207 -0.627847
Segment 2
5 coordinate pairs- Description
- M40 southbound between J3 and J2
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 5 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {6FC47CD7-B9FD-49C9-BB2D-DE8F1ECE43E7}
- Linear Element Type
- B Carriageway
- From Distance
- 31 m
- To Distance
- 324 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.597105 -0.637263 51.597061 -0.637066 51.596493 -0.634657 51.596399 -0.634256 51.596133 -0.633329
- Geometry type
- MultiLineString
- Geometry points
- 13
- First coordinate pair
- -0.633329, 51.596133
- Road section segments
- 1
- Road section points
- 13
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.633329,
51.596133
],
[
-0.631445,
51.595764
],
[
-0.629895,
51.595449
],
[
-0.628489,
51.595163
],
[
-0.628389,
51.595144
],
[
-0.628316,
51.595143
],
[
-0.628143,
51.595159
],
[
-0.627847,
51.595207
],
[
-0.637263,
51.597105
],
[
-0.637066,
51.597061
],
[
-0.634657,
51.596493
],
[
-0.634256,
51.596399
],
[
-0.633329,
51.596133
]
]
]
}
View road section coordinates
[
[
[
-0.633329,
51.596133
],
[
-0.631445,
51.595764
],
[
-0.629895,
51.595449
],
[
-0.628489,
51.595163
],
[
-0.628389,
51.595144
],
[
-0.628316,
51.595143
],
[
-0.628143,
51.595159
],
[
-0.627847,
51.595207
],
[
-0.637263,
51.597105
],
[
-0.637066,
51.597061
],
[
-0.634657,
51.596493
],
[
-0.634256,
51.596399
],
[
-0.633329,
51.596133
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Fri, May 1, 2026 7:38 AM
- Record versioned
- Fri, May 1, 2026 9:24 PM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
Active Roadworks National HighwaysExpected to clear in 14 hours 59 minutes
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
M40 northbound Warwick services entry slip road closure
Planned Roadworks National HighwaysStarts in 13 hours 15 minutes
M40 northbound Warwick services entry slip road closure
M40 Southbound Jct 15 to Jct 11 lane 3 closure
Planned Roadworks National HighwaysStarts in 13 hours 15 minutes
M40 Southbound Jct 15 to Jct 11 lane 3 closure
M40 northbound Jct 10 entry slip road closure
Planned Roadworks National HighwaysStarts in 13 hours 15 minutes
M40 northbound Jct 10 entry slip road closure
M40 Southbound Jct 5, lane 3 and lane 2 closures
Planned Roadworks National HighwaysStarts in 13 hours 15 minutes
M40 Southbound Jct 5, lane 3 and lane 2 closures
M40 Southbound Jct 4 to Jct 2 lane 3 closure
Planned Roadworks National HighwaysStarts in 13 hours 15 minutes
M40 Southbound Jct 4 to Jct 2 lane 3 closure