M40 Southbound Jct 1a to Jct 1, hardshoulder closure
ClearedM40 Southbound Jct 1a to Jct 1, hardshoulder closure
- Start time
- Fri, Oct 2, 2026 8:30 AM
- Expected end
- Fri, Oct 2, 2026 2:30 PM
- Duration
- 6 hours
- Road
- M40 – M40 Southbound Within J1A Before M25 J16 Clockwise Access
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Sep 29, 2026 11:04 AM
- Last updated
- Fri, Oct 2, 2026 2:23 PM
- Cleared
- Fri, Oct 2, 2026 2:30 PM
- Latest update: M40 Southbound Jct 1a to Jct 1, hardshoulder closure
- Coordinates
- 51.562322, -0.543492
- Latitude span
- 51.561735 – 51.562587
- Longitude span
- -0.545645 – -0.538806
- Bounding box centre
- 51.562161, -0.542226
- Location descriptions
-
- M40 southbound within J1A before M25 J16 clockwise access
- M40 southbound between J2 and J1A
- Feed validity status
- Planned
- Overall feed start
- Fri, Oct 2, 2026 8:30 AM
- Overall feed end
- Fri, Oct 2, 2026 2:30 PM
- Feed window length
- 6 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M40 southbound within J1A before M25 J16 clockwise access
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {9A6E26FB-2BB4-43B7-9B45-16D32218A81A}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 405 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.562454 -0.544542 51.562434 -0.544326 51.562016 -0.541022 51.561735 -0.538806
Segment 2
3 coordinate pairs- Description
- M40 southbound between J2 and J1A
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 5 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {71581B09-0D3E-4126-B363-E8EC58A6D072}
- Linear Element Type
- B Carriageway
- From Distance
- 364 m
- To Distance
- 441 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.562587 -0.545645 51.562577 -0.545563 51.562454 -0.544542
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- -0.544542, 51.562454
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.544542,
51.562454
],
[
-0.544326,
51.562434
],
[
-0.541022,
51.562016
],
[
-0.538806,
51.561735
],
[
-0.545645,
51.562587
],
[
-0.545563,
51.562577
],
[
-0.544542,
51.562454
]
]
]
}
View road section coordinates
[
[
[
-0.544542,
51.562454
],
[
-0.544326,
51.562434
],
[
-0.541022,
51.562016
],
[
-0.538806,
51.561735
],
[
-0.545645,
51.562587
],
[
-0.545563,
51.562577
],
[
-0.544542,
51.562454
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Sep 29, 2026 11:04 AM
- Record versioned
- Fri, Oct 2, 2026 2:23 PM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Southbound, Jct 10 to Jct 9 hard shoulder closure
Planned Roadworks National HighwaysExpected to clear in 1 day 6 hours
M40 Southbound, Jct 10 to Jct 9 hard shoulder closure
M40 Northbound, Jct 11 entry slip road closure
Planned Roadworks National HighwaysStarts in 4 hours 39 minutes
M40 Northbound, Jct 11 entry slip road closure
M40 Southbound, Jct 11 to Jct 10 hard shoulder, lane 1 and 2 closure
Cleared Roadworks National HighwaysExpected to clear in 12 hours 24 minutes
M40 Southbound, Jct 11 to Jct 10 hard shoulder, lane 1 and 2 closure
M40 Southbound Jct 5 to Jct 4 hard shoulder and lane 1 and 2 closure
Planned Roadworks National HighwaysStarts in 3 hours 24 minutes
M40 Southbound Jct 5 to Jct 4 hard shoulder and lane 1 and 2 closure
M40 Southbound Jct 4 to Jct 3 lane 3 and lane 2 closures.
Planned Roadworks National HighwaysStarts in 3 hours 24 minutes
M40 Southbound Jct 4 to Jct 3 lane 3 and lane 2 closures.
A40 Eastbound Jct 1 exit slip road lane 1 closure
Planned Roadworks National HighwaysStarts in 3 hours 24 minutes
A40 Eastbound Jct 1 exit slip road lane 1 closure