M40 Southbound Jct 15 entry slip road closure
ClearedM40 Southbound Jct 15 entry slip road closure
- Start time
- Tue, Nov 11, 2025 10:15 PM
- Expected end
- Wed, Nov 12, 2025 6:00 AM
- Duration
- 7 hours 45 minutes
- Road
- M40 – M40 Southbound Between J15 And J14
- Category
- Construction Work
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Construction Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Jun 30, 2025 2:28 PM
- Last updated
- Tue, Nov 11, 2025 9:33 PM
- Cleared
- Wed, Nov 12, 2025 6:00 AM
- Latest update: M40 Southbound Jct 15 entry slip road closure
- Coordinates
- 52.258421, -1.607161
- Latitude span
- 52.257164 – 52.260017
- Longitude span
- -1.611629 – -1.602161
- Bounding box centre
- 52.258591, -1.606895
- Location descriptions
-
- M40 southbound between J15 and J14
- M40 J15 southbound access
- Feed validity status
- Planned
- Overall feed start
- Tue, Nov 11, 2025 10:15 PM
- Overall feed end
- Wed, Nov 12, 2025 6:00 AM
- Feed window length
- 7 hours 45 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
10 coordinate pairs- Description
- M40 southbound between J15 and J14
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {AC2AFE07-D031-41D3-A8D0-E144DC89178D}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 310 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.258032 -1.606475 52.257866 -1.605847 52.257656 -1.604955 52.25762 -1.604765 52.257519 -1.604341 52.257428 -1.603873 52.257327 -1.603317 52.257226 -1.602688 52.257171 -1.602234 52.257164 -1.602161
Segment 2
11 coordinate pairs- Description
- M40 J15 southbound access
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {B3DDA1A5-4D37-4ACF-B528-783EDBAA8E11}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 15 m
- To Distance
- 435 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.260017 -1.611629 52.259924 -1.611552 52.259786 -1.611408 52.259681 -1.611235 52.259581 -1.61102 52.259459 -1.610713 52.259145 -1.609846 52.258958 -1.609294 52.258801 -1.608837 52.258441 -1.607713 52.258032 -1.606475
- Geometry type
- MultiLineString
- Geometry points
- 21
- First coordinate pair
- -1.606475, 52.258032
- Road section segments
- 1
- Road section points
- 21
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.606475,
52.258032
],
[
-1.605847,
52.257866
],
[
-1.604955,
52.257656
],
[
-1.604765,
52.25762
],
[
-1.604341,
52.257519
],
[
-1.603873,
52.257428
],
[
-1.603317,
52.257327
],
[
-1.602688,
52.257226
],
[
-1.602234,
52.257171
],
[
-1.602161,
52.257164
],
[
-1.611629,
52.260017
],
[
-1.611552,
52.259924
],
[
-1.611408,
52.259786
],
[
-1.611235,
52.259681
],
[
-1.61102,
52.259581
],
[
-1.610713,
52.259459
],
[
-1.609846,
52.259145
],
[
-1.609294,
52.258958
],
[
-1.608837,
52.258801
],
[
-1.607713,
52.258441
],
[
-1.606475,
52.258032
]
]
]
}
View road section coordinates
[
[
[
-1.606475,
52.258032
],
[
-1.605847,
52.257866
],
[
-1.604955,
52.257656
],
[
-1.604765,
52.25762
],
[
-1.604341,
52.257519
],
[
-1.603873,
52.257428
],
[
-1.603317,
52.257327
],
[
-1.602688,
52.257226
],
[
-1.602234,
52.257171
],
[
-1.602161,
52.257164
],
[
-1.611629,
52.260017
],
[
-1.611552,
52.259924
],
[
-1.611408,
52.259786
],
[
-1.611235,
52.259681
],
[
-1.61102,
52.259581
],
[
-1.610713,
52.259459
],
[
-1.609846,
52.259145
],
[
-1.609294,
52.258958
],
[
-1.608837,
52.258801
],
[
-1.607713,
52.258441
],
[
-1.606475,
52.258032
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Construction Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Jun 30, 2025 2:28 PM
- Record versioned
- Tue, Nov 11, 2025 9:33 PM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Southbound Jct 6 to Jct 4 lane 2 and 3 closure
Planned Roadworks National HighwaysExpected to clear in 6 hours 29 minutes
M40 Southbound Jct 6 to Jct 4 lane 2 and 3 closure
M40 Southbound Jct 12 to Jct 10 lane 1 and lane 2 closures.
Planned Roadworks National HighwaysExpected to clear in 6 hours 29 minutes
M40 Southbound Jct 12 to Jct 10 lane 1 and lane 2 closures.
M40 Northbound Jct 11 exit slip road lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 6 hours 29 minutes
M40 Northbound Jct 11 exit slip road lane 1 closure
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
Active Roadworks National HighwaysExpected to clear in 1 day 28 minutes
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
M40 Southbound Jct 2 to Jct 1a hard shoulder, lane 1 and 2 closure
Cleared Roadworks National HighwaysExpected to clear in 6 hours 29 minutes
M40 Southbound Jct 2 to Jct 1a hard shoulder, lane 1 and 2 closure
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
Cleared Roadworks National HighwaysCleared 10 hours 30 minutes ago
M40 Northbound Jct 6 to Jct 7 hard shoulder closure