M40 Southbound Jct 12 to Jct 11, hardshoulder closure
ClearedM40 Southbound Jct 12 to Jct 11, hardshoulder closure
- Start time
- Tue, Jul 14, 2026 8:30 PM
- Expected end
- Fri, Jul 17, 2026 10:59 PM
- Duration
- 2 days 18 hours 30 minutes
- Road
- M40 – M40 Southbound Between J12 And J11
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jul 15, 2026 8:03 AM
- Last updated
- Fri, Jul 17, 2026 2:18 PM
- Cleared
- Fri, Jul 17, 2026 3:00 PM
- Latest update: M40 Southbound Jct 12 to Jct 11, hardshoulder closure
- Coordinates
- 52.156313, -1.425966
- Latitude span
- 52.153759 – 52.158603
- Longitude span
- -1.428024 – -1.423707
- Bounding box centre
- 52.156181, -1.425866
- Location descriptions
-
- M40 southbound between J12 and J11
- Feed validity status
- Active
- Overall feed start
- Tue, Jul 14, 2026 8:30 PM
- Overall feed end
- Fri, Jul 17, 2026 10:59 PM
- Feed window length
- 3 days 2 hours 29 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M40 southbound between J12 and J11
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {223AE493-9CFB-4DFB-AB76-F3036D7943B3}
- Linear Element Type
- B Carriageway
- From Distance
- 861 m
- To Distance
- 1,177 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.158603 -1.428024 52.158332 -1.427744 52.157257 -1.426749 52.156119 -1.425791
Segment 2
5 coordinate pairs- Description
- M40 southbound between J12 and J11
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {9384FCB6-C790-461D-B7BD-BC206804295D}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 298 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.156119 -1.425791 52.156111 -1.425785 52.155894 -1.425598 52.154621 -1.424503 52.153759 -1.423707
- Geometry type
- MultiLineString
- Geometry points
- 9
- First coordinate pair
- -1.428024, 52.158603
- Road section segments
- 1
- Road section points
- 9
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.428024,
52.158603
],
[
-1.427744,
52.158332
],
[
-1.426749,
52.157257
],
[
-1.425791,
52.156119
],
[
-1.425791,
52.156119
],
[
-1.425785,
52.156111
],
[
-1.425598,
52.155894
],
[
-1.424503,
52.154621
],
[
-1.423707,
52.153759
]
]
]
}
View road section coordinates
[
[
[
-1.428024,
52.158603
],
[
-1.427744,
52.158332
],
[
-1.426749,
52.157257
],
[
-1.425791,
52.156119
],
[
-1.425791,
52.156119
],
[
-1.425785,
52.156111
],
[
-1.425598,
52.155894
],
[
-1.424503,
52.154621
],
[
-1.423707,
52.153759
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Jul 15, 2026 8:03 AM
- Record versioned
- Fri, Jul 17, 2026 2:18 PM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Southbound, Jct 8a exit slip road lane one closure
Planned Roadworks National HighwaysExpected to clear in 4 hours 4 minutes
M40 Southbound, Jct 8a exit slip road lane one closure
M40 Southbound Jct 14 to Jct 13 hardshoulder closure.
Planned Roadworks National HighwaysExpected to clear in 2 days 9 hours
M40 Southbound Jct 14 to Jct 13 hardshoulder closure.
M40 Southbound, Jct 9 to Jct 8a, hard shoulder closure.
Planned Roadworks National HighwaysExpected to clear in 1 day 9 hours
M40 Southbound, Jct 9 to Jct 8a, hard shoulder closure.
M40 Southbound Jct 5 to Jct 4 lane 3 closure
Planned Roadworks National HighwaysStarts in 7 hours 19 minutes
M40 Southbound Jct 5 to Jct 4 lane 3 closure
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
Planned Roadworks National HighwaysStarts in 7 hours 19 minutes
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
M40 northbound, Jct 5 exit slip road closure
Planned Roadworks National HighwaysStarts in 7 hours 19 minutes
M40 northbound, Jct 5 exit slip road closure