M40 Southbound Jct 11 to Jct 10, lane 3 closure
ClearedM40 Southbound Jct 11 to Jct 10, lane 3 closure
- Start time
- Wed, Jul 22, 2026 9:15 PM
- Expected end
- Thu, Jul 23, 2026 5:00 AM
- Duration
- 7 hours 45 minutes
- Road
- M40 – M40 Southbound Between J11 And J10
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 3 closed, 1 of 3 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Jul 10, 2026 2:04 PM
- Last updated
- Thu, Jul 23, 2026 12:35 AM
- Cleared
- Thu, Jul 23, 2026 5:00 AM
- Latest update: M40 Southbound Jct 11 to Jct 10, lane 3 closure
- Coordinates
- 52.050056, -1.305852
- Latitude span
- 52.041675 – 52.059810
- Longitude span
- -1.307600 – -1.304328
- Bounding box centre
- 52.050743, -1.305964
- Location descriptions
-
- M40 southbound between J11 and J10
- Feed validity status
- Suspended
- Overall feed start
- Wed, Jul 22, 2026 9:15 PM
- Overall feed end
- Thu, Jul 23, 2026 5:00 AM
- Feed window length
- 7 hours 45 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- M40 southbound between J11 and J10
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {99714056-E8C5-4078-9E18-76949623CFCC}
- Linear Element Type
- B Carriageway
- From Distance
- 298 m
- To Distance
- 1,334 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.05981 -1.3076 52.058049 -1.307294 52.057202 -1.307147 52.056356 -1.307 52.052288 -1.306275 52.050552 -1.305964
Segment 2
4 coordinate pairs- Description
- M40 southbound between J11 and J10
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {4722B6FF-493D-4219-9738-662F46B18969}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 569 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.046765 -1.305239 52.042702 -1.304513 52.041955 -1.304378 52.041675 -1.304328
Segment 3
4 coordinate pairs- Description
- M40 southbound between J11 and J10
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {46E9B783-20D7-45F0-A80C-E74B942B7C3E}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 424 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.050552 -1.305964 52.04876 -1.305644 52.047355 -1.305345 52.046765 -1.305239
- Geometry type
- MultiLineString
- Geometry points
- 14
- First coordinate pair
- -1.307600, 52.059810
- Road section segments
- 1
- Road section points
- 14
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.3076,
52.05981
],
[
-1.307294,
52.058049
],
[
-1.307147,
52.057202
],
[
-1.307,
52.056356
],
[
-1.306275,
52.052288
],
[
-1.305964,
52.050552
],
[
-1.305239,
52.046765
],
[
-1.304513,
52.042702
],
[
-1.304378,
52.041955
],
[
-1.304328,
52.041675
],
[
-1.305964,
52.050552
],
[
-1.305644,
52.04876
],
[
-1.305345,
52.047355
],
[
-1.305239,
52.046765
]
]
]
}
View road section coordinates
[
[
[
-1.3076,
52.05981
],
[
-1.307294,
52.058049
],
[
-1.307147,
52.057202
],
[
-1.307,
52.056356
],
[
-1.306275,
52.052288
],
[
-1.305964,
52.050552
],
[
-1.305239,
52.046765
],
[
-1.304513,
52.042702
],
[
-1.304378,
52.041955
],
[
-1.304328,
52.041675
],
[
-1.305964,
52.050552
],
[
-1.305644,
52.04876
],
[
-1.305345,
52.047355
],
[
-1.305239,
52.046765
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Suspended
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Jul 10, 2026 2:04 PM
- Record versioned
- Thu, Jul 23, 2026 12:35 AM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Southbound, Jct 8a exit slip road lane one closure
Planned Roadworks National HighwaysExpected to clear in 1 hour 12 minutes
M40 Southbound, Jct 8a exit slip road lane one closure
M40 Southbound, Jct 9 to Jct 8a, hard shoulder closure.
Planned Roadworks National HighwaysExpected to clear in 1 day 6 hours
M40 Southbound, Jct 9 to Jct 8a, hard shoulder closure.
M40 southbound, Jct 7 to Jct 6, hard shoulder closure
Active Roadworks National HighwaysExpected to clear in 6 hours 11 minutes
M40 southbound, Jct 7 to Jct 6, hard shoulder closure
M40 Southbound Jct 5 to Jct 4 lane 3 closure
Planned Roadworks National HighwaysStarts in 4 hours 27 minutes
M40 Southbound Jct 5 to Jct 4 lane 3 closure
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
Planned Roadworks National HighwaysStarts in 4 hours 27 minutes
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
M40 northbound, Jct 5 exit slip road closure
Planned Roadworks National HighwaysStarts in 4 hours 27 minutes
M40 northbound, Jct 5 exit slip road closure